Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[10:46] Chair: All this meeting to order. It is the November 17th Standish Town Workshop Council. Let's rise for the Pledge of Allegiance.
[10:57] Public commenter: I pledge allegiance to the flag of the United States of America and to the Republic for which it stands, one nation under God, indivisible, with liberty and justice for all.
[11:14] Chair: I guess I'll do roll call. Councilor Macri? Here. Councilor Braun? Here. Councilor Thomas is here. Councilor Libby? Here. Councilor Strube? Here. Here. Councilor Watson is excused. So tonight's council workshop meeting, we are going to be discussing improvements to the Route 25 corridor. I'll just give you a background of where we're at. Last year, our engineers gave a presentation to the council about a two-step improvement to the Route 25 corridor. The council decided to move ahead with some survey work to figure out where the road lies. And now we're back after that survey work has been completed. So I'll hand the meeting over to you.
[11:57] Unidentified speaker (likely DOT/Engineering Consultant): Thank you very much, chair and council, for having us here tonight to talk. As we've just said, last year we did a, we'll call it just a conceptual design. It was based on aerial and photography and LiDAR survey from the DOT, not from the DOT, but from the state of Maine, very conceptual. So since then, what we've done to refine our design is essentially do a real survey, and that really helps us figure out where this fits on the face of the earth, and it helps us figure out what those impacts are going to be. Because we knew that in order to get these, there were going to be some pretty significant impacts to abutting properties. So tonight, we'll go through just, and I forgot introduction, sorry, but I'll go back to who I am in just a moment. So tonight, we're to go just kind of briefly back through the items we've already discussed at the last meeting just as a refresher we'll go through what the proposed improvements look like now that we've had an opportunity to remind them refine them to what i would call to be a 30 design which is a point where you can usually start really thinking about what the future funding is going to be for the project and how what mechanisms you're going to use for funding we'll look through the impacts at each of the locations for the total impacts you'll see some slides that will show the impacts and i'll make sure to point those out for people's attention and then we'll talk about what the revised costs are as a result of the face of the earth survey as well as what some funding alternatives are moving forward for the town's portion of the work so since i forgot introductions i'm ryan barnes i'm senior project manager with ljb engineering out of south portland maine we've been working with the town for quite a few years now and this is a project that i know very well because I used to live in Standish and I know this corridor. I'm very familiar with the traffic patterns on it. So just looking at what the total study area is, essentially we're looking at the compact urban area that surrounds kind of the Hannaford, Georgie Jack school area. So it extends down 25 to essentially Cape Road and then to the east over to Randall Road. So last year, yeah it was last year we did the initial impact study for this to figure out what our you know very conceptual high level costs and everything would be in order to do that we had to look at traffic levels so we collected traffic data along the corridor we adjusted that for 2026 volumes we considered that the base year for this study and then we projected them out to 2046. so essentially most roads are considered to have a 20-year lifespan we wanted to make sure that whatever we looked at would be something that would still be functioning in a timeline now so that's what these numbers represent. Looking at those, the next step we did was to do the capacity analysis. So capacity analysis is kind of like the letter grades in school. So A means you're really good, F means you're probably in trouble. Looking at the existing traffic volumes, so on the right-hand side where you see the highlighted cells, all the highlighted cells are considered failed as far as main AOT and national standards are considered. So those are ones with significant delays. And that's not just a delay, that's an average delay for all the vehicles in that queue. So that means that on average, for example, someone who's going on Route 25 westbound turning right at, or going through, I should say, at Route 35 is going to experience about 166 seconds of delay, or roughly three minutes of added delay for that when we add that to the other delays. other places you start to really see some delays through the corridor. So once we did that we looked at projecting out if we made improvements what could we get these to be improved at. We went to a short-term solution which is essentially signalization and some minor work so it would be extending turn lanes adding a westbound turn lane at 25 and 35 and mostly doing a lot of restriking but the biggest thing that this would include is placing the signal at Route 25 and 35 because the system is, well, I'm afraid to open the cabinet because it's probably one of the oldest existing signal controllers in the state. And I would be concerned that if something went wrong, I would not be qualified to fix it or reprogram it. So it's time for that one to be replaced. The one at Colonial is a newer system, but it's still probably in the 20-plus year, 25-plus year range of how long that signal's been in place, which puts that system also at end of life. In fact, end of life for it would have been probably about a decade ago. So even though it's probably half the age, it's still beyond the capabilities of what modern technology would allow it to do for improvements. Next thing we did was look at long-term solutions. So long-term solutions would be creating either a two or a four-lane section between Oak Hill Road and Route 35. It would be making a five-lane section from essentially the bottom of the hill by the smoke shop all the way up to Route 35. And it would be adding some turn lanes onto Route 35 as well and changing the configuration a little bit for better lane utilization. So on the left-hand column with the yellow, you can see what it looks like in 2026 as no build, which means we made zero improvements. You can see that there are definitely improvements moving over to the 2026 short-term solution. So that's replacing the signals at Colonial, replacing the signal at 35, as well as making some minor modifications to turn lanes and striping in that area to help get vehicles through it more safely. then stepped ahead to the 2046 future build scenario which is what we're calling the long-term solution and that's where we see where we actually get some pretty significant improvements I do just want to point out that there are some movements that are showing it's just dashes in here that's not because they're operating perfectly that's because those movements either didn't exist in one of the scenarios so the example I use is that the route 35 both directions is currently striped as a three left and a right. Set that wrong. It's a three right and a left. It's a configuration that ends up bottlenecking traffic. So we're looking at trying to better utilize the existing pavement you have to help get traffic through without having as much weeping and without having as many people get stuck behind that one car that can't turn. If I'm going too fast at any point of the recap, please just yell. So looking at the improvements These are all we're showing them these are the long-term improvements, but I will highlight what the short-term that we go through this is the portion between Oak Hill and 35 you'll see currently we're planning on a center two-way left turn lane. We also believe that you'll see the dashed line The most work in this area here we are expecting in order to get better utilization of Traffic at this intersection in the long term we would be adding a through lane We need to extend that through lane long enough so that those cars have an opportunity to merge So even though it is a traditional three-lane section, it does have that merging outside lane as well So it is technically four lanes, but merging lanes don't typically get counted as additional lanes from a traffic capacity standpoint I'll point out here, we mentioned impacts. So everywhere you see these green shaded areas is right-of-way impacts resulting from this project those can extend simply as just grading so just what it takes to be able to build off of the back edge of the pavement down to existing grade but in some cases kind of in the top left corner where those green sections are that proposed sidewalk would end up in the would require permanent right-of-way taking as well as grading adjustments so I should have waited one because I just did a spoiler alert so again we're adding the fourth lane that would be for that merging traffic so essentially if you look at two lanes coming together if the merge is too short we've all seen where nobody wants to use that outer lane by making it the correct length or the appropriate length it allows people to feel safe using both lanes because they know that they'll have time to merge in and it really helps increase the volume of traffic that can go through that signal the second lane never gets as much volume as the primary lane does but if you don't have enough merge you're looking at probably 10 percent additional traffic flow with appropriate length you're looking at somewhere 60 plus percent additional flow so that extra turning lane is important so this would be an example of what's going on for both the short and the long term so both intersections have some work if they need to be done this is the intersection of route 25 and 35 so we would be adding and i apologize that this got rotated i didn't realize that until just now so 25 is up and down 35 is side to side which is opposite of the previous plan but we would be adding that additional through lane under 25 in both directions we would also be converting the existing through left lanes to and a right lane to a left and a through right again that means that the left-hand traffic won't bottleneck those cars anymore and then again a full signal upgrade and we would be planning on doing this as a full mast arm system rather than span wire for a couple of reasons they hold up better they handle truck galloping which is created by a truck on span wires ends up prematurely fatiguing your system and just end up being a more resilient system oh i should just point out that existing sidewalk areas are being reconnected as part of this project we're not planning on so then as we move down the 25 corridor so this is the area between 25 and 35 and colonial drive we would be adding an additional through lane in both directions we would be adding a center turn lane as more development comes in and looking at the traffic or that collision data within the area turning movements are definitely one of your biggest problems it's causing a lot of accidents and it's causing a lot of slowdowns and it's also just causing a lot of kind of chaos with drivers and drivers that don't know where they're going or driving erratically become dangerous drivers for everyone within the area so moving down to the signal at 25 and Colonial Drive changing outer lanes to be a through right lane instead of dedicated right lane so again we're making those are both currently right just dedicated right turn lanes we're going to make them through right so that we can add additional capacity through and again we're going to be upgrading the signal to include mast arms both of them will include new improved detection and advanced detection so essentially it'll be stop bar detection but it will also look further away so that it'll be able to help adjust especially during commuting hours that there's a big queue let's try to clear it ADA-compliant crossings, as well as interconnection with the signal at Route 25 and 35, so that the signals will talk to each other, so that as you start going through Colonial Drive on your drive home, at the peak hour, you would then, in theory, if you're not speeding, be able to go straight through that next signal as well without having to stop. So that's where you really get your savings, is instead of getting stopped twice for prolonged periods of time, you're now getting stopped once for a shorter period of time, and then moving through the corridor to the south of the colonial drive intersection we're looking at continuing those added outbound lanes we would be eliminating the center turning lane once you get past the gas station or the family dollar and then we would eventually kind of neck everything back down to match into the existing roadway before you get to where randall road is so again we looked at what those impacts are see the green on the plans and step through so there is about an acre of so 0.8 acres of grading instruments that would be needed and roughly a tenth of an acre a little over 0.12 acres for permanent right-of-way taking so you're looking at roughly an acre of needed right-of-way takings to be able to there would be five hydrants need to be relocated which means we'll have to be coordinating with the water district that is going to become a very strong conversation as we move forward because it's aging infrastructure that they don't have a plan for replacing at the moment and to make it even more complicated as we widen out right now all the hydrants the water line actually runs essentially in the ditch line on 35 on the north side of the roadway once you find the roadway the hydrants that are now on the front side of the main we'll have to go to the back side of the main and trying to make a change over for that means shutting the main down and it's a dead end main so there's no loop so that becomes more problematic so all the more reason why we want to work with them and if there's a way to get your capital program to match their capital program so that the work could coincide and it could be replaced it would be better for everybody and it would hopefully short our shutdowns would be 47 utility poles are in this corridor that would need to be in place. So there are a lot of utility poles. Our numbers for the grading easements include a small amount of additional right-of-way for aerial rights for the utility poles, because once you force them to move the utility pole, you also have to get them 10 feet from the face of the pole back for them to be able to clear. So we try to include those, but those numbers are still very rough, because we're doing our best educated guess of where we think those new poles would end up, but ultimately it's going to have to be designed by c and b and when there's curvature to the roadway where those poles land in relationship to the edge of pavement can fluctuate and they also could be guy wires which would also need additional easement rights and as far as impacts go so that acre of impact is over approximately 31 different parcels so there's lots of property owners that would have to be in conversation hopefully with mr mccall more than mr barnes but we will figure that one out when we get to that point of the project. So from there, when we find our cost opinion, because, again, the original one was just based on a very conceptual sketch, and how we're able to actually try everything to scale everything up, we can see what impacts to driveways look like, we can now very easily see what impacts to properties look like. So this estimate doesn't include any removal of special or hazardous materials, which sometimes exist exists under our roadways, especially where gas stations exist. Doesn't include design, building, or construction advertising costs. This is all soft costs that would have to be included. Doesn't include local permitting. We don't anticipate any DEP permitting, but that's to be determined as those rules change a lot. So by the time we do this, there may be something we have to consider. Typical roadway buildups for the right of way impacts. We started with a rough fee of approximately a hundred thousand dollars an acre with a minimum fee of five thousand dollars per lot even if it's those are for ones that are under 500 square feet because typically that's d.o.t's cutoff where it would just be assumed to be five thousand dollars rather than actually coming up with a valuation so what does that mean so this is long so the construction cost for the long-term project is roughly 3.8 million dollars the anticipated right-of-way impacts and again this still needs refinement based on cnp and just in general because the plans are only at 30 usually you don't do right away until you're at 75 to 90 but we're estimating that to be around 250 000 again a lot of that is because there are small impacts on a lot of lots that are all equal to five thousand dollars but then the bigger ones are still assuming a hundred thousand dollars an acre which is roughly what has been used in this area in the past, but that's another thing that's been changing a lot recently as property values go up, so do the right-of-way prices. I will just, and I highlighted it here specifically, is that, again, we're projecting this out to 2020, not knowing when this project would originally get started, so this is carrying a 3% inflation rate over that 20 years, which is equal to roughly $3.7 million. We do it quicker, we save on the inflation, and the last two years, or the last year I should say since we did the previous study, 3% would be a very generous inflation rate. We'd be looking at closer to 5 to 7 for last year. But then 3% is typical inflation used for long stretches like 20 years. So that gives a total of $8.6 million, but again, if it's constructed sooner, there could be some significant savings. So as far as other alternatives, I always say, you know, when I'm trying to help my clients figure out how to fund a project, the first thing to do is look at having someone else pay for it first. So this project is very unique. It's a known choke point, I guess, or restriction in the main DOT roadway network. So I would be hopeful that we would be able to get DOT to help fund a portion of the project. They have one of their three family plans. So they have the LAP project, or locally administered projects, those have an 80-20 cost share, so 20% would be the responsibility of the municipality, 80% would be federal and state dollars. They have a little bit higher design requirement than if you weren't to use that funding, but the cost share offsets that completely. Something that lots of good luck with, this year is not a good year to ask DOT for money because they currently are in a shortage but we're hoping with the bond question that will be coming out in June that will jumpstart the work plan again. I think this year we're going to see the main ERT work plan as it initially gets presented to be very stagnant over the last few years and then hopefully in June they would issue a amended version that would include additional funding. Their options are the main useful partnership initiative. I know we've used that a couple of times in the town already that is a 50 cost share comes with a much lower threshold as far as the design goes i shouldn't say much lower but it comes with less threshold and it's got a max maximum cap of 750 000 from ut my preference would be to try to get you the ministry project first and use that as a backup just because the numbers are 20 and there's a much higher cap on the lap projects so it's possible you could get them to fund the entire project at that 80 20 match But if not, then hopefully they would at least chip in the $750,000 for the cost sharing. The other plan that's available, this one can be a little bit more challenging, is the Business Partnership Initiative. It's another one that's not funded this year because of the funding issues at DOT. So there is no new money for it, but it's up to a million dollars from DOT, but it's a one-third, one-third, one-third program. So, essentially, one-third of the funding would have to come from the town, one-third would have to come from businesses, it could be a grouping of businesses, but if a group wanted to set up a business initiative down in the Route 25 corridor that knows this will help them be able to develop their land, then they could essentially chip in an adequate amount to help make the project happen, and that would be what they would have to do if this project didn't go. With that, I would be happy to move on to questions, because I'm sure there were plenty. I'll be happy to go back to any slides that people would like to see. Fairly all fall sometimes.
[32:14] Chair: I'm going to open up questions to the public first. So if someone would like to speak, please come up to the podium and say your name.
[32:30] Public commenter: It's [address]. I'm pretty sure the cost would be astronomical with underground utilities
[32:39] Unidentified speaker (likely DOT/Engineering Consultant): but was that ever considered the cost would probably be 10 to 15 million dollars more underground area utilities and that's only if the utility companies agree to it quarters like this they typically don't because it's hard for them thank
[32:56] Public commenter: you I as someone who's lived here more than 50 years I love the idea of advanced lanes at the corner, advanced greens for left hand turns. And I think it looks like the way this way is better having the left hand turn lanes if I understood correctly, the left hand turn lanes advance and it's left hand left hand only. And then the right hand lane would go straight. Did I
[33:27] Unidentified speaker (likely DOT/Engineering Consultant): understand that? So yes, this having this setup would allow for the opportunity for the left-hand turns to have permitted and protected phasing okay they would get their dedicated green arrow and then after that they would still be able to potentially go but it would obviously okay because the current the
[33:43] Public commenter: current setup sets you up for getting t-boned by the guys who can't wait to go straight I think that's all I can think of at the moment thank you thank you
[33:54] Unidentified speaker (likely DOT/Engineering Consultant): ask a clarifying question to that the we don't have to do any groundwork to get that on 35 the change that she was talking about where today we have a left turn and straight in one lane for route 35 for 35 correct except that's what you were talking about is 35 right yes okay yeah that would just be restriping yes
[34:22] Public commenter: way, I think. Yes, 25 is. 25 is set up that way, so it's much, no, it's safe.
[34:29] Unidentified speaker (likely DOT/Engineering Consultant): Yeah, our issue is old technology to be able to make it to what? I mean, just doing the striping change would be a benefit because the left turners are no more, would be much less likely to block. One of the three were right turning vehicles, but at the same time, it does, I'm not sure that the controller would have the capability to do a permitted, a protected leading phase.
[34:54] Andrew Walton: Hello, I'm Andrew Walton from [street], Steep Falls. Do I have a time limit, Jen?
[35:02] Chair: No, there's not many people here tonight.
[35:04] Andrew Walton: I will be as quick as possible. So when I saw this plan, I thought back to our walking audit that we did at the end of August, and this doesn't improve our walking ability. A couple of things that I noticed where this intersection here even in the long term doesn't create for ways of going around and I was trying to think in 20 years we still aren't going to have a way around that intersection I think that everybody can think 20 years ahead and think that we're probably going to need that. that. Probably development on that other opposing corner there, possibly soon. One of the things that really struck me was that Georgie Jack is so close to this intersection and we're still not connecting it to the school. It's so tiny. We have the opportunity to actually have kids go to school from some of the new developments or Oak Hill just by adding a little bit of sidewalk all within a half a mile of school. A couple other things I'm worried about are the center turn lane. I've been watching the North Wyndham Moves project quite closely. They're trying to get rid of that center turn lane it's really dangerous when you have two opposing cars going at each other and looking at in front of aroma joe's so right now you have particularly in the morning when people are getting coffee you have people in kind of the breakdown lane but some of them can't get in there if we have a center turn lane you have people that are in the normal travel lane and then you're going to get people going into that turn lane to go around them and then you're going to have people coming at them trying to turn into Aroma Jones so it makes no sense to me another question I had was coming out of Oak Hill extension is difficult right now. I've done it several times on my bicycle and had to wait many, minutes, definitely an F. It is very difficult to get out of now. I don't see merging traffic coming at you how it's going to be easier to get out of that road. It's going to be very, difficult. difficult. And I see, especially on this section, more so than on the other side of the intersection, accidents happening more frequently because the drivers are having to make a lot of decisions in a really short area. And there's no brakes. There's just no brakes in traffic today. And if that intersection is doing what it's supposed to do, which we're seeing with the 114 and 35 intersection, that traffic is going to be flowing through there very, fast. And you're not going to be able to get out of Oak Hill. You're going to put your life in your hands getting out of it, which is going to cause an accident. And you're also not going to be looking for bicycles and pedestrians because you're so stressed out trying to get out into traffic. Georgie Jack. The plan doesn't seem to account for increased development at Rose Lane as well. We're seeing that development already. This doesn't seem to piece into it at all. Can you elaborate on that? Yeah, so there's apartments going down Rose Lane right now.
[39:34] Unidentified speaker (likely DOT/Engineering Consultant): What is it that's not piecing together?
[39:36] Andrew Walton: the increased traffic coming out of both sides in into this how people are going to be able to
[39:44] Unidentified speaker (likely DOT/Engineering Consultant): get out so the advantage to a two-way sign left turn lane is that allows for two-stage gap acceptance so essentially the person coming out can move into the turn lane and then merge into
[39:54] Andrew Walton: the right but with a wider road you're coming out of rose lane to take a left let's say right you've got a long stretch of road you've got multiple lanes you need multiple lanes of traffic to stop for you to get out or for there to be a gap so close to the intersection that's
[40:16] Unidentified speaker (likely DOT/Engineering Consultant): already there i don't see that happening you're only looking at one direction when you do two stage gap because that way you're able to move over and then safely get into the lane so you're only trying to cross one direction at a time not two.
[40:32] Andrew Walton: Right and then if you're a pedestrian what do you do?
[40:37] Unidentified speaker (likely DOT/Engineering Consultant): Same thing you can do otherwise.
[40:41] Andrew Walton: So I think some more thoughts should go into that because there definitely could be some improvements there. I just don't think that this large of a project is warranted for saving a small amount of time during the day and it doesn't improve other forms of transportation like walking biking right now after we did the walking audit we did a biking audit down to Randall's and we were able to use the breakdown lane we're gonna get really pushed off the road we're gonna have to use the full travel lane which is even more dangerous than it is today and that and that doesn't make much sense to me and i keep going over in my mind that i keep hearing from people I talk with, counselors I've talked with that we don't want to become North Windham. Aren't we heading that way with this? Like they're, and they're, they're experiencing more traffic, more problems. They're trying to redo all their stuff because they've gone down this exact thing. They've widened things out. They've got major problems and they're now trying to redo it all over again so those were my thoughts are there any questions for me
[42:26] Unidentified speaker (likely DOT/Engineering Consultant): i just want to speak on the right away a little bit so right now the current plan that they're trying to use lgb is within the mdot right away which is 66 feet the road in the maximum is 61 one feet with no sloping correct no real ditching so that's why some of the impacts are the town by ordinance has 132 foot right away we've reached out to our legal counsel i don't remember the date i think ryan was included in this but back in the early 2000s never voted to enact the 132 foot ordinance there's some legalities that the planning departments looked at possibly that you still have five years, meaning this council could vote to take some of that 132 foot ordinance, 132 foot right away, sorry, and make the ordinance compliant. The only place that the ordinance is compliant is when the council voted to enact it back in, I want to say it was like 1999, if I remember right, was the boat launch in that area down there. because they wanted the added width of northeast extension to do the parking when the boat launch was put in down there at that time they voted not to do that not to expand that area up here but it is still in the ordinance and according to legal there is still time i think up to five years left to act on that but that would be something that the council could look at if they wanted to do that but obviously that's no effect property owners along that because there's already effects at 66 feet type of deal yeah and I think the one other thing I'll just add to that point is just for people's understanding this right here this line that goes through this building is the 132 foot right away so even if you're not can you point to that line again I Sorry, it's this line. That's my conference room. Okay. This one here. Sorry about that. That's okay. That's why we encourage less. We'll say 128, John, not 132. 128, yeah, sorry. But no, so there aren't many structures that are actually within there except for the significantly older ones like that corner building. I wouldn't encourage to do anything to your conference room. But it does have significant impacts to driveways and parking lots down the corridor. So there are areas that you know in recent years have developed with the understanding that right-of-way exists But there are others that were developed from like 99 till probably the last five years didn't take that into account So they end up you know you end up you have the trickle-down effect you take an extra 10 feet of right-of-way You make this made it so they have no parking for the business Or they don't have a place where they can park a car and be off the road So there are if you go to that full 132, it's a definite
[45:21] Andrew Walton: an impact. Is the sidewalk on the Oak Hill connector side, is that impacted by widening?
[45:35] Unidentified speaker (likely DOT/Engineering Consultant): And what I can, I'll speak to the sidewalks now, I was going to after you were finished, but the sidewalk here is on 25, this connects up to Oak Hill Road, so we are proposing a sidewalk in that location. You mentioned that we didn't have sidewalks down to George Shack, the intent is to have sidewalks that go through these project limits and most likely i would assume at that point we would extend them what that gives us for capability is it gets the possibility for either students or students preferably with parents just because it's safer to be able to walk through this intersection safely through the crosswalks and then extend and continue down route 35 there are plans with some of the other residential developments that are occurring in those areas to try to further connect these sidewalks so we are trying to connect the school to the residential neighborhoods is the existing sidewalk on the oh okay extension
[46:25] Andrew Walton: affected by winding it would be maintained how do you widen the road and not affect the sidewalk
[46:35] Unidentified speaker (likely DOT/Engineering Consultant): you would reconstruct the sidewalk oh so we'd be winding the road maintaining the sidewalk so
[46:41] Andrew Walton: So did the town pay for that sidewalk?
[46:47] Unidentified speaker (likely DOT/Engineering Consultant): Prior to my time, but I would assume so.
[46:49] Chair: It was grant money.
[46:52] Councilor: So something else to be thoughtful of, John and I were having this conversation today, and Ryan, clarify, the cost to build a sidewalk is enormous. And then you guys need to think about a sidewalk plow is 300,000, and who's gonna maintain it? So was it $100 a foot?
[47:09] Unidentified speaker (likely DOT/Engineering Consultant): 75 to $100 a foot for sidewalk.
[47:11] Councilor: Yeah, so they're very, expensive. we're talking about eight million dollars to save the same minutes also the school is on a closure list to be redone so before we go too far that school may not even be there i hope it's a community center or town center but that 's on the list it's going to be at least i didn't want
[47:29] Unidentified speaker (likely DOT/Engineering Consultant): to go on to the sustainability study but we definitely envision it so that sidewalk
[47:34] Andrew Walton: with that plan would have to be torn up and then replaced further back correct so you're talking about that's double the cost because we did because we got a grant for it and then and then you have to put it back like it's not
[47:58] Unidentified speaker (likely DOT/Engineering Consultant): uncommon for roads that need to be upgraded to freedom facilities especially it seems like a week it seems like a waste so I'm all done with my question. I will just say that if there wasn't a feasibility study like this done prior, had it been done prior, then you probably wouldn't have considered putting the sidewalk with a wider esplanade. That when you do it, you wouldn't have to redo it. But unfortunately, that's not the situation we're in. That's a before John and before Ryan, probably before Tasha, decision that was made. And I also just wanted to clarify on the centerway two left center continuous center two-way planes there is a pretty distinct difference between what's going on in windham and what's going on here and that's about two times the traffic volume so 302 in windham is well over capacity that's why they're looking at alternative routes and they're planning on putting an island down the middle of the whole roadway so it's always great we can shrink the road up and don't do it but that means you're prohibiting left turns along your entire corridor and your business zone definitely be in here the next time we have a conversation very challenging endeavor so there is a pretty distinct difference and that's about roughly twice the volume in the summer months and to talk about the costs currently the survey any of this stuff is where we go is being all paid by impact money by the development and growth within the town there hasn't been cost to the taxpayers yet besides you know just our staff time to that with that you know we're hoping there's a 25-quarter taxi that's based on residential trips and impact in commercial trips and commercial trips we're talking about that you know we're trying to generate growth so we actually had a staff conversation today about impact fees so recently it was started last month the public works if you notice there was a reduced cost for commercial we have a future business part going in there so we're trying to see is that some or I guess we're looking for a general conversation would that be something the council would like to see to try to for less business because right now it's $2,900 $2,905 I believe per trip that's impacted to the route 25 corridor would the council like to see like the public works or reduce fee for commercial business to try to generate more business because we have something that's coming up is a rusty lantern is looking at putting in a convenience store at the intersection route 30 1 13 and 25 they're talking about the impact fees on a commercial business because they affect the corridor they also have a road impact fee with that and everything else is that where does a line for the commercials start you know like they also have to pay the road pay the 25 corridor would have to pay the public works would you like to see a reduced fee because they're trying to say it's getting too much for a business it's not individually based for one house type of deal and one other thing i just like to add a lot for you to process because but i just another thing to consider is that looking at impact fees for the residential you know the intent with the route 25 corridor was it was really a primary trip so there's three types of trips you can have you can have a primary trip which is going to go from their home to hannaford and back so that somebody's going there is primary you can have what's called a pass by trip so that's the person who's driving home from work and says i'm going to do the grocery shopping on the way home that's a pass by trip we also have what we call the verted trips which would be an example of hannah made that example if you chose to go to hannaford instead of the plumbers market over in buxton that would be inverted trip so that means that they would have normally gone there now it's been diverted the impact fees often for commercial properties are only assessed on primary trips for businesses that have a high like shopping centers high turnover commercial that helps reduce their fees pretty significantly because a lot of those people are passed by your diverted trips residential is pretty much exclusively primary trips because you're leaving your house to go somewhere and you're coming back to your house whereas like i'll use a dunkin donuts for example since there's one in the corridor those are like 80 to 90 percent pass-by trips so the majority of the people that are going there are going there because it's convenient they're going by it you also have competing diverted trips in the same area because of the roman joes we won't get into that makes even more complicated discussion and it's why i don't like doing traffic engineering but that would be one way that we could look at doing it is assessing it on the primaries to begin with we may still want to look at for certain types of uses still reducing it because like a medical office building those are all primary trips because of that they also have a much lower number of trips so a small medical office building would have a lower fee and most likely like a chain restaurant or something if it were to go in that area our goal is to bring business into town we have a proposed business part coming up and just future stuff like that you know we're just trying to think of this is something that the council will be interested in looking. I'm not saying we need a decision or anything right away. It's just something that the council would like to hear more about. And I think the intent from the beginning, I told you I like to try to find my clients' money so none of it comes out of their tax base. With the impact fee, that's supposed to cover approximately half the total cost of the construction because the thought was since the road's already at capacity, the municipality has a responsibility for the other half. Another caveat to that is we're also hoping to get your half funded through the state. So essentially, if you could get an 80-20 and that even 20% share would be paid by the impact fees. Not the taxpayer. Yeah. And if we even get the MPI money for that, on that $750,000, that would be 100% matched by the impact fee and not the taxpayers. So we've come into this with the intent of trying to find alternative funding sources, because this is not just a standard problem. It's a state problem. It's a DOT problem. so we're trying to make sure that we minimize any tax revenue that would have to be equalized.
[54:24] Chair: Thank you. Any other public comment?
[54:32] Anthony Folsom: Anthony Folsom, Spanish Maine. You brought up the magic word, buddy.
[54:40] Unidentified speaker (likely DOT/Engineering Consultant): I've actually never been to one.
[54:42] Anthony Folsom: Huh? You didn't have a...
[54:43] Unidentified speaker (likely DOT/Engineering Consultant): I've actually never been to one because I make my own coffee.
[54:44] Anthony Folsom: For one thing for sure, it's not funny. Especially when you work out of that property.
[54:49] Chair: Mr. Folsom, one second. Can you put up the slide where the expansion is in front of Aroma Joe's? Yes ma'am. That one right there. Thank you. Go ahead.
[55:02] Anthony Folsom: So how are you going to handle a situation like I had this weekend? Truck pulls in with a 20-foot trailer on the back, now parking lot. Parks there, sits there until he can merge his out. He was there over 15 minutes with two other cars waiting for him to merge out. is 25 always going to be the drive-through for aroma joe's or our parking lot now originally the bypass was put in because they didn't want people coming out of the oak hill road because it was too close to the traffic light now everybody cuts through our parking lot but that's okay when anybody wants to come out of here out of the hardware store they come down go around my cones and cut through my parking lot and we have customers that are older people that walk out of there and everybody goes well it's not a well thing when you have to deal with it day in and day out and especially when you work out of there have a business trying to run a business and it seems like people don't give that consideration in this town so that's my point
[56:14] Chair: any other i guess
[56:24] Public commenter: my question i 'm not understanding it completely from the diagrams which is probably just my lack of having looked at them long enough but how much are the current businesses going to be affected by this widening that 's not real clear to me because I can see that I can see there's there are places we're grading and whatnot has to take place you know what's what's this going to do to the Standish House of Pizza? What's this going to do to Tony's parking lot? What's this going to do to the house that is sitting just past this? I mean, this development, this is all from Oak Hill extension back, correct? This doesn't extend beyond the Oak Hill extension. But those folks are already sitting on the precipice and I feel I feel badly every time I drive by some of those houses because there's such nice houses but they are literally sitting on the road and so I'm wondering how that how that transition is gonna play out plus what it I can't really tell from this what exactly it's taking from all of the what 11 how many businesses are affected by 51
[57:57] Unidentified speaker (likely DOT/Engineering Consultant): properties not all of those even structures on them okay but not just in this little stretch the entire corridor all the way to Randall Road and what you see highlighted in green so in these areas in these areas that's what we're showing for the impacts now there are ways that we can further reduce those impacts potentially, either, you know, curve behind the sidewalk, John will kill me though, because the sidewalk plow will end up on its side at some point during the storm. So $300,000 on its side is even worse. But there are other methods we can use for that. This is really just meant to be a gross impacts analysis, so we're looking at what the impacts could be.
[58:37] Public commenter: This is the one time I think I may be grateful that I live where I live, even though the traffic is.
[58:43] Unidentified speaker (likely DOT/Engineering Consultant): I guess just as an example, this area through here, which is the area in front of where Napa is so you can see on the far side most of that area or all of that area doesn't have any development on it currently that's one of our areas where we're doing or having impacts though
[58:59] Public commenter: okay and is all that green area because of where the center line is because it doesn't seem that there's equal we tried to do it to minimize
[59:10] Unidentified speaker (likely DOT/Engineering Consultant): nice impacts to existing structures and existing. Is the Merit House there? That's the Merit House. That's the corner of the barn on the Merit House. I will say, I mean, during the last workshop with us, I mean, we talked about the bypass, but the cost is. Oh, I know. I know. And currently, that new
[59:38] Public commenter: new subdivision or housing development that's going across from across from Apple Lane off of 35 doesn't come into Colonial Market doesn't allow access or egress through the colonial back of Colonial Marketplace is that correct okay and we were talking a little bit
[1:00:04] Unidentified speaker (likely DOT/Engineering Consultant): about the sidewalks like because it's not on route 25 not on route 25. this is a way the town could invest and work with these property owners to contribute to make cyber sidewalks through the woods to get to this colonial because it's more of a direct route where this development's going to be you know what i'm saying to develop this pathway or something through that or a combination of i mean the woodlands subdivision yeah that you're talking to and it ultimately gets filled out and when the business park or one of the business parks gets built out all of those will be close to connecting or connecting so the question is you know will people be able to walk more safely in the neighborhood and then can we do trail connections paved pathways something beyond colonial so at least there's a safe place for bicycles and pedestrians to go that's parallel
[1:00:49] Public commenter: to route 25. okay and i'm just going to throw one more thing out here from my years of commuting i lived long enough to see the gorham bypass come to fruition but it took so long that what they ended up doing was splitting land that families had tried to preserve. And so that left kind of a bad taste. As I recall, when we did the vote to not accept these range roads, it was because of exactly that type of scenario. What often happens when you have side streets is that they become cut-throughs and you want to establish a neighborhood where people will feel safe. Over the years, I've seen a half a dozen different neighborhoods shut off from through traffic because of the volume and so that was that was one part of that
[1:02:09] Unidentified speaker (likely DOT/Engineering Consultant): decision as I recall I will also state looking at the possibility of trying to connect the woodlands the city fiasco material projects to the back end of colonial there are a lot of wetlands and a lot of other impacts there's streams in that area so the ability to create a path even a paved path in that area is a lot simpler process than trying to put a full roadway through there just because that's so that's why we're thinking that even if we can't make the vehicular connection we can at least make a safe walking bicycle connection that would help bring the people who are going from the community center or whatever the george jack school becomes back to their neighborhoods and then they have the opportunity to walk into the kind of more commercial area without stepping off the sidewalk or out of a residential neighborhood
[1:02:57] Public commenter: okay i think that answers thank you any
[1:03:03] Chair: other public comment vicki
[1:03:10] Public commenter: higgins blake wrote i was just curious how the new road that's being built to go out to the business park and affects this because it's not direct well is it directly across from Apple excuse me Rose Apple so you know as far as traffic light so currently we did
[1:03:43] Unidentified speaker (likely DOT/Engineering Consultant): because we don't know what businesses are going in there so we don't know the trip count will be looked at by MDOT again? I guess it will, because Rose Lane, we did that, it didn't trigger a light for that. So until you know what businesses are gonna be in there to generate the trips, that tells us whether or not a traffic light is warranted or not.
[1:04:05] Public commenter: Okay, because you already have a traffic light there for Hannafin, and then you have these, I mean, it's like, what? what I don't know how many feet right afterwards but still I don't understand how that's gonna play into it and I know you've done the cards where you get the
[1:04:26] Unidentified speaker (likely DOT/Engineering Consultant): lights to communicate yeah so that way they work together versus right now our technology doesn't work right and again the developer of that parcel is they start developing the lots it's gonna have to go to do team it will be like any project a trigger if it comes to a point where a traffic signal needs to be considered it would be considered right now the business with their business park isn't been approved yet officially so we can't it's just a private road being built currently right subdivision itself for the business that then they would have to look at the traffic and tax okay and so the next
[1:05:03] Public commenter: question is with the woodlands project how many cars are expected coming out
[1:05:09] Unidentified speaker (likely DOT/Engineering Consultant): of there I think the majority I would think very few because most people are going to opt instead of going there and trying to make a right-hand turn I think most of them are going to use the signal system once it's fixed and working properly yeah because that would be a safer alternative but if they are heading right into Gorham then it would just be right-hand turn but I would think there would be very few people that would be using it to then make a left-hand turn I think all of the people that would either be going left or through would then be using basically take a right off of out of the woodlands at 35 and then take that up to so there's 56 units so in built in that they do it right now because it's under the mdot standard right now they scaled it back from the original plan the original plan showed 150 units because of the perming process they didn't want to wait for it to all go through so once they go back to planning board to get the other units or phases approved that's when the mdo study will have to be done again because it's not a trigger of that traffic study yeah and so far they paid i believe in the impact fee for what's been approved correct okay because as you all know
[1:06:24] Public commenter: the traffic on bonnie eagle road is you know coming up or going down is atrocious as it is this already. And to add, you know, even more. [Andrew Walton: Yeah, I mean,] cars go flying,, flying. I don't live on that part. But I do occasionally drive that way. And, cars just fly 50 miles an hour, at least. But in any case, just the continued increase in traffic. I mean, so on the 25, on the 35 side, from the corner down to 114, that traffic light there, I was elated. It has made such a difference. And I was, you know, wondering how that was going to end. That's a perfect example of why we need to have that a traffic light technology in the center of at the corner at the very minimum at the very minimum and but with all the additional traffic with additional building I just wonder again is it going to be enough? And I guess you just have to take one thing at a time and do your best at what we can do.
[1:08:04] Unidentified speaker (likely DOT/Engineering Consultant): And one thing I'll just say is, I redo a lot of work for municipalities all over the state. I recently was people said, well, let's just put a moratorium on housing projects and then we don't stay the same. Yeah, I said, Standish has like 800 housing units approved already. So it's graphics going to change whether it happens in your town or not so this is trying to position you for that scenario i mean you know lymington points further west are not going to have as much development as standish does but again it's just that continued kind of trickle effect
[1:08:42] Public commenter: regardless of if your estate's flat well just see what's coming across from windham
[1:08:48] Unidentified speaker (likely DOT/Engineering Consultant): to standish windham has even many more units approved exactly. Work for them as well. Yeah. Thank you. And I'll thank my team for your thanks on the room 114.
[1:09:02] Chair: Any other public comment? I'm going to close the public comment. Any council comment?
[1:09:14] Councilor: Go ahead. Is phasing available for this project? Like if we start with the traffic lights, because we need the new technology, if that
[1:09:24] Unidentified speaker (likely DOT/Engineering Consultant): reduces stuff by like 50 is there a need to widen the roads so we can go back to the answer is you can face it the previous comment about lost sunk costs if you do the work now you're gonna have to read you some of it later one of the books direction why didn't anyone tell me so one of the things i'll say is that you know if you just do the signal improvements it will it will make it better but it's not going to completely solve the problem again i have too many slides so we can do the scenario that's in the middle here which is the short-term solution the signals themselves are a significant portion of that 3.7 million dollar construction cost for this quarter though both of them are probably with everything included including the interconnection everything else is probably a million dollars about 3.7 million dollars because new technology is not cheap and it gains you some time. What I would point out is that you still have some D's, you still have E's. The overall ceiling, the length of time you get out of it will be much less and there will be some sunk costs associated with facing it. So things like traffic control. So a contractor has to get out there to widen the road, there's going to be significant traffic control. If you then do two different projects you're paying for that traffic control twice. So for things like mobilization of the contractor, traffic control, environmental controls, it's usually about a 40% of the total cost of the construction for a project like this on a major corridor. So of that billion ish million and a half dollars, you lost half a million of that, plus or minus 400,000. It's lost costs that you aren't going to be reused.
[1:11:12] Councilor: You mean if you decide to move on to a second phase? Correct. Okay. All right. All right. can I continue to go. Okay. Other than Wyndham, because we all have driven through Wyndham at some point, what other peer towns in Maine's peer towns to Standish have been studied? And can we see any of the numbers on that? Where they're they're set up similar to what we're doing?
[1:11:38] Unidentified speaker (likely DOT/Engineering Consultant): I'd say Raymond has a section I'm just speaking off the cuff from what I've seen Raymond has a section like that.
[1:11:44] Councilor: And do we have can we get information on before and after
[1:11:46] Unidentified speaker (likely DOT/Engineering Consultant): the improvement we'd have to find the right examples and the challenge will be finding the ones that have the same traffic volumes every community is different and i don't just say that because that's how i describe my clients and my client base is that every town i go to is different whether it's staff or whatever we treat everybody differently because we know that they all like to be treated a certain way finding an example i mean 302 is obviously an extreme example, but trying to find one that exactly mirrors what you've got for traffic volumes is going to be challenging.
[1:12:20] Councilor: You won't be able to exactly mirror it the same way, nothing we do here is going to be a perfect fix. There's no such thing as perfection.
[1:12:27] Unidentified speaker (likely DOT/Engineering Consultant): Gray's stuff is all conceptual and they're not, a lot of that's been stalled, so they're doing the pillar transformation project in gray. That's not making five-lane sections, that's making three-lane sections. I mean, it's something we can look into, but it's going to be hard to find pre- and post-analyses of both. Okay.
[1:12:51] Councilor: And I know we've done the delay study, the delay, the timing, you had mentioned crashes and crashing. I've not seen a crash report on any of these intersections. Is there any way that we could see that? Absolutely. Excellent. So I would be very interested in seeing that.
[1:13:10] Unidentified speaker (likely DOT/Engineering Consultant): What I will say, and it's surprising, is that there are no high crash locations along this corridor.
[1:13:17] Councilor: That's why I wanted to see the data.
[1:13:18] Unidentified speaker (likely DOT/Engineering Consultant): High crash locations are defined as eight or more accidents in what they call a critical rate factor greater than one. What a critical rate factor is, the DOT basically compares, they'll take the intersection of 25 and 35 and compare it to all the other similar signalized intersections in the state. So the ones that perform better are under one, the ones that perform worse are over one. one of the things with 25 and 35 is a bottleneck traffic it's what's keeping it from being a high crash location in some regards but it's also I mean the number of accidents in ten years at the intersection if you count all the rear end collisions moving backwards and forwards you're averaging somewhere
[1:13:55] Councilor: around 20 plus a year okay yeah and that's why I'd like to see the data I mean in the in the description it sounded a lot worse it sounded like people are crashing every day which i know is not the case so it would i'd be interested in seeing the actual crash numbers granted you know two crashes is too many but i would be interested and then the short-term project on its own that was just the lights you said it's the
[1:14:26] Unidentified speaker (likely DOT/Engineering Consultant): sorry to keep going back and forth so it's the lights plus the striping and all that striping and some turning lane configuration so there would be some widening associated not significant there would be some widening to allow
[1:14:38] Councilor: for like longer left turn lanes okay widening is not in here in the short
[1:14:43] Public commenter: term improvement it's I
[1:14:47] Councilor: see restriping upgrade the signal change it's not
[1:14:52] Unidentified speaker (likely DOT/Engineering Consultant): listed it's extend the westbound left turn lane would require widening add the westbound right turn lane would require widening I assume you're looking at the PowerPoint presentation I am okay yep so some of those items would require widening to make them happen the only one that wouldn't would be one that stays that's just re-striping of the two legs because that's kind of easy money to look for those first okay all right so may I keep going let me just ask one thing you mentioned the extending the westbound left turn lane and that is on 25 correct so what we're talking about is in front of the Merritt house and those businesses we would have to expand the road there to be able to do the right hand and left hand turn correct we wouldn't be expanding it to the point where we have that extra through lane we would be expanding it to the point where the left turners that are trying to turn down 35 aren't blocking the traffic which does happen it's times now okay thank you keep going isn't that within
[1:16:00] Chair: the rights that the town doesn't have at the moment
[1:16:04] Councilor: that would be going up onto my lawn
[1:16:07] Unidentified speaker (likely DOT/Engineering Consultant): oh no that would be that would be within the 66 feet okay we haven't fine-tuned that alternative yet we started with the full builds when we switched from the previous study to this because we wanted to see what the total okay if we decide that we want to phase the project then we obviously could do a revised presentation a revised slide deck that shows what the impacts would be go
[1:16:31] Councilor: ahead to counselors jeremy the short term where we're set up right now what would be the soonest that could get started well
[1:16:45] Unidentified speaker (likely DOT/Engineering Consultant): i guess it's the magic question of money because right now you don't have enough money to do it would take quite a while to collect that and impact these so which again i'd be able to try to get money from the state but all indications I mean the last time I asked the state for money which was two weeks ago they said don't even ask me until July and if the money is not available until July it means the designs won't happen until most likely starting in 27 so you're probably looking at 27 end of 27 or early 28 construction sequence if you're looking to have someone help you fund it if you want to self-fund it I think we could have it probably ready for start construction in 27. I'm not sure if they would have enough time to complete it. Okay. We have roughly, well, with after paying the bills for this and the survey, roughly probably about a hundred thousand. And obviously, out of that hundred thousand becomes the design fees and the parking fees to do that short-term solution.
[1:17:50] Councilor: Yeah, that was going to be another question of mine, the all-in cost because I don't see designs permits utilities in here so what we have here for cost is not actually accurate
[1:18:02] Unidentified speaker (likely DOT/Engineering Consultant): it's accurate for what it's representing which is the construction cost so this is just for construction it doesn't include any of the preliminary stuff it doesn't include the soft
[1:18:11] Councilor: cost for design okay what roughly would those soft costs be that's a rough one to ballpark
[1:18:16] Unidentified speaker (likely DOT/Engineering Consultant): it's usually somewhere in the neighborhood of 10 to 15 percent of the construction costs this is ballpark so $800,000 10 to 50% of well if you're doing the 28 20 years from now yes if you're doing now you're because that's what the cost is
[1:18:36] Councilor: 20 years right now would be 350 correct okay the hydrant relocations you mentioned that we can there's a possibility of having the state help us
[1:18:49] Unidentified speaker (likely DOT/Engineering Consultant): with those because some of them the portland water districts so it's in the existing as i understand it i don't have the plans for it yet because we've only had preliminary conversations is that it's an older water main that comes through this section again it's on the back side of the hydrant so it's it's on the opposite side of the roadway so i'm not the opposite side of the roadway but you have the hydrant and then the hydrants behind are the mates behind the hydrant so if you're have to bring the hydrant you need to be outside a you to go yeah or redrill you know yeah if it's but with it being aged infrastructure if it's something that if we can get the timing to work out it might be good because we can start looking at trying to get additional funding which again the earliest we'll see anything for that is 27. but cautiously because it needs to vote and then portland water district usually it takes three to five years before they can get the capital fund set aside okay so if we start having those conversations now and we could time it side bonus to that is that they would be paying for a portion of the roadway reconstruction because they would have to pay their share of the roadway work that's above their pipe it would be paying for their share of the traffic control their share of the mobilization so there's a lot of added benefit for both the portland water district and the town would
[1:20:06] Councilor: both see a savings by merging the projects is that something that would be in your purview or would that be a different a department head taking care of that for portland counselors on the portland water district okay so it would be a mini okay we are happy to help with those
[1:20:26] Unidentified speaker (likely DOT/Engineering Consultant): conversations and whenever those come along we typically end up doing designs for the portland water district because we're on their approved list but yeah the ultimate which will have to come from the town the contact for portland water district his name is joe parent sorry he's just asked me to keep them updated what's going on you have a network i like that i can appreciate that joe and adam who's joe's boss call me every quarter to see what i have going on in communities in the communities i work for that could impact them so we're in constant conversations with them even unofficially that's the reason you know adam reached out to me about this one that's why
[1:21:04] Councilor: i know that it's an old name and i know they don't have it budgeted currently okay all right is remediation of hazardous materials is that included in the soft cost or is
[1:21:14] Unidentified speaker (likely DOT/Engineering Consultant): that in addition to? It's not included in the cost because they're unknown at this time. Out in this area I would doubt we would find anything unless the existing water main is asbestos which I don't believe it is, I believe it's old cast iron based on its age. So mostly likely what you would be looking at would be potential for petroleum within the gravel bases that would require remediation but unfortunately with those you don't typically know until you start digging if they
[1:21:42] Councilor: exist or not okay all right and then the right-of-way impact valuations down at the bottom there 100,000 per acre of impact and then 5,000 per lot impacted so that's 5,000 times 31 right well that's the minimum is the
[1:22:01] Unidentified speaker (likely DOT/Engineering Consultant): 5,000 times 31. Those were listed for assumptions sake so that people understood what we used for assumptions. So any lot, and I'm not going to try scrolling, I'm going to make people seasick. The ones with the little tiny green dots, those are $5,000. That one that I showed across from Napa where you've got a huge stretch of land and you're taking that green strip the whole way,
[1:22:23] Councilor: that's where that $100,000 would be. Right. So the minimum for those 31 lots is going to be
[1:22:29] Unidentified speaker (likely DOT/Engineering Consultant): 155,000? That's 5,000 times 31. They're counted. It's 31 total impacted lots. Some of those are the bigger lots that have it. So we have an acre of impacts total that don't include those little tiny pieces. So you're looking at probably $250,000 total for both the big ones and the
[1:22:48] Councilor: small ones. Okay. So that on top of the 100,000 above. Okay. Thank you for that. And the, can you explain, I didn't notice, I didn't notice this on the back page.
[1:23:04] Unidentified speaker (likely DOT/Engineering Consultant): That was, that was put in there, that's why I said when I released that version that it was a draft.
[1:23:12] Councilor: Okay, and I shared that was a draft.
[1:23:14] Unidentified speaker (likely DOT/Engineering Consultant): Yeah, so the reason that was there was because I wasn't, it was like 8 o'clock last night when I sent it to you. couldn't remember what the current valuation was for the town so I couldn't remember which of the percentage buckets you fell into I thought it was the 50-50 but I included it just for the benefit of town staff that they would be able to
[1:23:32] Councilor: say we fall into this one okay all right so the local the LAP the 80-20 cost share that's 20% on Standish correct but in this case it would be impact fee impact fee and for that one is there any eligibility or timeline or
[1:23:50] Unidentified speaker (likely DOT/Engineering Consultant): requirements that have to be met yes so essentially you would have to apply for the program typically it ends up in this case it would be going through PACS so GPCOG they would be the ones administering the program it's typically three years to get started five years to finish there are a lot of caveats to that because how long it might take to get designs approved, permitting, and so forth. Usually money can get extended as well, provided there's no opposition to the membership of PACS. But typically five years is your window.
[1:24:24] Councilor: Okay. And there's no cap on that?
[1:24:28] Unidentified speaker (likely DOT/Engineering Consultant): It depends on who you ask at DOT. Okay. So typically it's two to four million dollars is the range they go for. the reason I say it depends on who you ask is when there's legacy problems that is on a major DOT corridor is that sometimes they're willing to bump up the numbers if they know that it's fixing a problem that's also their problem so I would hope we could get to that four million dollar number if we were to pull the trigger on you know doing the full build in the shorter term I don't I don't think we would get up to eight million but again that's 20 years from now so DOT is eight million it may be eight million by then but right now it's typically They try to shoot for projects, they're in the $1 to $2 million range, but I think that because of the nature of the corridor, that we can probably get them up to $4 million. Okay.
[1:25:14] Councilor: Then clarification question, looking at the $8.5 million price line, if they cover 80%, but they're capped at 2 to 4, that is not 80%.
[1:25:27] Unidentified speaker (likely DOT/Engineering Consultant): I'm not making that up. That number will be changed from 20 years out because- If we're looking at building it five years from now, your number is going to be like five million dollars instead of eight million dollars right so but the dot cap would probably be changed 20 years out because you're not including inflation for that okay and the ultimate goal and the reason we want the 80 is that means that even if it only funds say 60 of the total project that hopefully the impact fees would still cover to remaining balance and still put the town within that 50 split that was established in the ordinance okay so just to be clear like impact fee can be paid for debt services no matter where we go with this project it will have to be sent out to the voters even though that but the impact fee say we don't have enough money but we can generate the loan payment month yearly back to the loan from the impact fee can be used for that we're allowed to like I said to pay debt services with the impact fee so it's not necessarily do I like to spend cash before we have it no I don't yep but I'm just saying that if we see a consistent roll of money coming in every year from this that can be used to make the debt service payment to pay for
[1:26:40] Councilor: the project and that makes sense I'm I'm concerned about the capping like the MPI the one that was up there was 50-50 but there's a seven hundred and fifty thousand dollar cap for main dot even if we're looking at the 3.8 mil 750 is so
[1:26:59] Unidentified speaker (likely DOT/Engineering Consultant): when we did this intersection like we did an MPI down here and it was six hundred thousand that we got back roughly from the state for that project
[1:27:06] Councilor: yeah I'm just saying the numbers don't they don't match for me the thing where
[1:27:13] Unidentified speaker (likely DOT/Engineering Consultant): they have their hands on it depends on their product I mean they set the gaps
[1:27:16] Councilor: out to small right but yeah I understand that but then the 80 20 50 isn't really accurate and if people are looking at this online that's not going to be accurate I think she's saying 50 our prop we're not paying 750 and they're paying 750 and that's our total project yeah I'm saying they're capping at 750 which is not 50% of 3.8 million. Correct. So it should be or not. Yeah. Okay. That was my clarification. We're up to. Yeah. Up to would be up to 70%. That would be. I'm going to make that
[1:28:01] Unidentified speaker (likely DOT/Engineering Consultant): change right now. Oh actually this is on Zach's computer. That's Tasha's. Someone will send it back to me. I shall.
[1:28:09] Councilor: Oh, I had one more question, sorry. The ADA, the crosswalks, when we put the crosswalks in at those intersections, if those lanes are widened, is the extended time it takes for people who need to cross those walks going to be taken into account
[1:28:29] Unidentified speaker (likely DOT/Engineering Consultant): for the delays of people still having to wait in traffic? Yeah, so traffic signals or pedestrian signals are designed to have three it's for the distance across the roadway for every it's three and a half feet per second is these walking speed and then you still have that flashing yellow time period so we look at countdown heads yeah it all it all is based on what the reality is that intersection same with the length of time and most people probably don't know for we're traffic engineers like me but your length of yellow and red and all signals is different every single one of them and people don't realize that but it has to do with the geometry of the intersection so they're adjustable though yes they are adjustable yeah but the ada is three and a half feet per second plus typically four seconds or seven seconds any other council comments i got some one of my questions the first one is how does this fit in with the comprehensive plan so i've i've heard a lot of talk about that recently so does this fit into matching the character of Standish, that 's something that's listed in the Comprehensive Plan many times? Does this match with what is in the Comprehensive Plan?
[1:29:46] Councilor: Your son took my copy today, but we were talking about it, yes, it did, and I'd have to relate back to it. But we were talking about having quality roads and safe roads was part of, was actually part of it today okay you have it at your kitchen table actually probably
[1:30:06] Unidentified speaker (likely DOT/Engineering Consultant): sitting up in the car right now so merging you know my experience with traffic when I was first looking at this is anytime you have two lanes that merge into one that's usually a problem that's usually a bottleneck so what we're talking about I believe is one lane of traffic and I'm thinking coming in from on 25 from Gorham we split it into two lanes we can go through there go through the two lights and then we're merging back into one and so what happens when we merge back to one is that just going to cause backups all the way through and I would sit and understand and think a lot about this and I think that comes to through traffic how much the trip the cars are going through in each place is somebody coming in and turning in to go to Hannaford or are they coming up and they're turning on to 35 versus going straight through I saw you had numbers and I've not seen those numbers or been able to ingest them my question is how much traffic, from the numbers, how much traffic is coming into Standish from Gorham and then also leaving by Standish House of Pizza on 25? Are those numbers about the same? Is it about the same amount that's coming in? I would have to check those numbers. I don't know off the top of my head. What I will say is the reason that you need this project isn't necessarily just the throughput volume of traffic. It's the turning traffic. Right. So what happens when you get past Sanchez to Pizza, what happens when you get past Randall Orchards is you no longer have the prevalence of high volume driveways. So it won't create that bottleneck because there's no conflict between them until they go down, go into a single family house. So one residential driveway is not going to create a backup. So as you move down through, you know, the next eight generators are like in the other direction or like tractor supply area and those places. so they don't you don't have that conflicting movement that's going to cause those backups and that's that's the reason to go to five lanes is that if a car is now turning right into the bank or the merit house it is it may be blocking that one lane of traffic for a little bit but you still have another lane that's able to continue to go through so it's just and it's also because as you're coming down through the corridor this is why i'd have to look at the numbers, there is obviously, or there is, I should say, a reduction in volume of the people that are coming down 25 from Gorham, but then output down by Cape Road. And the reason for that is the 25-35 intersection, because you're getting a lot of people that are turning off in that direction, you're getting a lot of people that use Oak Hill extension, so there's a lot of places where traffic does bleed off. So, you know, at some point in the future, if development continues to proceed towards Gorham would this five-lane section need to be expanded or would that section require a three-lane saccharogen I guess I'll say maybe because it depends on what type of development is so based on what we have available for knowledge now this is where we're at because of what it takes to get traffic through this corridor that's not to say that it's not going to end up needing to be expanded towards Gorham at some point it doesn't mean this may not have to be expanded further it would be less likely that you have to expand it towards like flemington or towards i'll just say two lights just because of the fact that you're not going to i'm sorry two trails because you're not going to get as many developments there that are going to be those high volume generators [Anthony Folsom: okay so] what was the so this seems really big to me this seems like an overkill for me so i've been trying to think about what ways can we scale it back that still allow traffic to go through still help a lot of the situations i am i'm worried about the amount of development that is happening within standish in the next five years and how is that going to change traffic patterns so if we put this in and we do this now you know okay what is going to be the traffic that's coming in from the from whatever's being built and i don't know what people are calling it the industrial parker or whatever how is that going to affect things that can significantly change the roadways the amount of traffic coming in and out and so there's a lot of things in there that concern me so i'm trying to think of is there a way that we can or so to my question if we change the light at 25 and 35 to be a smart light to change the way the striping is and affect that intersection can we do that and not touch the light at hannaford and so and the reason i ask that is i've driven through there many times when it's backed up all the way to Randalls or Orchards Road and what I see is that it's just all the cars backed up and the Hannaford light doesn't really matter in the sense of that's not the thing that is stopping traffic that is not the thing that is keeping people from moving through because you get another 15 feet and then you're waiting on that traffic light so my question is and it sounds like I saw you shake your head that you have to do both lights at the same time why because if you don't have that interconnection fee the fact that the and the newer technology is it's going to be the bottleneck right now it's not because the other bottleneck is backing into it but based on the traffic volumes and based on the technology that's available in that cabinet you are going to start to see cues at that location will they be as severe as they are now probably not because you're not getting a double over effect but you're still going to have some pretty safe cues there i think if you would look up into hanaford you know see traffic waiting to come hold on the 25 not all the traffic is able to clear that intersection so that if there is a backup there with that as well but that if the light at 25 and 35 is better then all of that traffic should be able to come out of hanford make that left-hand turn and so you don't you we wouldn't have that backup anymore. No. I don't think so. Because you'll stop right at the intersection. I've seen it happen. We have to wait to get out of Hannaford to make a left-hand turn because traffic rates fail. Right. But I'm saying if we improve the light at 25 and 35, theoretically, that traffic is going better. So that left-hand turn isn't stopped there anymore. It does go back to my previous comment about sunk costs though, you're going to spend an extra 50%, 40 to 50% to put in that first signal and then you're going to repay that for traffic control and everything else when you put in the second one and you're not going to see as big an improvement as you're hoping to see. So if we did the second light at Hannaford later, we would not be able to tie them in? No, you'd be able to tie them in, but you're going to have to pay for traffic control all over again. You're going to have to pay for the contractor to mobilize out, signal contractors usually between 15% and 20% on mobilization. So there's some costs in doing it. And extra construction costs at the time of putting in the second phase, the second light. Second phase would be the second light, not widening the road. Okay, and then to answer your previous question is, we did consider the option of what would a three-lane section look like? And it wouldn't help long enough to make it worthwhile because if you're gonna take the effort to go in and widen the road out put carbon put drainage in do all of that work and then have to come back before that 20-year window and then widen it again then your slim costs are astronomical at that point yeah what i'm thinking of is no widening of the road this is just re-striping up at 25 and 35 you mentioned a small widening in certain areas you know not this is what i'm understanding from what you were saying so if i'm wrong about this correct me there's not huge in construction costs associated with that it's minor spots that we would write widen the road for improved turn lanes and again i just want to get back to our subtotal deal for construction costs not including inflation not included right away i'll even add in or not even add in the contingency for this dialogue because it'll be easier that 3.8 million dollars is for all the widening in both signals if you do one signal by itself as a standalone project you're probably looking at somewhere between 500 and 750 000 and that doesn't include any additional restriping widening any of the things that would be necessary to make that work five years from now you could decide to the other one that one's going to cost you half a million to 750 000 so now you spend spent 40% to 50% of your total cost to do the entire project on those two items, now when you go to build the roadway and widen it, you're not going to save that amount. You're going to probably end up paying in the $3.8 million range. You might get down to $3.2 million. So you've saved yourself $600,000 by spending $1.5 million. So there is some pretty significant sunk costs in trying to stage work like that, especially on corridors with high traffic volume traffic control will be one of the most expensive items on us well this is this is where I think the plan as is probably not the plan that we would want in 20 years or even 10 years because of the changes that are happening in Standish I think they are significant and I don't know that this is the plan that we would want to go with just like on 302 where they're talking about what they have today he's not working and they need to change that and it's not working because of the high number of drivers fully agree I fully agree so I'm trying to think of things that can be done that would help today help within the next five maybe to ten years and then we see what the changes have come through and decide what is the best project because five lanes honestly that middle turn lane I'm from California so I have grown up with very large roads turn lanes doing all that's you know this it's called the suicide lane for a reason I'm not a big fan of it I understand the use of it I understand why we would have it but that's a huge thing five lanes is huge for this area and I it just seems like this is an overkill so I'm trying to think of ways that we can do this that fit within the town fit within the budget and but also help the traffic and i think there are ways of doing that i guess i will just say that as we move forward over the course of the next 20 years the traffic volumes aren't going to be going down that's true nowhere well i guess probably some places but yeah it's always going to increase it's too big but i just want to point out the traffic times will only increase i guess the one last thing i want to say is that i've heard mentioned a few times is impact fees that is taxpayer money that are they are being paid by people who are building and living in the town so when we talk about impact fees that is taxpayer money it is not the tax base of the people that are currently here but it is the people that are living here and coming here so I just want to I think point that out distinction I just want to make those that without having a plan like the town has to collect impact fees no developments gonna happen those are already at capacity so what's gonna happen experience this is what started this conversation if they were told the signal at 25 and 35 was already at capacity I couldn't add any additional traffic to it so that means it would stop development no one would get a traffic movement permanent line that corridor what would With no impact fees or no changes? No changes. Yes. So I'm absolutely for changes. The impact fees are funding it because otherwise the alternative would be that the Woodlands would have to foot the half a million, $750,000 upgrade. Or 63 Osprey Trail would have to pay to upgrade Colonial Drive. So I understand what you're saying that impact fees are future taxpayers, but it's so that they don't have to pay the full share of what that project would be if they had to fund it. and I work with a lot of developers most of them prefer impact fees to having to pay for their own improvements it's easier to budget I
[1:43:30] Chair: have a question has there been any consideration in all of this of changing the traffic coming off of Oak Hill over to Caylee Drive once if and once that's accepted by the town and keeping kind of turning off Oak Hill extension to prevent that bottleneck
[1:43:51] Unidentified speaker (likely DOT/Engineering Consultant): that's happening by the standard shelves of pizza we didn't look at any bypass alternatives especially on residential streets they get people's attention when you try to redirect that much volume down a residential street it wasn't designed to answer okay thank you the street wouldn't be designed to handle it's well designed but i guess the other issue or concern i guess i would have is that the people who are purchasing property there now and they're buying into this neighborhood when you start directing 2 000 cars down a road that right now will probably have 50 or 100 oh yeah they're probably going to be calling you but if the town has accepted it as a public way true i mean i always use the example that people complain when people cut through and they're cutting through because google or waves or whatever map app you use is telling you to go that way so some people will do that i think it would be best to try to discourage people from using residential street for that use because it's being built for the standard for residential street and not for a collector thank
[1:45:10] Councilor: you counselor streaming what percentage growth for traffic have you been using for these plans because i'm also of the adage that there's a lot going on right now in the next five years or so and to project it out to like the 2040
[1:45:30] Unidentified speaker (likely DOT/Engineering Consultant): or 2046 what percentage growth are you using so i guess two there's two answers to that question the first is that the developments that we were aware of already are including these traffic volumes okay so we didn't do those through inflation following that and i have to double check with our traffic group i believe we're using half a percent per year because that's what the I saw the nose. That's what we're being told by the state auditor to use. And that number has been pretty consistent. And keep in mind, these are over 20 years. These are half percent averages. So it might be 5% year one, but we've already accounted for
[1:46:09] Councilor: it. Half a percent annually?
[1:46:11] Unidentified speaker (likely DOT/Engineering Consultant): I believe. I'd have to double check that, but I believe it was half a percent annually. And that was based on blocking on her name. It's the one who does the housing report every year at the state house. Regardless, those are the numbers for this area that they recommended. is that for traffic or is that for resident that's for increasing traffic
[1:46:35] Councilor: traffic thank you that's why the nose I didn't know if it was resident or
[1:46:39] Unidentified speaker (likely DOT/Engineering Consultant): traffic yep okay
[1:46:43] Chair: thank you other council questions I'm just gonna open up the public floor for just a moment if anybody has any discrete questions based on what the council just discussed If you want to come forward.
[1:47:03] Anthony Folsom: Anthony Folsom, standard president. When was the, did you get the results on how many cows have been on the road impact now as far as the limit on what 25 can handle? How long has that been in effect? When did the traffic impact go into effect? No, I don't mean traffic impact. I mean, you're saying the volume is at max right now on the road. Correct. When was that? it's been there for a while so we're still doing projects on 25 adding and when we really shouldn't be is that what you're saying indirectly but dot is still ultimately if there is no solution going
[1:47:39] Unidentified speaker (likely DOT/Engineering Consultant): to grant we're trying to find a solution so that doesn't happen so that the improvements won't
[1:47:44] Anthony Folsom: get made but we already are at that max and it's been that way for a while correct okay and i understand. I mean, when Izzy brought up the bypass that we was looking at quite a few years ago, 20 years ago, whatever, why we stopped it, I do not know. We should have done it when it was cheaper. And I understand prices go up every day. I know we need improvement, but if we keep putting this off, we're going to get further in the hole. So I think people have to come together and make this the easiest thing we can. We're leaving traffic, but not impacting the people that live here already as much as it's just my thought because i think if we would have done the bypass many years ago we would be way ahead of this game and we'd have more better neighborhood and all this and i don't understand why standish is getting all the building when you say like well lemon is not going to build cornish isn't really going to build baldwin isn't going to really build but you're putting that all on us?
[1:48:45] Unidentified speaker (likely DOT/Engineering Consultant): It's geography. So Standish is one of the outer
[1:48:49] Anthony Folsom: limit communities that is a high volume bedroom community for workers. Okay. Do you live in the city? Do you live here? I lived here for 15 years. Yes but now you probably moved out when it started to get too busy for you. It was really busy then. Okay. I moved because I switched jobs and moved further north to get closer to my job. But it's just if so do you drive these roads now to see okay all right all right thank you thank you to
[1:49:24] Public commenter: piggyback on what Ben has been saying about quicker fixes or coordinating the lights because that to me is a big part of the problem because never more than six cars get out of Hannaford at the left-hand turn onto 25. And I understand how a big total project might make more changes all around, but I think just coordinating some of the traffic lights and just fixing the lanes as they are now, from what they are now, so that advanced left turns at the major intersections would be from all four directions with the signal lights. and I don't know that I truly understand all the how everything has to happen to make that what seemed what seems like a simple fix I understand that it's much more complex in the in what has to what has to occur I adore Sabega Lake Village, since it's been changed. And that has made a lot of lives a lot easier. And even when you're in a line coming from Windom, it's not nearly what it used to be. And I know that was a long process. But yeah, coordinating things I think would go a long way in alleviating you know alleviating the problem in smaller in smaller ways
[1:51:41] Unidentified speaker (likely DOT/Engineering Consultant): anyway thank you so my question is to you is as a council do you want to see a comparison between I guess this slideshow another slideshow seeing that with the actual cost divided out what it does that could occur in short term or long-term. Correct. We can do that. I have to cat out the short-term version. Is that something that
[1:52:06] Councilor: I would like to see them be interested in that? Yeah. Along with the crash data.
[1:52:12] Unidentified speaker (likely DOT/Engineering Consultant): I mean, I'm assuming, I guess part of it would be how much, how much is that going to cost? Is that going to cost us a few thousand dollars to see that? Or is that going to cost us $25,000 to see that? So we've, the other things that we've talked about is timeline line a little bit with this I don't foresee this making this budget cycle begin on a June ballot I don't foresee the early so that I see that getting on the June ballot for that would be the following year for that speaking correctly especially if you're looking at training so some of the other things that we're what I'm what we're talking about which I think this should be discuss is like my building type of deal I think this is a higher priority for the town than my building but there's no way the two things can go together because it will never pass I think that this is a better thing better thing moving forward type of deal do I need a building absolutely I do but the town needs help with this for these intersections that benefits more townspeople with that type of deal so the reality the reality is what I'm just thrown out there is the impact fee for the building will hopefully get past next month and start collecting that using that as a savings account for that but it's probably four i guess it's four years out before the some a building would be seen for public works because of this i think this is a higher priority and i hope you guys feel the same way i just don't think that we can get everything done with the feasibility study for the town and get it for this budget cycle for the for a building and there's no way that we can put it all onto one send it to the people even though impact fee is paying for it they still see the whole numbers type of deal for that and it's just my thoughts on it would also give you more time to try to secure outside funding to cover your share so maybe three years from now the answer is yes we can start looking at public horse garage because between the impact fee and the money that we've been able to secure from the state it's not coming out of your tax base or your current so then definitely a golden opportunity to start moving ahead with other and the more development that occurs the more john's gonna do that one scares me so
[1:54:36] Andrew Walton: the reason why i'm up here is exactly what john was saying expectations on how long this stuff takes like this is not happening tomorrow the whole main dot stuff, totally up in the air. The commissioner just announced his retirement today. The transportation bill at the federal level hasn't passed. I talk to the main DOT quite often myself and I've been told my trail project is the biggest one to happen in the next three years. There's no more money, there's no more trail unless there is another influx of money so if we can do something small just to the 25 and 35 intersection I think that would make a lot of sense to me otherwise you're talking 3, 4, 5 years possibly at the earliest to break ground and that's if the voters vote for it which i mean that's a that's a tough thing so this is the long game not the not the short one so to clarify if we did if
[1:56:01] Unidentified speaker (likely DOT/Engineering Consultant): we looked at the phase one or i don't the shorter plan the smaller plan and did that is that something we could get to the voters in this June? I don't know the answer to that. The question is do I have money to pay for it to get it to the
[1:56:23] Councilor: voters in June because we need like an actual. But then we have no funding from
[1:56:27] Unidentified speaker (likely DOT/Engineering Consultant): outside sources and we are less likely. We don't know we don't know that we would have the outside funding secured by MDOT by that time. And DOT would unfortunately be less likely to contribute to a partial effects [Chair: typically] it fixed the problem for 10 to 20 years I would be interested to hear from residents of this town what they would like is the five lanes is that what people want or are they willing to pay more over time to do this in have smaller fixes in our contract with them we have a public forum meeting sketch we to be determined based on this conversation of what we were what some happen or type of deal of this general conversation so that's already in the works I guess is what I'm trying to say is that there's a public forum already built into our contract for the public to have that input besides this I can
[1:57:38] Councilor: say to the pulse i get is i'm the person that receives square tree calls and the intersection we fixed i received the most amount of calls like swearing so mad angry and this i would say is a close second of i'm so frustrated with getting through your town especially if we have a parade if we have anything else going on like so i do know like that's sort of a significant like
[1:58:03] Unidentified speaker (likely DOT/Engineering Consultant): cause of receive for calls if you've been and we've done a great job on that intersection but if you just done the signal and then four years later came in and bite the road oh no i'm sure
[1:58:13] Councilor: it would have been horrible but like i get no calls now on this intersection now it's just on this so like i think that it's a it's a good reminder of when people are angry they call
[1:58:26] Unidentified speaker (likely DOT/Engineering Consultant): and you'll get more calls during construction and hopefully once it's up and operational and
[1:58:31] Councilor: with that yeah of course of course who's holding the stop and go when i had to wait or go Oh, yeah, of course.
[1:58:37] Unidentified speaker (likely DOT/Engineering Consultant): To get a cost for the small plan, what is that going to cost the town to do that? I mean, I know we've paid money to have the full plan done, or at least to this point. What would we be looking for an additional cost to get that same thing for phase one or whatever you want to call it? Because if it's a bunch of money, then look, you know, maybe we just go with this plan, let the voters decide if they want it or not. That's why I'm wondering if it's just a few thousand dollars, then I would be interested to see that. It's going to be more than a few thousand dollars. I don't know exactly what the challenge will be. We are going to have to rerun. We have to take a couple of steps back, not just one. We're going to have to redo the traffic analysis and capacity work that we did for both intersections combined and the corridor to just include the signal work at 25 and 35. so just stepping back to do just the plan is one thing but stepping back to make sure that it will still work is another are you looking you're talking about doing the other light as well i'm not talking about doing the other light also you're talking about the full short term let's
[1:59:48] Chair: take a quick straw fold i'll start first just kind of what our wish list is so if we can see if we have a consensus. My wish list would be 25-35 intersection, the Hannaford intersection, and I would like to see sidewalks connecting Hannaford to Georgie Jack.
[2:00:08] Unidentified speaker (likely DOT/Engineering Consultant): Want to start with you, Ben? That is fine with me. I'd just like to see it extended a little
[2:00:15] Public commenter: bit further down to where the Butterfly Card and Gift Shop is, because I do think that but where Aroma Joe's comes into play, it's a mess there. Every more, I can't believe we don't have more accidents that we've had. So I think it needs to extend further down.
[2:00:30] Unidentified speaker (likely DOT/Engineering Consultant): What extends further down?
[2:00:31] Public commenter: Any changes we can, maybe further, if we correct this, is that gonna alleviate the problems down in the Aroma Joe's? No.
[2:00:41] Chair: Yeah. Anything, I think, correct me if I'm wrong, anything that we do down by Aroma Joe's is gonna make it worse.
[2:00:49] Unidentified speaker (likely DOT/Engineering Consultant): It's not going to make it worse, but it's, unless you do the full build, it's going to be challenging to make it a significant improvement.
[2:00:54] Chair: Well, because your green area is cutting off where they queue cars right now. So it's going to make it worse.
[2:01:01] Unidentified speaker (likely DOT/Engineering Consultant): So they're going to queue in that one lane. There will still be a full lane that could continue, but they're going to queue in that one lane.
[2:01:10] Public commenter: Is it going to make it worse if we don't, I mean, if we correct this and leave that?
[2:01:15] Unidentified speaker (likely DOT/Engineering Consultant): So what I will say.
[2:01:16] Councilor: which one is a roman joe's the long one or the short one right where the green is okay in the
[2:01:22] Unidentified speaker (likely DOT/Engineering Consultant): green okay yeah the reason i said we'd have to re-look at the analysis is i have to make sure i have to confirm that in the short term we weren't planning on doing any of this work because that does add some of the cost i don't think intent in the short term i still have it in front of me was to go to the two through lanes so we wouldn't need this second through lane that merges out so you wouldn't have to do the work in that area it's just going to be less impactful only comment on the sidewalk so you cannot just finish the poll right I'm going to go with the
[2:01:56] Councilor: bill and I've done right now I would tend toward the short-term plan because of the future growth and that business part coming in that 's where I would go I just my understanding would
[2:02:12] Unidentified speaker (likely DOT/Engineering Consultant): would be the lights would be redone. We would change the striping on the roadways for 35. So you're talking about a dedicated left turn lane where we don't have that today. And that's gonna help the traffic there. And that's about it. That there's not a lot of widening of the road. If there's something small to do to add something for a turn lane, but not any significant groundbreaking stuff in either direction. In front of her conference. Yeah, we would absolutely want to widen that and take out the conference room. I guess that's what I'm looking at or thinking about because you, I mean, we talk about the short-term migration right there. Those numbers, those grades are not necessarily great, but there's only one yellow spot. And that is coming through 35. And that one turn. Other than that, you know, we do have a D, we have a D right now. You know, I think that improves a lot of that traffic without doing significant stuff. But I'm not a traffic person. I'm not. This is not my job to do this or analyze this. But yeah, I guess that's where I would think about that short-term migration. And the one caveat I'll just add is that the length of time or the amount of traffic it takes to go from a D to an E to an M is pretty small. Once you get to a certain threshold, those delays really start adding up quickly. So even though it is saying it's a D to A, that's not to say that it won't be in three years with just the development that's currently and that's and that's part of my concern is that because there is so much change going on that we don't know what is going to happen where how many of how many of those people are going to be turning left out of this and going right left or right and so what is that going to influence and how is that going to change things and is so yeah it would definitely be better it would be improved traffic for the large build I think that's a little bit too I guess my one question is for Ryan about sidewalks or that's something which I think a good idea I'm just trying to say is it's our way to build them so we're not doing twice when we get to this stage of doing it I guess that's well we're not showing them now so you have to take right away now as part of it the other downside is that the numbers we quoted you for cost for sidewalks assume you already have curb most of that section already or does not currently have curb so when you go to add the curb you know curb is about 40 to 50 dollars on your foot on its own storm drainage so the catch basin the pipes that are not necessary because of the curb is somewhere in 150 to 200 a linear foot so your 75 to 100 sidewalk ad where we already were showing closed drainage is now an ad of about $500 a foot so doing the sidewalk from Hannaford to George Jack it's going to be very expensive it's just a long distance and I don't want to be known as doing it twice I guess it's where I'm saying by that so you already got that tonight
[2:05:43] Councilor: so the 3.5 million figure that's up there is that for the long-term total
[2:05:48] Unidentified speaker (likely DOT/Engineering Consultant): package I say build it today but the market is not great at the moment because of the So, but that's for if we were to do it all today rather than wait 20 years. And it's actually and it's kind of the way it's set up. It's actually 4.5 million because the contingency is on the bottom. Plus, that doesn't include the right-of-way either. So you'd have to add all total all of those together. We're just trying to break it out so that it's clear where it was coming from. So essentially, with this slide, you'd be taking the $3.7 million off the total numbers that you're looking at somewhere in the $4.5 million range to do the whole thing. right of way including as we further the design the contingency number goes down so that usually helps offset your soft costs but it's still going to be there
[2:06:34] Andrew Walton: okay what
[2:06:42] Chair: would the council like to do as far as what would you like him to
[2:06:50] Unidentified speaker (likely DOT/Engineering Consultant): design oh or would you like me to bring back to you as a presentation for comparison sake because maybe the stepping back to what was said before we started the struggle
[2:07:02] Chair: we're kind of split the
[2:07:10] Councilor: short term did not include any sidewalks and
[2:07:16] Unidentified speaker (likely DOT/Engineering Consultant): in my mind the short term is a band-aid right the short term is to get the roads up to a point where they meet standards today I think we bite the bullet and go the whole project so if you have a 200 unit subdivision come in that could be enough to trigger when
[2:07:39] Councilor: is the when on your agenda is the public
[2:07:42] Unidentified speaker (likely DOT/Engineering Consultant): forum scheduled for have one scheduled job we don't have it 's just in our contract to do it for that because we're waiting on the feedback from here of what direction we're headed because we want to show the people what we think the direction is we're
[2:07:58] Councilor: headed gotcha ryan for your statistics you did use our current numbers of our building lots like what we have what's currently slated for construction those wood loads i'm sorry for
[2:08:11] Unidentified speaker (likely DOT/Engineering Consultant): for, oh, for the women in the base traffic numbers, it was the ones that were approved at the time that we did the analysis, which was almost a year ago now.
[2:08:21] Councilor: Okay, so we do have a sort of a number.
[2:08:24] Unidentified speaker (likely DOT/Engineering Consultant): There are a few more that have been added, but not a significant number have been added.
[2:08:30] Chair: We've had seven people join us this evening and listen to us. Just by a raise of hands, I don't mean to put you all on the spot, but if you'd like to respond, on. I'd like to just know from those who've been listening to this for almost two hours, what your preferences so the choices are, we do the short term fix what we're just talking about to fixing the two traffic lights. And then the long term fix is just where we do the whole shebang. So first for the short term fix for and then for the long term fix.
[2:09:04] Unidentified speaker (likely DOT/Engineering Consultant): As long as it includes crosswalks and sidewalks.
[2:09:09] Chair: okay and two with side crosswalks and sidewalks in case anybody didn't hear that they're not going to do that then it's no sense thank you for humoring me so would we like to have another workshop would we like to have a community meeting you know we zach and i just
[2:09:37] Councilor: just you guys Council approved software system program we have that we can send it out to the residents. And so I think I can I'll before something I'll send that to you. I think we're allowed three a year. And we can design a question and get it to even if people don't have, you know, social media, like there's a way we can get it out. I'll, I'll get you guys the facts about that. And that might be the easiest way to reach residents with the best number of and the fastest. Yeah.
[2:10:13] Chair: All right, I'm gonna close the public comments. Any closing council comments?
[2:10:17] Unidentified speaker (likely DOT/Engineering Consultant): I don't think I can do a five lane. I don't I don't I think that's too big for this area. I could see four lanes. I think five is too wide. Now, does that mean that you should go back and we do all this work for four lanes, that is not something that I'm going to push for. But as a resident of this town, I don't know that I could vote for five lanes. That's just my opinion.
[2:10:48] Chair: And I would agree with you. I don't think five lanes is appropriate through here.
[2:10:53] Unidentified speaker (likely DOT/Engineering Consultant): What was that, I didn't hear you.
[2:10:55] Chair: I agree with Ben. I don't think five lanes is what Standish needs any other closing comments all right anyone else have any agenda items on our agenda items do I have a motion to adjourn all in favor we're talking