York Select Board Reviews Capital Requests for Fire Department Equipment and Facilities

2026-10-29 · 2h 11m · Source: Capital Planning 10-29-2026 (Town of York (YouTube))
Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[0:00] Speaker A (unidentified): Budget Johnson select board and in the audience we have members of York Village Fire Department and we've got our emergency management director and they'll be coming up later on in the meeting so okay so for York Beach Fire Department lead off with chief Welch here I've got copies of his items I'll hand them around so there's two capital items to discuss for the next two years and here we go Jeff I've handed out generator first you want to lead with that the discussion on that and Nicole's good. Well we might call in Nicole I think or we'll just speak for her and she can yell if we're getting it wrong. [0:41] Jeff Welch: So okay thank you again Jeff Welch fire chief in York Beach the item I'm discussing is the generator that powers the facility of the York Beach fire station when we experience power outages. Our current generator is 20 years old. We have an annual maintenance plan on it and the company that does the annual maintenance on it has been keeping up with it fairly well but it's in not great condition due to the salt air and conditions that it lives in out in back of the fire station. It's an essential piece of equipment because it powers all of our radio communications, obviously all the lights and electricity, refrigerators in the building, living quarters, and it also powers the room that we use at times as an emergency shelter during belts of extreme heat, cold, or storms. There are some possibilities. Nicole reached out and said that she may be able to get some grant funding for this, but it wouldn't be until the fall so there is a possibility that if it makes it through the capital process that we still could get a grant to pay for it sometime in the in the fall time frame other than that it's pretty cut and dry in addition you know to the generator itself needing to be replaced they're recommending some electrical component upgrades inside the building to meet current codes some stuff has. Changed in the last 20 years on the way that they're set up and so forth so some upgrades to meet current codes as well as make it more user friendly and more efficient for the building correct yes so I think the generator portion itself was around the forty five to fifty thousand dollar mark depending on what exact model they used and then the rest was making the upgrades the electrical components and some of that is the generator that's there is a little bit on the smaller side for the. Building so in order to accommodate the bigger generator it needs a different. [3:06] Speaker C (unidentified): panel and so forth welcome how do you measure use of a generator is it by [3:11] Jeff Welch: hours is it by years generally they're measured by hours once you get into a certain size class there's not an hour meter on the particular one we have the generator runs every week on a test run and then it can run from anywhere to zero to a couple hundred hours a year depending on the you know the outages so [3:32] Speaker C (unidentified): will this next version have a the ability to actually look at the number [3:36] Jeff Welch: of hours that it's been in use I don't know if this particular model that they have spec'd has an hour meter but I believe if it doesn't and it could be added there's [3:47] Speaker A (unidentified): kind of two components with generators so ours is the one if you're in heavy duty if it's new and you get 20 000 hours on it you might need to replace it the next year even if it's you know good but age also some of the components so housing and fuel assembly all [4:01] Jeff Welch: that kind of stuff play into the right you know so the biggest issue we're facing with ours is like not only is the housing around it rusting away as you would expect it to in that conditions but like a lot of the motor mounts and so forth are starting to rust and give way on it so a lot the internal components are getting pretty tender on it and [4:21] Speaker A (unidentified): does make sense for rehab versus a replacement just i mean everything's fixable but at some point you start paying more to fix something then it's worth if you guys looked at that in terms of correct so yeah what their [4:33] Jeff Welch: thought was on it was the components the motor itself on the generator is so tender that it's kind of putting good money after bad to continue to put money into it what kind of got us you know focused on it was we had some issues with it the last couple of years as far as it not starting on its weekly test runs and so forth so we started to put the needed improvements into it to get us by for a couple more years [5:00] Speaker A (unidentified): Nicole do you want to go out on a limb here and talk about the likelihood of grant funding for it and whether we should be pushing this off to future year like yep just press it there you go here laughs [5:13] Speaker D (unidentified): Yeah, so since we use this as our emergency shelter, it qualifies for a lot of various different grants. They're all through FEMA. It's not the same as the ones we use for a storm. So those generally open up in May. You do your application usually within about three weeks is roughly how often they're open for. And then they usually submit the awards and tell who's been awarded in September for fund release in October for the start of the federal fiscal year. Year. So grants are, or generators are actually one of the easier ones on these. They're pretty cut and dry in terms of what you have for expenses and everything, and it's an easy one to always tie to one of the categories of what qualifies for the grants because it is our emergency shelter. So there are obviously competitive grants always because they're nationwide, and it can vary depending on who's applying, how many people are applying, but generators are generally one of [6:17] Speaker A (unidentified): the more favorite options, so likely to be funded in full, or yay or nay. Okay, so that, I mean, we probably want to think through which year. I know you've talked about it, but you discussed 28. It probably should focus on replacement in FY28, but do we want to budget it? There's kind of two options, and we don't have to decide this tonight, but do we want to budget it fully in 28 and then not spend the money if Nicole is able to procure a grant to replace it? Do we want to wait until 29, plan out, wait until 29 assuming we'll get a grant, and then if we don't, put it in 29, meaning it's a year older, or just go ahead with it? So I think those are, those are kind of your, that's your thought process too, right? Correct. [7:04] Nicole: Thanks, Nicole. Yeah, Wayne, is it a, is this a propane fed, propane? Yep. And are, is the location sufficient right now, or would you want to move [7:17] Jeff Welch: it to a better, no, I believe it would stay in the same location that it's at, based off the [7:21] Nicole: wiring and panel locations and everything. And as an emergency felt shelter, does it generate enough power to heat and cool the parts of the building that would be used for shelter? [7:33] Jeff Welch: Yeah, so it does generate enough power to run the heat, cooling system, and all the lighting and refrigeration for the shelter. Does [7:42] Speaker C (unidentified): it ever make sense to house generators for any sort of, whether that's a shed, roof, or anything like that, just to know? I mean, I realize that the salt air you can't keep out and it needs to breathe, but is there, are there other ways to mitigate the snow load, the, you [8:03] Jeff Welch: Know rain, all that kind of stuff. So currently our generator is located right behind the fire station, between what we call our back garage and our ladder bay. And there's an inset in the building for the living quarters where the building steps in. It's set in that area, and it's protected by a vinyl fence for aesthetics and also to keep, you know, the snow and wind and rain and everything from blowing into it. Needs to be open on the top to breathe, and it also has setbacks on the building and so forth in case of an accidental fire. But it's in a pretty well protected area, other than you just can't really cover the top of [8:38] Nicole: it. Yeah, thanks. And is it high enough so that the worst floods you've had don't [8:45] Jeff Welch: bother it? Is, yeah, it's up on a, on a large concrete pedestal. It's up in the year [8:52] Speaker A (unidentified): lifetime, getting way ahead of the five-year capital planning schedule though. But lifetime on this generator may significantly outlive the building. If they're, you know, I'm talking 20 years in the future, how long is the current one live for? I know you just said 20 years, [9:08] Jeff Welch: so yeah, I would, I would anticipate 20 to 25 years. The only thing that would, that would alter that is if it had an extended amount of run time for some reason, which it shouldn't, so [9:19] Speaker A (unidentified): so in any, like I said, if you, far beyond the current five-year planning schedule, but any relocation of the beach fire, this is mobile, it's essentially movable equipment, but you'd have to reinstall it, so there would be, you know, half of the cost would be sunk back into the building if you moved it, I'm assuming. Me right. [9:42] Nicole: A thought for the committee under the town, usually there's vehicles and other large equipment on your capital plan. This isn't. If you do put this off, then it may come up along with other bigger needs and be more of a change in the budget. And this way, you know, you have to get it, get it now so that you don't, it doesn't have to combine with another very large purchase as it comes up in the future. I [10:17] Speaker F (unidentified): do like option one that you outlined about bringing this forward, and if we get grant funding, then we don't fund it, we don't fund it. Yeah, exactly. It's been an interesting [10:30] Speaker A (unidentified): candidate for like fund balance use or something like that, so that's [10:35] Speaker F (unidentified): a, yeah, separate discussion probably. [10:39] Speaker A (unidentified): Wouldn't want to authorize it for bond use that would, if we think there's a good chance of not spending the money. So okay. Good on this item? Okay. The next item. I'll lead off on side by side here just for 30 seconds. So there was a question, there's still somewhat of an open question about funding opportunities for this that Jeff and I are working on. Jeff's, I asked him to present this as a vehicle, understanding there's an open question about funding and potential for this year. So do you want to talk about the request itself and then we get to the alternate funding, we can have a little discussion about that. Okay so this [11:29] Jeff Welch: request is for a six by six ATV utility type vehicle. Do you have the picture attached to yours? So it's kind of a two-part pieces, the vehicle and then the unit that you see that sits in the back of it. What that unit consists of is a platform to be able to lay a patient on a back border in a stokes basket on that platform and move them from areas such as the beach or remote wooded locations out to where the ambulance is waiting for those patients. It also would double as a fire suppression unit because it would carry a small amount of water and foam to be able to deal with any type of wildland fires that we had in town. The biggest need and reason for putting this in the plan is we're seeing an increased amount of calls on our beaches and in the wooded areas of Mount Agamemnicus, for instance. What we're finding is it's taking a lot of personnel to properly get these patients out of the woods. We're having to put them in stokes baskets and carry them or off the beach put them in a stokes basket at low tide. If you have, you know, a certain demographic, a patient, it could require a lot of manpower to move those patients off the beach. We've had some slip and fall twisted ankle injuries by the personnel in the woods trying to move these patients. We've had some of the volunteer call firefighters bringing their units from home to use at these calls to help us get people out of the woods so you know it's been on our minds for several years, it's been discussed, you know, where the need falls for that. And at first it was a call every couple of years that we were finding we were needing all this extensive manpower and these other resources, and now it's It's becoming a more regular thing. We could be in the woods, you know, there's some years we're up at the Mount Agamedicus doing these rescues three, four, five, six times a year. And, again, you know, the calls on the beach are getting more numerous as time goes on. Heat stroke, people not feeling well, people with a broken ankle or leg or arm playing on the beach. So these vehicles like I said you could buy the multi the multi-use kid units for the back the vehicle itself is around $50,000 it's an all season all year round vehicle and the unit that goes in the back of it depending on exactly how you outfit it is another twenty to twenty five thousand so we [14:20] Speaker A (unidentified): We talked the other day about this committee, or most of this committee saw a request from Parks and Rec, and I know you brought this up, if that was something they were asking for this year, so probably haven't had a follow-up discussion with Pete on that since yesterday afternoon. Right, yeah, I'll see you this afternoon. Awesome. So there is a conversation about, do you want to give your initial thoughts that you told me about how that could be shared? [14:47] Jeff Welch: Yeah, to be fair, I haven't talked about this with Peter yet, and I don't know what his plan or vision is for his vehicle, but there's a possibility, depending on exactly what he wanted to do with his, that we could do it as a joint effort. But again, it largely depends on what his thoughts and vision are doing with it daily. My thoughts are in the summertime, if it was being utilized by the Ocean Rescue Team, getting from point A to point B and moving the management staff of the Ocean Rescue Team around, then it would already be at the incident on the beach when we respond down there, which is a win-win because it saves us a person from having to take it. The only time we would have to take that vehicle back from them is on the off chance that we have some sort of large wildland incident or somebody in the woods that's needing use of that vehicle in the months of July and August. But if we kept it at beach fire, sat there at night, they came and got it in the morning, used it for their for their routine and brought it back in the evening so it was there for the overnight something like that would work but again I just have to talk with him about it so [15:55] Speaker A (unidentified): I know what he mentioned to us was that there would be obviously an on-beach rescue on Long Sands or even Short Sands, maybe if there was a short haul that you had to get somebody off, although it's probably less of an issue with the distance, but that also would be utilized by the lifeguard captain currently. Ella, you know, I'm to move back and forth through the day, so you heard, I don't know if you heard that, but from just from beach to beach, not necessarily like, you know, within the low speed zone. So there might be an option there where like she could pick it up in the morning, utilize it, drop it off, kind of a thing where they maybe even leave her report location, could be your parking lot or something like that, so she doesn't have to worry about where she's putting her car. Right, yeah, again I'm dreaming all this up. Pete would need to talk. [16:43] Jeff Welch: With the, that would be a win-win if that worked out, because again the resource would. [16:48] Speaker A (unidentified): Be at the call when we got there, so that, so the other thing is that they were kind of envisioning a lighter, the smallest possible side by side they could get that would put a litter on the back of it for beach use. Looks like this is slightly bigger, so you might want to talk that through with them. I don't know if a bigger one would be unusable for them. What were they looking to put it on the back of it? It would just be like a litter, like a litter holder for, yeah, so you could clamp a litter in, so. It's basically to move people, so the reason that we have specced the six. [17:18] Jeff Welch: By six version versus four by four is departments throughout New England that we've gotten feedback from that have these other beach communities and communities that use them largely in the woods find that when they buy the four by four and they put the unit in the back of it that they lose a lot of their steering ability in the sand and in the wooded areas, on leaves and pine needles and dirt, because the 4x4 doesn't keep it propped as well to keep some weight on the front tires. So the 6x6 is, again. [17:48] Speaker A (unidentified): So you'd have a loaded vehicle with a patient that would careen out of control as you're driving it? [17:52] Jeff Welch: Right, yeah. You know, they were finding they had problems. They couldn't steer them, so. [17:57] Speaker A (unidentified): Maybe more of an issue in the woods than in the beach, but yeah. [17:59] Jeff Welch: Yeah, so if you were using it just to carry bags of hose and had no unit in the back or no patience, if you're just using it to move some light material. [18:06] Speaker A (unidentified): Four-by-four would be sufficient. Okay, so I ask you guys to get together, it sounds like you're already planning to do that, and see if there is an opportunity to combine it. The other question is grant funding. So we've talked, I know you and I have talked about it, I've talked with select board leadership, not the, not the bulk, I don't think it's been a bulk an open slide board discussion at this point, but about the 40 plus thousand remaining from the ambulance grant, right? But you got me the information from the state, so thank you. I know that the Marla was party for that, but Todd, the select board chair, and I were talking about that, discussion, so we'll look at that. My thought process, just to throw it out here, and you can react to it, everybody can hear, is that so we looked at the grant opportunity, we're initially told that the grant is not applicable to the ambulance study that's being done. I'd like to clarify, like two, it looks like there might be two components. We did a little bit of research on the grant itself, the funding opportunity might be applicable to part of that. So I'd probably have one further follow-up conversation with Maine EMS on that. If that's not the case, then I think that there's a good case that could be used for this equipment. So, and to be clear that it wouldn't fund the full ambulance study, but it could potentially fund a portion of the ambulance study. would be we'll have a conversation with select board after that. If that's not, if it's not applicable at all and that's the main EMS's answer, then I think there's a good case to apply that grant to this, but we'd have to discuss it with the select board, so that may reduce this or even remove it from the capital program, so that's an ongoing discussion that would cover roughly 50 [19:46] Jeff Welch: of the 75,000 needed if that, if the grant funding were to be used for that. The York Beach each non-profit fire corporation would likely be willing to pick up the remaining 25,000 to buy the unit to go into the back of it. Okay. [20:04] Speaker A (unidentified): So further discussion, I'll update maybe at the end of this process where we're at to the group. It's an open question, so. Okay. [20:12] Speaker C (unidentified): How do you move this? [20:13] Jeff Welch: You drive it down the road. They go about 50 to 60 miles an hour. [20:17] Speaker C (unidentified): So to get to Mount A, you would actually drive it on the road? I would go down the road, yeah. Okay, so you don't require a trailer. It doesn't require a trailer. [20:22] Jeff Welch: No, if it needed to go out of town somewhere we could put it on a trailer and take it, but [20:27] Speaker A (unidentified): Is it a this isn't a low-speed vehicle then this would be street legal or would it just be because it's got lights on it? Nobody would harass you. [20:35] Jeff Welch: So, I don't know if they actually consider them. I don't think they consider them low speeds, but I believe I think there's a municipality exemption for them. So not anybody can register one and put it on the street. Yeah, I'm just thinking like captain the [20:48] Speaker C (unidentified): the lifeguard captain is at Harbor, something major happens, is she gonna drive it back to York Beach or does somebody come and pick her up or like? [20:58] Jeff Welch: We would want her to bring that. Got it. Yeah, I think it's, I don't know what she's doing for transportation currently. I don't know if she's using a car or- [21:06] Speaker A (unidentified): Personal POV, yeah. Or parks and rec vehicle, yeah. [21:09] Jeff Welch: You know, we would train her so that she could, you know, say she was at Harbor Beach with it, we could train her so that she could respond on and an emergency response with it and yeah and it would be outfitted like a regular vehicle [21:22] Speaker A (unidentified): with a light a siren and a radio got it and if that was to be used for lifeguard stuff it could also be i mean that would be important because she could utilize it as an emergency response for herself if she needed to get to her or other lifeguards needed to support other another location might open a different opportunity than a yellow light with beach patrol on it right like i said [21:44] Jeff Welch: for the summer months july and august that would be the ideal situation to have lifeguard staff in [21:48] Speaker A (unidentified): that daily i asked i followed up on heather's question because with that because i think parks and rec talked about that being a low speed vehicle when it's registered for just parks and rec use if it's not an emergency vehicle it would be and the one that they were looking at was only [22:03] Nicole: a 30 35 mile an hour 40 mile max yeah hour per hour max yeah i'd have to look at the limitations [22:11] Jeff Welch: It may very well be registered as one, I'm not sure. I know like the small Kubota they have, I think it's registered as a low speed vehicle. I just don't know if this falls into the exact same class. [22:20] Speaker A (unidentified): For bog road, yeah,, yeah. So yeah, so I would have that conversation with Parks and Rec as well, so. [22:27] Speaker G (unidentified): So can you, hi Chief, can you say again how many times now, a year, how often this is happening that you need a vehicle like this to respond? [22:39] Jeff Welch: So I would say, depending on, you know, it depends on what the tide is and so forth on the beach, but say the tide is half low or low, you know, times a year that they would be using that, I would say between the woods and the beaches, anywhere from probably 8 to 15 times a year. [23:03] Speaker G (unidentified): And so and how do you divide that? I mean, is it 50 half wood or is it more on the [23:09] Jeff Welch: beach, woods in the beach? It really depends on the year. You know, we've had some years where manna geminicus is like we're going and then we'll go for a year and it's like, oh, we only had one call up there. I would say the beach is fairly predictable July and August. You know, you're going to have six, eight, ten people we bring off the beach during the summer hand [23:29] Speaker A (unidentified): carries now? Or I know Pete talked about this thing. A lot of them are hand, a lot of them are. [23:32] Jeff Welch: Four people on a litter, six people on a litter. A lot of them are stokes and they're carrying them. The thing is though, you know, say you have a patient fall down by the cutty sack and they're a patient you want to get in the ambulance and get to the hospital sooner than later, you know, it's gonna take six or eight people and they've got them in a stokes and they're carrying them and they're bouncing them and you're going up a set of stairs with them. With this piece of equipment you can set them on the patient carrier, you can drive them down to the ramp at the bath house and get them up onto the street and have the ambulance stage right there to pick them up. [24:02] Speaker A (unidentified): So that would be kind of a, more of a standard response plan? [24:06] Speaker F (unidentified): Correct. So you're not driving them to the hospital in this vehicle? No. You are driving them to a pickup point by the ambulance. Right. Would that be the same with out in the woods, Mount A? [24:17] Jeff Welch: Correct, yep. Yep, we get them out of the woods to where the ambulance is staged and put them in the ambulance where the ambulance is staged. [24:28] Speaker G (unidentified): So thanks for clarifying that. So for the woods rescue you're using someone's vehicle to do that [24:36] Jeff Welch: is that what i read right? So a somewhat recent, what does that look like, what is that vehicle now that you're using? It's a, so the one we had last time, the last time we had one of our members bring one to the woods, his is a, I don't know if it's a four by four or six by six, but it's a similar setup. This is a four-seater with a dump bed on the back. What we're able to do is put that tailgate down on his, but you've got the stokes on there, but it's heavily tied on one end because too much of it's hanging out the back and so forth. [25:15] Speaker G (unidentified): Yeah, it'd be interesting to know whether that's a four-by-four or six-by-six. I mean, this vehicle looks to the untrained eye, like a little bit of overkill. I mean it's a big piece of equipment and I just want, you know, it's 75 000 versus parks was talking about 15 000 for the vehicle they need and maybe they need something more substantial. That's part of your point, right? But I think we ought to sort of have more of a conversation to see the level of a piece of equipment, right? Yeah, and I don't know what [25:45] Jeff Welch: there's included, but again the weight is the biggest factor for the six by six this vehicle to which could be different than theirs. I haven't seen what theirs was specked like. This isn't it's an enclosed cab with heat and so forth and the reason for that is so when they're driving it on the road, whether it be February or in the fall in October November, if they're going from the station to Mount Agamemnicus and they're going 40 50 miles an hour up route 1 and up Mountain [26:11] Speaker A (unidentified): Road, that is substantially different, you know. Yeah, I mean, the parks and rec was like, so it does have a full glass enclosed cab. That was not the case that they were talking about. It was like a windscreen and open, right, you know, kind of like a standard. I think it was because they're using it on the beach. Exactly. Do you get a picture? Yeah, I mean, they're they're they're talking about like a mule, right? Yeah, so that's where a lot of the cost you [26:34] Jeff Welch: would see, I think, if you went to a four by four in the same model that I'm talking about versus six by six, you might be talking three or four five thousand dollars less. A lot of it is in the structural cab and enclosure and so forth. You also said it had some sort of fire equipment on it as well, correct? So in that picture you need to have that, I guess. In that picture what you see is you see it says EMS D, that's a seat for a provider to sit in, so an EMS provider sits in that seat, there's a pole beside the seat for hanging equipment and IV lines and so forth, and then where you see it says Q-TAC, that's a flat platform where you slide the stokes or backboard up onto it and strap the patient right there. And then behind the seat and behind the platform for the stokes, you'll see there's a hose reel and a small pump, and the forward part of that is like a 30-gallon water tank. Yep. [27:31] Speaker F (unidentified): So the patient, so you're inside the nice, cozy, heated cabin, the patient's out in the elements? Right. Okay, I just wanted to clarify the design here. I guess it's not on the beach right now, Mount A in February, but they're riding [27:51] Speaker A (unidentified): But to get to the end, to be clear, they're out in the elements before they get strapped onto this thing, right? Yeah, stay and freeze or come and freeze, right? Yeah, okay, the goal is once [28:00] Jeff Welch: We get this unit to the patient, to have them strapped to it and out of the woods and into [28:05] Speaker A (unidentified): The ambulance in 20-25 minutes when they're in the woods. Introduce Budget Committee member Christine Brown, just, she'd been in the audience a little bit but just came up [28:12] Speaker H (unidentified): To the table. Thanks, Chris, to participate, so thanks very much. I just was [28:17] Speaker I (unidentified): Wondering what other towns are using this tool and it's working for them, so [28:22] Jeff Welch: There is a lot, you know, a lot of Beach communities have them, a lot of Beach communities rely heavily upon them to do the same thing that we're proposing doing with it, and you know there's, I think towns like, I believe the town of Wells has a couple of them, I know a gun quit has some sort of unit they use, I believe for their lifeguards, that's similar, it's a side-by-side type vehicle [28:53] Speaker I (unidentified): You know, the four by four I was asking about, I was going to ask about the price difference, but you said three or four or five thousand dollars less for the [29:02] Jeff Welch: Four by four versus six by six? Yeah, it would be, you know, a few to several thousand less to go [29:09] Speaker A (unidentified): To the four by four in this frame with the kit, with a cab enclosure, yeah, so the big delta is [29:15] Jeff Welch: The equipment, right, you know, the other thing too, in the reason we kind of thought it would be, you know, best suited to double it as a little bit of a fire suppression forestry unit, we don't have a brush, a forestry unit per se in our station. We cover a lot of area where they're, you know, we're finding they're having campfires and so forth up in the Mount Agamemnicus and our section of the watershed section and so forth. So we don't have a pickup per se. A lot of departments will have a pickup with like a slide-in unit in the back of it. We don't do that. We pretty much do everything with Indian water tanks on our back. You fill these tanks with water and put them on like a backpack and walk in the woods with them, so [30:09] Speaker G (unidentified): Would it make any sense to have a smaller, to have two smaller units as opposed to one bigger unit? So what the parks is recommending for the beach, and then maybe we have a smaller unit up on Mount A. Is that where most of your activity is, where people are up there hiking or whatever in the winter? And yeah, I would say had one there, you could drive up, get on it, you'd be cold until you got to the person to take up back, I mean so [30:35] Speaker A (unidentified): You're not driving a mountain road at 60 miles an hour with the lights going, you're driving somewhere from Mount A to a quarter mile, half mile around there by [30:43] Jeff Welch: the road or something, if that's where the activity is. Yeah, the only thing is with that is you, if it had the fire suppression capabilities, it would have to be in a heated space, which we don't have it money as we've heard [30:59] Speaker G (unidentified): extensively. No, we do have a brush truck in town, I mean the village has a brush [31:05] Jeff Welch: truck, correct? You guys still have your pickup, the [31:11] Speaker A (unidentified): answer is no plans to eliminate currently, but it's not a new brush truck, I think is, yeah, the comment [31:19] Jeff Welch: so that's primarily the reason we've never, they've had one for years, so we've never proposed by anyone. [31:28] Speaker C (unidentified): I think a little red flag for me on this is the this kind of reminds me of buying a lake boat for the ocean water and river rescues in that I'm concerned that perhaps the parks and rec vehicle is actually not specced appropriately if what you're hearing is six by six is what is actually needed on the beach and then we end up with a vehicle that is not actually going to do what we need to and it's going to you know throw sand all over the place so i 'm glad that you brought this forth and really we'll be pleased to hear how you and parks and [32:08] Jeff Welch: rec can maybe overlap on that. Yeah, and again it would, I'll be interested to see what Peter has to say about it, because he may have a completely different vision in his mind for what he needs for equipment, and a four by four may very well go fine with what his plan is to put in the back of it, versus just that particular unit we have spec'd for this is,, you know, got some weight to it, because it's the suppression and the patient carrier. So my other question was, you mentioned [32:36] Speaker C (unidentified): that the York Beach Fire Association would be open to helping with some of the funding of this. Would they be open to the funding of it whether we get grant money or not, or is that, is that dependent on grant financing? So at one time the thought was [32:53] Jeff Welch: To spend the EMS grant funds on this unit in the fire department had informally agreed during discussions that if we bought the unit that the $50,000 grant fund would cover the cost of the actual six by six side by side and the department would fund up to $20,000 to $25,000 to finish outfitting it. I would have to go back. That was several months ago. I would have to go back and find out if it doesn't get paid for by the grant, if they're still looking to put a substantial donation towards it. I would have to have that discussion with them as a board that I have to check with. [33:40] Speaker A (unidentified): All right. Thanks, Jeff. Do you want to stick around? But I know we're gonna talk really briefly about some other joint stuff afterwards. So let Dave get up here, thanks. Yep. Okay. Let me just, David has three items here. Let me just make sure I get all of them. [34:06] Speaker J (unidentified): We can go this way. This [34:22] Speaker A (unidentified): one is apparatus replacement, so that's. [34:30] Speaker G (unidentified): Yeah, we,, we,, we, yeah, sorry. We have an open spot here, so we can't go the other way. Sure,. I only took one and this is one [34:57] Jeff Welch: all [35:01] Speaker A (unidentified): Right chief I've handed so I've got three sets of copies here for you. Engine four, turnout gear radios, and building upgrade phase one. So do you wanna lead off with apparatus replacement? They've got that right now, so yep. [35:31] Speaker J (unidentified): So the engine four replacement, I attempted to do this last year and it was turned down, so I'm bringing it back this year. It's our last big piece of apparatus that needs to be replaced, and all our big apparatus will be up to date. This is a 2001 Pierce pumper it has doesn't have a hundred thousand miles and I don't like the last truck be replaced by them it's still it's a speech that's retirement age if you will we use it specifically for either to get call through to a small incident or a blocking unit out on the turnpike but we where you don't have to bring out the million dollar aerial truck or a big tanker. It's used to, if a main pump, which is the new 2026 PS engine we just got, if that goes out for service, goes down for some reason, this truck is, it's back up. [36:42] Speaker A (unidentified): So, yep, sorry, keep going, I've got, I thought you were stopping. [36:46] Speaker J (unidentified): Yeah, so in our last year's question about our, we needed a replacement plan. We did have a replacement. I didn't have it with me at that meeting. The person who asked the question, she had it on her box the next day. It was scheduled to be replaced in 2029. When that says fiscal 29 means that was the year it was supposed to be replaced. means you have to go these trucks take a couple years to get built depending if you can respect or if we get them custom so this we won't don't expect this get this truck down until fiscal probably 30 so again I don't want to run into the problem we had remember dumping money into this truck if you made another year then it's just going to push it out that much further and we're going to have issues repair issues so I'm going for it again this year and see what happens okay so [37:43] Speaker A (unidentified): On the cover sheet for the replacement I just want to note thank you for bringing the price down to 1.4 dollars this is 1.4 not 1.4 it's 1.4 million sorry that was a that was a joke Dave sorry it went over big two people chuckled it was great so can we talk about the just the replacement schedule you put in the back there well and can we talk about what's [38:13] Speaker F (unidentified): been replaced on it because that's good yes just adding on to that and project description 2001 Pierce Pumper you're proposing replacing the 2001 with a new one you're not proposing buying it too I know I just wanted to flush that out for the form [38:32] Speaker A (unidentified): in the audience okay so with the replacement units so ladder one so at the bottom for the replacement plan this was yeah right there right underneath your hand letter one's Jeff's truck right so that one is in the replacement queue right now order we're on order so Chief Welch for those that are watching said it's expected around April for delivery so brush 10 was replaced that is now rescue 2 rescue 2 okay so you guys repurposed it a little bit in terms of for need as a kind of a front line a lighter duty front line truck how's that [39:17] Speaker J (unidentified): going for use so you took kind of like a from the from the beach but the [39:32] Speaker A (unidentified): beach was running with a lighter engine that's primarily for rescue calls so it's mostly medical calls or rescue calls but then you have fire suppression apparatus on it for lighter duty stuff it wouldn't substitute for a full for a full engine but this is like in case that you have a crew of two driving back or one driving we are for medical call you have some fire suppression equipment to put on something if a call comes in correct 99 Freeman Street they would [39:59] Speaker J (unidentified): come back for medical call the truck is equipped with the class a pumper it was able to pump majority of the water on that fire I just need to get the additional equipment there to provide the water to the truck and that's [40:15] Speaker A (unidentified): that's beaches rescue one correct that's the equivalent of the similar type units and both [40:21] Speaker J (unidentified): Those units, so when we say a brush unit, it's, you can go into roads, into that brush area that are maintained by the water district. Yep, all those trucks. But if you get into a place where it's, it's not watered land, and you have a little tote road, you cannot get down those roads with this truck. We did not take our brush truck out of service. This is a pickup truck. You can get that in places, but our plan is not to replace that because we believe... [40:49] Speaker A (unidentified): So essentially what happened is this turned into a Swiss Army knife. The replacement for Brush 10 that became Rescue 2 kind of was a Squad 2 replacement and a brush truck. It's kind of like in the middle ground between all of those, and it's more of a Swiss Army knife for you guys. [41:07] Speaker J (unidentified): It's a mini-pumper rescue, basically. So thank you. I want to give you credit for that. [41:10] Speaker A (unidentified): That was a huge adjustment I think you guys made on the fly, and I think it's going to work out really well for your department. So Ladder One's in queue. Squad Two that's shown on here has been replaced with the truck that we just purchased last year, that we just received this year, right? Correct. Okay. And then Engine Four, FY29 Engine Four, is what we are talking about for you. And for those, the audience and those at the table, the evens are village apparatus and the odds are beach apparatus. And they set that up years ago, I think, to avoid, if it's an odd number, it's coming from the beach. If it's an even number, it's coming from village for dispatch and scene command to know what's what. [41:49] Speaker C (unidentified): So, sorry, you said Squad Two on the FY2027 list? [41:53] Speaker J (unidentified): Meaning it was, when you're looking at that list, that's the year we want to put it in service. So we're asking it for the years of the brush truck. You see what year that was asked for? We didn't get it until this year. [42:08] Speaker C (unidentified): Okay, so you asked for, in 27, you asked for Squad Two. [42:13] Speaker J (unidentified): And we got it in 27, unfortunately. And I'm sorry, what? It was to be replaced in 27. So we asked for it in 25, 26? 25, 26, yeah. I mean, we see that in 27. [42:24] Speaker C (unidentified): I'm really sorry, but I'm having a really hard time following this layout if we could for that when you're presenting to the Budget Committee if you could put this into a table with the with the recommendations I don't really understand I feel like I just heard two different things on the squad to FY 27 you asked for it last year it didn't go on the ballot but then we received it this year and this is this is aged too [42:54] Speaker A (unidentified): So that's why I'm going through it, because this was a 2022 plan that I think you guys had put [42:59] Speaker H (unidentified): together. Maybe we need an update, and I'm trying to tick off dated plan with, yeah, that would be [43:04] Speaker C (unidentified): really great, and with anticipated receipt dates would be great, or actually, yeah, actual receipted received or anticipated received fiscal year, yeah, received. So just for those in the [43:22] Speaker A (unidentified): FY 23, Brush 10 has been replaced. It was not replaced necessarily in 23, but we got it a year ago now. [43:30] Speaker J (unidentified): COVID messed up that schedule, I'm gonna admit to you. [43:34] Speaker A (unidentified): Ladder is in replacement queue. Squad two was replaced in engine four now. We are talking about, that's what the request, I'm just running through the recent replacement items. Sorry, I'm not trying to reference this plan too heavily, but so everyone understands what we thought. [43:48] Speaker G (unidentified): I guess I sort of have to agree with other members. I can't follow all this. So it needs to be a better layout so that, and it would really be helpful if we had something we could see before the meeting so we had a sense of what we're talking about. So I agree with. Does [44:13] Speaker I (unidentified): the engine for FY 29 is that something then you'll put into request for 27 of 28? So the 29 it can be replaced. That's the overall gist, right? He struck the good [44:30] Speaker J (unidentified): NFPA standards for 25 years. [44:37] Speaker G (unidentified): So I guess I'd also say when we talked about this last year it was clear that the numbers are almost flipped from 10 to 20 years ago. We're now, 70% of your calls are medical, and 30% are fire, and that's part of the reason the brush truck became Rescue 2, is that you realize, okay, we have a lot of medical calls, so we need a vehicle that can go and respond to that type of thing. One of the questions I'm going to have is, we have, and I know they're different, and we talked about this last year, but I don't remember exactly the differences, but the two fire departments have six pumpers. Do we need six pumpers in this town? That be one of my questions. I mean, I know this separate fire departments, but it's one town, so it'll be a question I'll have when we have a better. You know, I know the some pumpers do something a little different than others, but it'd be really helpful to understand why we need six when only 30% of our calls we [45:54] Speaker J (unidentified): have two different departments in town. You have to want them is as separate departments, so we make our decisions, we make them by separate departments. [46:01] Speaker G (unidentified): I think that's a problem, I think that's a problem. [46:10] Speaker C (unidentified): All right. Yeah, I just wanted to say, sorry to follow up on Robert. I think many of us have been talking in general about how operations has such a huge impact on capital, and you happen to be the first person where this is really coming up of what is the operational impact of the capital and what is the, are we really in this group only talking about capital or are we also talking about operations and how things are running and they're, they're so intertwined and this process is a little flawed in that it makes it sound like capital lives all on its own when you're clearly explaining that it doesn't live on its own, so I just wanted to give you a reassurance that this is a theme that will be happening for all of the capital requests that are coming in to try and understand, is it working? Is the structure working? Are the operational needs being met? And are they being met for the whole town? So I just wanted to reassure you. [47:15] Speaker J (unidentified): There are many projects that Chief Roch and myself and our officers are working on in combining tasks, working together more, cross-training and so forth. But in the meantime, we just keep moving forward with what we need to do today and again you know we come to these places you know we come to you guys we come with needs not wants i want to purchase through our corporate upstairs mornings [47:44] Speaker A (unidentified): to clarify capital operations driving capital requests in this case not capital driving operations because this wouldn't be a change to this wouldn't change any of their operations but you're talking about does it would it change to the operational structure reduce the need for the [48:01] Speaker C (unidentified): capital spend that's the question what's standing in the way of us having the right equipment for the for the 70% medical calls and is it the structure of the departments and I think that's what we're concerned about so if [48:29] Speaker I (unidentified): there was a greater need for example for the six pumpers and I'm kind of green at this but the two departments would work together and share equipment, share capital, if they needed to, right? And sometimes if there's an overload, other towns would be involved. Is that correct? [48:50] Speaker J (unidentified): Oh, yes, you know, we rely on mutual aid quite a bit, but, you know, again, we've always, you know, it's always been our policy to have a, you know, two pumpers, a tanker, and a ladder. And your pump, your primary pump that goes out of service, you need that secondary pumper to fill in that spot. It's spot, you know, you don't want to take a $2 million ladder truck down the road. And that's one of the reasons, you know, it's hard to get into spots, it's hard to maneuver, and it's just your basic, everyday call. You always need that first pump in a smaller unit it to get in there to make your first attack or whatever thank [49:39] Speaker I (unidentified): you okay [49:44] Speaker A (unidentified): All right, so there's a follow-up information request and follow-up discussion request. Anybody have questions on this item? We've got two other items to talk about in one. Yeah, just why don't we hit the, David, the next one would be gear, right? Yep, so. [50:28] Speaker J (unidentified): So on the gear one, right? Yep. Okay. Yep, purchase. So yep. This is just something I'm throwing out there. And Jeff and I have both talked about this. Firefighter gear costs up to $5,000 a person now to, if you want to fully suit somebody. So, the range can be between $3,000 and $5,000 depending if you get the helmet and all components of it. Sure, we could go out and get 10 sets of gear and have them on the shelf, but the gear nowadays have us the life shelf. They're only good for 10 to 12 years. It has to be replaced when they get worn out or they have to be replaced when they hit their expiration date. We can use the gear for a non interior firefighters so we can take some of the really take some of the gear all the gear if it's in good shape then use that for new people coming on until they take the firefighter one or two and have to go in to their internal structure firefighting. So what we need no really is a fund out there that we get three new people making those are that fun and pull out money for those three new firefighters. We get five, we've got the money available. It's hard to budget in your operations money for that gear because you don't know, being in that type of situation with call force volunteers, we don't know how many volunteers we're gonna have. So this is instead of purchasing the gear and having the shelf not being used, this is a way that we can buy it, purchase it when we need it. It's a reoccurring fund that just, if you don't use it all, it rolls over until the next year. And just keep that fund in a certain balance year after year. Radio's the same thing. Radio's at eight to $10,000, possibly more if it's a mobile unit. That's hard to put it in your budget for your replacement of your portals. [52:34] Speaker A (unidentified): Jeff, do you wanna join this conversation as well as it if it's intended to be? Yeah, joint, you know, so goal would be some type of reserve fund establishment. I mean, as opposed, well, it sounded like from what Dave was saying that Jeff would also be, yeah, we could be a joint account. Okay, well, in the in case it turns into a joint project, why don't you stay there, Jeff, or give feedback? So the idea being this would be a this would be a establishment of if we just add it as a capital item, of course it would stay until it's spent, but we don't like to have stuff floating five years out there, three years out there. The if the true intent is that we would have a fund with a balance in it for purchase, so a certain amount available per year, and if you didn't add to it, we would then make an appropriate, if we didn't spend from it that year, we would leave it as is. If you let's say we've established the amount that it was supposed to be in there in the level, and then you spent 50 000 out of that, and to get it up back up to that level, we put 50 000 back in over the next year or two years. That's the vision. Yes, okay, so [53:50] Speaker K (unidentified): so a reserve fund, not a capital fund. It would be funded with, you know, i don't operating dollars probably, and we could fund it, what this is a question, we could fund it the same way we do our unemployment fund, our earned time fund, and things like that, which is every year we look at the balance, we see what's used, try to try to project what we're going to need as closely as we can for that year, and that's the request the next year. So it ends up in those two cases being a fairly consistent number from year to year that we request, but it does work well. Yeah, just so but the [54:31] Speaker A (unidentified): the initial discussion could be a capital request for the for the first [54:35] Speaker H (unidentified): fiscal year, depending on the amount, it couldn't be bonded, correct? Yeah, yes, how [54:48] Speaker F (unidentified): much do you typically spend every year on gear and radios? I don't know that [54:57] Speaker J (unidentified): that information in the gear we did fund, we did, i'll fairly believe five firefighters last year, some of that was our current firefighters and a few our new firefighters, and so that would [55:09] Speaker F (unidentified): be about 25 000 if it's three to five per person, and wendy can pull that information. You could [55:18] Speaker A (unidentified): probably, that would be a good request is like the five year currently outfitting [55:22] Speaker F (unidentified): firefighters, there's a line item in the operating budget, yep, for that, and you managed to that, [55:30] Speaker J (unidentified): and i've got four firefighters that are going to be taking their firefighter one this [55:36] Speaker A (unidentified): Year that I didn't know about last year. Yeah, I think to support kind of lend some support to the position that's you pick a number 18 months before you know what that final supported you can't if we you want to bring people on you can't not outfit them so it's kind of like a driven cost based on turnover and membership that you're not aware of when you're making the budget. So there is some yeah and the comment from the audience from Deputy Chief Zach Apgar was it's it comes from the equipment fund not from necessarily for turnout it's not just turnout gear or radios it's the general equipment fund that you guys use to fund all kinds of other [56:20] Speaker H (unidentified): their purchases throughout the year so not if this was in the operating budget [56:35] Jeff Welch: Yeah sure so yeah to follow up on what Deputy Chief Abkar said the turnout gear is coming out of the general equipment line item in our budgets now. And generally, I'm planning on replacing two to three sets of turnout gear per year. What happens is if we have gear that's expiring and we need to replace those two to three sets, and then we have two to three candidates that come in that we're going to put through the Fire 1-2 process, when they come out of that process, they need to be put into an appropriate set of gear. So now that's turned into three to five sets. And then if you have a call and on the off chance you wreck a set or two or three there's a possibility where you could get into a year where you're buying eight or ten sets and other years you're buying nothing. Yeah generally you figure like I said we're figuring on two to three sets a year down at the beach station to kind of keep at the minimum pace of replacing what we've got that's expiring like we had we had probably 15 sets 12 to 15 sets over the last couple of years that had to be disposed of because they were 15, 18 years old. They were falling apart. [57:49] Speaker A (unidentified): And just for reference, I know you've got the information here, the required service cycle replacement for fire gear? 10 years. [57:59] Jeff Welch: 10 years for bunker. For an interior firefighter. [58:02] Speaker A (unidentified): Gloves, pants, jacket, yeah, boots. [58:05] Jeff Welch: The other thing to consider that would be beneficial to have this reserve account and get this into play, there's a lot of new technology coming out in the manufacturing of the gear with PFAS free materials. And I would not be totally surprised if we see something come down the line in the near future from NFPA that changes the requirement that you've got to get all your stuff upgraded to the PFAS free materials by a certain date. And that's going to place a substantial cost on fire departments to put everybody in those garments. [58:42] Nicole: Is that because you have foam or other products that have PFAS now and you would have to replace it? [58:52] Jeff Welch: There's PFAS in the turnout gear material. Yeah, there's PFAS in the garment. So they're starting to release. They have been releasing PFAS-free gear, and it's becoming more available. And, you know, the talk on the street is that eventually that will be a mandated thing. [59:11] Speaker J (unidentified): so and the gear we've been purchasing is pfas safe yeah all the pots the pieces like the glove is not completely yet yeah you know anytime we have that option we take the pfs free we've got [59:22] Jeff Welch: you know we 've got some stuff you know there's different layers to the turnout gear and they've [59:27] Speaker A (unidentified): kind of been working layer by layer, so certain parts of it are certified PFAS free and other parts are still incorporating different components. There are certain manufacturers that are making [59:37] Jeff Welch: now all PFAS-free. We've been kind of taking a step back and watching to see, you know, are these garments now going from 10-year garments to they're falling apart in three or four years because there are different materials. So we're still kind of in the studying phase on that. But like I said, I don't think it's real far off that we'll see a mandate come for PFAS-free turnout gear. [59:58] Speaker F (unidentified): In order to be prepared, am I hearing that you buy gear in advance and sort of have it on hand for when you have new firefighters come in and you're able to outfit them right away, or is it the opposite where you get someone new and then you have to order and there's a lead time, setting aside the budgetary [1:00:17] Speaker J (unidentified): structure issues, because of its, because of its age requirements, we don't want to buy ahead of time and never sitting on the shelf not being used. We want to buy [1:00:26] Speaker F (unidentified): it when we need it. That makes sense. I thought I heard that there was stuff [1:00:31] Speaker J (unidentified): Sitting on the shelf that was aging out, the stuff that would be sitting on the shelf would be the stuff that's maybe aged out but is in good condition that we can introduce the new recruits into until they take the firefighter wanted to. And so if you might have stuff [1:00:47] Speaker A (unidentified): Sitting on the shelf, if you have somebody who joined past their fire one two, got outfitted, worked for us for two years as a call firefighter, this isn't for me now. You've got three-year-old equipment that is a specific size that if somebody comes in that fits, great, you can reuse that. If in the very unlikely chance that someone comes in who that fits and you have a spare set sitting around, you don't necessarily buy it, but likely you're going to get once somebody's that many years in, you're going To get several years of use out of it or several sets per firefighter over their career here. You're not going to have a lot of spare equipment that's been turned back [1:01:26] Speaker G (unidentified): In most of the time, is that correct? Yeah, I think this is a good use of a reserve account. I mean, totally makes make sense to me if it's in the operating budget because the reserve account would go, could roll from year to year. If it's in the operating budget, is that still something that can be a reserve account [1:01:46] Speaker K (unidentified): And therefore keep going? I would suggest, I don't personally care for the idea of having reserve accounts where spending is going in and out of the reserve accounts and you're not seeing it. I personally like the idea of what kind of what code does, where they budget and then they transfer in what they need, and so it's transparent and you could see next, the next year, what was actually spent versus what was budgeted. So you still have a reserve account, but you're [1:02:10] Speaker G (unidentified): Funding it from the operating and it goes into that reserve account. Yeah, if [1:02:13] Speaker K (unidentified): You think you're going to need fifty thousand dollars worth of turnout gear, you budget fifty thousand dollars worth of turnout gear and revenues from the reserve. If you end up needing forty thousand dollars, then you just transfer the forty thousand dollars in. If you end up needing sixty thousand dollars, that reserve is still there, but you see it in the operating budget, so for the transparency. So you're getting the point of my put it here is [1:02:37] Speaker J (unidentified): Get the conversation going. However it's supposed to work out, I'm up for it, but the idea, you've got, you've got the idea of trying to get out there. Yeah, I think that's police department deal with [1:02:46] Speaker A (unidentified): The same issue. No, not for equipment. They're going through their stuff, tasers, radios, their stuff is typically less, their uniform stuff. There's more components and it's smaller value and it's replaced more frequently, I think, so it's operating budget, you know, shirts and pants, duty shirts and pants, and other than side arms and radios and stuff. But they've also got, you know, 30 people that they're cycling through per year, so it's easier to, it's easier to average out. The more people you have in a department, the more average your purchase is going to be every year. So what you're talking about, I mean, you really get hit with the high cost, you know, of individual equipment and the variable low number that you're planning, and that number might be two or might be five, and that's, you know, multiples of tens of thousands of dollars difference. If you're budgeting twenty thousand a year for, you need to spend thirty. If you're budgeting twenty thousand dollars a year, need to spend zero, those are very different outcomes. So, well, I mean, I think it's definitely got merit for discussion. That's obviously why I wanted to talk about it here. The question would be whether we had a large capital appropriation into it to start, whether we slightly increase the budget and any savings get earmarked each year into the, into a reserve fund like what Wendy is describing. That would be another way to do it. There's probably two different ways that, three different ways we could set this up, and I think that's a good discussion [1:04:15] Speaker C (unidentified): for us to have moving forward. So I'm sorry to be numb, but I'm not sure I understand. If we're still budgeting for each of these items every year, is the goal of the reserve account to minimize huge increases from year to year in the operational budget? Because my understanding of how we do the police vehicles, right, is that we always allocate a certain number of dollars so that they can be purchased within the fiscal year or with, or outside of the fiscal year, without interrupting the cycle because of the availability of the vehicles. So I'm, I'm trying to make the connection of how this is different from having these items in the budget, because what's, what he just said is that we would still, let's say fifty thousand dollars we budget in the equipment, and why does the reserve, why is the reserve fund important [1:05:13] Speaker A (unidentified): Because of the variability, so that they, so I guess you could have fifty thousand dollars in the operating budget, pick the high number of the highest year and put that in every year. But I think what we're suggesting is that you, or at least we're discussing, because I don't know if I'm suggesting it yet or not, the, that you would put a low medium number in there, and when you didn't spend that would carry over from year to year. So right now it's in the equipment line if you were to call it out separately and have your, so what happens is when you have a high purchase year for protective gear, you are not buying, you're holding off on equipment purchases, or you have to make sure you don't have overtime costs, or somewhere else in your budget you defer something until a future year. If you need to buy $20,000 more in protective gear that you didn't have, because you need to put five sets of gear on somebody because something expired and you weren't expecting it, or new people, well you know to expect what's expiring, but you don't know what you're adding for new gear or damage in year. So to budget that as a reserve, you would budget a lower number consistently, and when you didn't spend that you'd sock money into the reserve. That's what Wendy just described, that there would be reserve that went along with it, so it would still be in the operating budget. I think of it a little [1:06:32] Speaker K (unidentified): bit differently. I think of you continue to budget in your operating budget, you fund, you get, you get that funded, we established the reserve for fifty thousand dollars, and then if you need more than what you've budgeted in your operating budget, it's there to transfer in. That's kind of the way I was thinking about it, but there's a number of ways we could [1:06:57] Speaker C (unidentified): Well I think that's why I asked about the offset on the operating budget. Does that mean that instead of, you know, just taking a swing and saying okay, well we're gonna go with 50,000 because we can't be without three suits, you know, are we still budgeting on the more conservative side, and then if we have a influx of volunteers, then this budget is available, so that they're not going to select board for contingency because that's the only other option, right, or to do less spending somewhere else, got it, thank you. In which case though they would, they would require a less [1:07:31] Speaker A (unidentified): Amount in the reserve, right, not 50,000. Well, they would. So if you had 20,000 per year budgeted and operating, so the way I just thinking on my feet here, because this discussion's gone three different directions. So a way that you could set it up is you set up, you do your year to year across, let's just say it's across both departments, maybe it is, maybe it isn't, what your lowest minimum floor kind of is that you've spent over the past 10 years, right, like in that you're, hey, on a minimum year to go, we need three and three sets of gear replaced on our replacement schedule, like, you know, there's no year where you're not going to be routinely replacing a certain number of gear. You set the budget amount. One way you could do it is you set the budget amount at that, and then when you have additional people coming in, there's a, what Wendy just described, there's a reserve fund established to pull that money out of, so that it. [1:08:24] Speaker H (unidentified): For unexpected. Correct, right, yeah. [1:08:28] Speaker F (unidentified): Yeah, the way I see this is you're seeding a fund with 50, 100, whatever the number turns out to be. You continue to budget in your operating budget for these things. If you have a need that exceeds your operating budget, you have this reserve available to dip into. Yeah. I guess the question is, if you don't spend that amount, does it impact the reserve? I wouldn't think so, you're simply, yeah, you can set it up at a, it [1:08:53] Speaker A (unidentified): depends if you want to set the budget amount at a low so it's like again three different permutations do you want to set the budget amount at a low the floor that you think you're going to spend every year and then always take any overage out of the reserve and always put money back into the reserve when that gets low by the town meeting vote for example or do you or do you want to set your annual budget at a medium level may be where it is now and somehow authorize well not somehow authorize money in and out to be lower or higher coming from that reserve, either from or to the [1:09:25] Speaker F (unidentified): reserve, and then you don't have it. 's a question for years when you have surprises, right, and is it [1:09:31] Speaker A (unidentified): and the question is do you want to be having individual votes going back to the voters every time that reserve needs replenishment or do you set the budget level slightly above what you think you're going to spend and there's a poll there I mean I'm assuming it would be a fun to stop it would be done in the establishment of the fund by vote that when if the amount goes over this the surplus goes into the like if this is unspent in the operating budget it goes into the reserve fund I'm not sure [1:09:55] Speaker K (unidentified): That you can do that. I think it has to go into fund balance, but you can, you can, you can transfer in the overage that you would need from the reserve, and you would budget the replacement of the reserve funds to keep that at a solid level, and you still continue to budget as normal. So right, so because it's not. [1:10:15] Speaker A (unidentified): Revenue, because it would be unspent appropriation, your feeling is that couldn't automatically go into a reserve fund, but you could earmark. [1:10:26] Speaker I (unidentified): Revenue. Yeah, a couple more questions. The radios, how does that fit in with the gear sort of thing? It's just every employee needs a radio, it's part of the gear, so to speak. [1:10:42] Speaker J (unidentified): You have to go inside the building, they should have one. It's the safety feature behind it. If you get, if you get removed from your, you know, loss from your, if you get trapped somewhere and you have with your partner, you still have communications and so forth. Again, it's the way things are done now. The issue is we call mutual aid, not every town has the same radio frequency. We got over that hurdle, but now there's different frequencies, different, there's UHF. [1:11:22] Speaker I (unidentified): We did talk about that. Yeah, different bands. Yeah. [1:11:24] Speaker J (unidentified): And so we have multiple band radios and that takes the price up. [1:11:29] Speaker I (unidentified): Okay, and the other question was, now that we're talking about reserves. [1:11:33] Speaker K (unidentified): Are we coming into a place where we have a lot of reserves in the town to kind of cover things, is that no more than last year? Wonder, I mean, we're talking about adding another one. I think it may be in a different forum. We have to have conversations about reserves, because I really personally, I don't know how much weight that carries, but I don't like the idea of having 10 reserve funds. I mean, I think we need to budget as best we can. Thank. [1:12:02] Speaker A (unidentified): You okay? All right, next item. Just don't go anywhere, because then I mean, let's throw out, I'll throw this out. The next item is fire station upgrades. So there's two components to this, right? So there's kind of the long term. We should start with, I'll give you three. Well, again, I put this in last year and it [1:12:26] Speaker J (unidentified): got cut because of other priorities that you know the town had but you know to start off with anything you've got to do some sort of a initial investigation detectives say okay we know what this is what this is what we want to do how we're going to get there and what do you think the cost is going to be so through this 50 000 out there just as you know we just went through it's like a consultant you know it's gonna be twenty thousand gonna it'll be $50,000, whatever, but we have to know what we're gonna do. [1:13:05] Speaker A (unidentified): So there's two components drive, so I'll give some of the background so people in the audience, people on TV in the room can discuss. So there's two components to this. There was a plan, previously there was kind of a medium term plan to increase staffing levels in the, that we've talked about several times, both with staff, with chiefs, with management, to increase slowly increase staffing levels at both fire stations to get to long-term goal being two people on around the clock just because of call demand. Now that was the plan was never that in one year we're going to add eight full-time people that would be four in each station to get to two on around the clock, but we had discussed starting two years ago, three years ago, like into last year, could we add one per station each year, you know, over a time period to get to there. As we're having that discussion and I'll, this will key into an ambulance discussion very quickly here, which for better for worse the staffing quarters were identified as even if we're just adding staff at the fire department to have two people on around the clock at village fire to be problematic. So at beach there it's not fantastic, but you have ways as I understand it to make quarters for two to three people with some minor accommodations inside in the living quarters, the separate living quarters that you have there. It wouldn't be ideal long term, but it's something that we could do as we're planning future facilities, and you know, it might match better with the duration of the life of that station being we'll say for discussion 20 years or less. Village on the other hand you have one set of living quarters with The bathroom and a sleeping area that's kind of open like a studio apartment, so it's really designed to house one person around the clock. It's like the best way to describe it. So assuming we needed equal sleeping facilities at both areas, beach would be a little bit significantly easier to address by essentially by walls and doors, really one wall door kind of situation. You don't have the living quarters, you would need to convert some other area of the station to a living quarter, sleeping quarter. For at least one person if we were to add an additional person on around the clock. Correct, for a short time, yes, yeah. But the but the long-term plan would be to convert space that you have existing into additional staff quarters. Okay, so now does everybody understand kind of the baseline of where we're at on that? Okay, so fire on what the long-term plan would be to develop, because that's what this is, right? This would be to develop staffing quarters, yeah. [1:15:49] Speaker J (unidentified): You know, initially it was that an additional full-time employee, but bringing it into the future, we don't know who the ambulance, if you're going to go through the process of creating staffing for one additional, make it for at least probably four additional FOR FUTURE. [1:16:09] Speaker A (unidentified): THREE ADDITIONAL, FOUR OVERALL. YES. [1:16:13] Speaker J (unidentified): AGAIN TO DO THAT WE HAVE TO HAVE THE PLANNING PORTION DONE AND THEN HOPEFULLY START THE IMPLEMENTATION NEXT YEAR. [1:16:20] Speaker A (unidentified): SO THIS PROCESS THAT YOU'RE CONTEMPLATING HERE OF ADDING STAFFING QUARTERS, WE ALL KNOW I THINK IN THE ROOM, BUT IS INDEPENDENT OF THE AMBULANCE DISCUSSION WHICH WE ALSO NEED TO HAVE, BUT THAT IS FOR THE LONG TERM OF ADDING ANYBODY. YOU WOULD BE ADDING STAFFING QUARTERS AT VILLAGE. [1:16:37] Speaker J (unidentified): Right. You know, it's well known that the union wants additional people on the floor. We're not against additional people on the floor. You know, we've discussed it quite a bit. We've discussed how to get that additional person on the floor and yet keep the call force very active within the department to keep their enthusiasm and know that they needed their commitment strong. [1:17:04] Speaker A (unidentified): Strong, so we're ready to move forward with that. Okay, so this, so your vision, or I mean, I hope I'm summing up your vision correctly, the long phase process, and you have in future years you have building phases than that cover sheet that you saw that would go into the comprehensive plan in years three, two and three. The long-term vision is if we don't need to put people in your station immediately, this is how you would like to pursue it, right? I mean, the Union could come down and [1:17:33] Speaker J (unidentified): and they get negotiations of 2028, I believe, and if it comes out that they want two people and for somehow they went out on that, we need to be ready, you know? And there's nothing, you know, the time is here to have multiple people on the floor, but we're not there because we haven't started the process. [1:17:55] Speaker C (unidentified): So may I point out that this is a really good example of capital and operations not being tied together in a way that makes a lot of sense to my brain. So what I'm hearing, and I'm supportive of, to be clear, I'm just asking questions, that you're needing a study to be able to plan for when we need more firefighters. No, what is the timeline, what's more firefighters, right, another full-time firefighter, no [1:18:28] Speaker J (unidentified): there's no study, no, that's what the fifty thousand, that's what the fifty thousand is for [1:18:33] Speaker C (unidentified): for the building, for where to house them, yeah, right, yeah, but where in our budget [1:18:38] Speaker A (unidentified): are we hiring more firefighters? Not yet. It was in the operating budget discussion last year and was in all throughout it, and was, we did not add additional side, we had discussions about adding, starting a process to increase staffing at the fire department, both fire departments, throughout the operating. Did that, was that any of that in front of the budget committee, or had we already kind of made that? I think we had made that discuss, we had talked about at the slackboard level, management level, and it didn't go in because of the, I mean it was four hundred thousand dollars [1:19:12] Speaker C (unidentified): what we were talking about. So yeah, I just, I'm, I'm, this is an example, I'm connecting to an operational change that requires a capital investment, correct, and the operational change hasn't, hasn't necessarily made it into the plan yet. So I guess my question is, do we have, is it this budget season we're gonna ask for additional [1:19:33] Speaker J (unidentified): firefighters? I'm not going to, yes, I'm not gonna ask for additional firefighters until I have a place to put them in the station. That's my objective. So yeah, so [1:19:48] Speaker A (unidentified): Well, the reason that this wasn't in the capital program last year, this was in the request, this was in David's request. This is, this is actually in your, this was in the out years. This is in the out years, these items. Yeah, well, all of your steps were in the out years because it was not put in year one because the additional staffing did not get put in the [1:20:07] Speaker C (unidentified): operating budget. Okay, so when will the additional staffing be put in the operating budget? [1:20:13] Speaker A (unidentified): There's a lot of parts that will determine that. We're not out yet right now, so we may, you may have this come out of the capital budget, additional staff put into the budget, and building funds go into the capital budget request. If the, if the determination is that we want to add staff this year, this is, this is tied to the ambulance. It is now, it wasn't, it wasn't when it was not last year. Now it's a two-part, yeah, now they are tied together at the hip. Yeah, well, I mean, so I guess what I would say is you probably won't see a plan put forward that adds, I haven't been developing, I know they haven't been developing to add one person a year for three years because we are likely to hit a trip point where either we need to add four people per or we don't need to add anybody based on a decision that will be made in the next two months. Yeah. [1:21:11] Speaker G (unidentified): So a couple of things. So you've got over the three years two hundred and fifty thousand, so I'm understanding two hundred thousand is construction and fifty thousand is study. I have no idea what the cost is going to be, so I have, I don't either, but fifty thousand out of 250 for studying, it seems like a lot of money. Study was, I put down fifty thousand because we just had a study for the endless [1:21:35] Speaker J (unidentified): which was went from twenty thousand to ninety thousand. What's an architect going to cost? I don't know, so I put down two thousand. Hopefully it's only fifteen thousand. [1:21:43] Speaker G (unidentified): But you're, but you're building it within the envelope you already have, you're not adding square footage, correct? So I mean, I don't, I don't even know if you need an architect. You get a [1:21:53] Speaker A (unidentified): design, we can't add square footage, we can't add square footage to the building there in [1:21:57] Speaker G (unidentified): those locations. So I don't, I don't know why we're not, so [1:22:05] Speaker A (unidentified): the, so the comment from village fire department members in the audience, sorry, since I know he's not on microphone, is that there's sprinkler studies that would need to be done if you wall, if you partition the building differently. [1:22:15] Speaker J (unidentified): You can't just go and put walls where you want to put them. [1:22:20] Speaker G (unidentified): I just think this needs to be expedited. I'm the opposite. I think this needs to be expedited, and we need to be doing it more quickly. So maybe I misheard, but is there under any scenario where we don't need more full-time fire people or ambulance in the village? [1:22:38] Speaker A (unidentified): Not long-term, but potentially short-term, yes. [1:22:40] Speaker G (unidentified): Short-term, there may not be a need. [1:22:42] Speaker A (unidentified): Correct. But I think long-term. [1:22:45] Speaker G (unidentified): What that looks like, what do you, what do you mean, what does it look like, we only have one fire [1:22:51] Speaker A (unidentified): person on at a time. If so, if the ambulance function does not come into the fire station, which is definitely a possibility at this point, probably more likely than not, I don't know, if that doesn't happen, we do not, we do not need to add staffing. There is, there is a, there was a request to add staffing, which I think is reasonable, and I think there's a long-term benefit to adding staffing into getting to appointment of people. [1:23:22] Speaker G (unidentified): So are we having a challenge hiring full-time fire people because they're on solely by themselves? [1:23:29] Speaker A (unidentified): I would say to some extent, yeah. [1:23:33] Speaker G (unidentified): Don't we have an open position? [1:23:35] Speaker A (unidentified): Not right now, but we've had an open position for a while, and that was part of an issue, yeah. [1:23:39] Speaker G (unidentified): Yeah, so I just, I think that's an issue. Yep, that under this scenario we're waiting like four years, would [1:23:52] Speaker C (unidentified): it be possible to get an estimate of what these, this work would actually be, because I think to Robert's point, it might make more sense for the architectural study and the sprinkler study to happen sooner rather than later, that maybe the select board takes that out of contingency if there are other things that happen sooner, because I think for me, just seeing a $50,000 kind of thrown against the wall, I think if you had an actual quote of what those things could be, I think you might be able to push it through sooner without the capital process. [1:24:27] Speaker A (unidentified): Yeah, I think that would be certainly supported here, and I can't speak for the entire select board, but one of them has just been very vocal that he wants to see that addressed [1:24:38] Speaker G (unidentified): sooner rather than later, so I don't see, I don't see a loss, I don't see a loss in [1:24:53] Speaker A (unidentified): a sunk cost to doing the planning phase. I think timing of that, when we actually need to construct, that may change by a couple years, but I think, I think what Dave's put out here is probably the long-term, the farthest outside timeline, two to three years, when we would envision going forward with adding staffing around the clock. So it definitely meets that goal, but there are a few situations. So let's get to the ambulance discussion in a second, but the ambulance discussion would push this forward, could push this forward, a couple of different scenarios. Like next summer. Potentially, as soon as next summer, yeah. So, and then the, we, it could push forward, just not even the ambulance discussion, we could push it forward because of needs, because of a change to the ambulance situation that doesn't involve adding staffing to the departments, but we might need people on at certain times to support a different option that's chosen too. too. So sooner than three years. So I don't think that 's bad to discuss doing the design work now because I don't think you're losing. I don't think does anybody think we're losing we're blowing money because I don't see a situation like within five three to five years where we don't need that study for doing construction work. Unless the fire department moves to a different location. That is a scenario I don't think anyone's I don't think there's any plan to relocate Village Fire Department in the next five years and I don't think there's any plan to relocate Beach Fire Department Jeff and I have talked about long term the long-term viability of the beach location and again for the record we're talking tens of years out but is that the correct location long term for York Beach and is it for both flood reasons for traffic reasons and for central kind of being central to your service here yours has the bigger question mark but it's not an immediate I just want to be on the record it's not in the five-year plan it's probably not in a 10-year plan but it is in that kind of horizon that we would start asking those questions [1:26:55] Speaker G (unidentified): i would think does that match your yeah plan yeah so you just said with that york village at least for the next five years would not be moving so that time frame for a building and this sort of thing seems awfully short is there a chance that in year six york village fire department's not there 's no plan to relocate york village fire department but yeah you said five years it's sort of surprised me a little yeah no there [1:27:22] Speaker A (unidentified): Is no plan to move either there is, because they're talking about a five-year capital plan. Yeah, that's exactly why I said five. We have never had a discussion about relocating village at this time. I know there have been discussions anybody in the building if it's a five-year time. No, but I, but I'm disclaiming, I'm disclaiming the discussion about beach with their there. We do need, that's why I asked that question when we talked about generator, because the lifespan of a generator might be within That's what we're having this, these meetings for, is to make sure we're not making bad investments and 20 years. We do need to start asking that question, and that's not something that would, if you were saying I'm putting something that's got a 30-year lifespan at beach and it's non-relocatable, I might say we might want to wait until we have a long-term horizon there. I have no issue with spending money on village to be clear. There is no plan to relocate Village Fire Station. It has not been discussed. People have conceptually discussed it, would it be better in different locations before, but there's not any real work that's gone into, or any plan, unless I'm missing something, Dave, or any of your members in your department. Okay, good. [1:28:24] Speaker F (unidentified): So, when we had DPW here, there was a capital budget request for funds to upgrade their facility, and because of the nature of their facility and you brought up sprinkler issue, there might be others. An upgrade to village fire perhaps requires a first step of some engineering architectural study, call it what you want, before you move to construction, as opposed to the DPW request which as I recall was to allocate money to do the work, right? So is that the case, and are they sufficiently different that this proposed approach makes sense for this facility as opposed to the proposed approach for DPW? Because in a sense, we're talking about the same issue of working conditions for our employees that you highlighted the DPW. You and this really is about working conditions for our employees sort of at whatever staffing we're okay at our current staffing level, but the biggest difference is that it's living [1:29:40] Speaker A (unidentified): quarters at the fire station which are very different as opposed to big lounge chairs and between which are very different code requirements for sleeping quarters for fire, for sprinklers, for alarms, for all that kind of stuff, pretty much I'll say it in a non-fire inspector way. So tell me if I'm saying anything illegal, so that'll get us in trouble. But if it's not a place where someone's sleeping, where there are people sleeping full time, the standards people, fire inspectors code, people look at that very differently because you're awake and alert, or at least someone in the building is awake and alert and supposed to be there in an operating capacity. An office facility has fire standards. [1:30:14] Speaker F (unidentified): These two requests really are apples and oranges is what I, or maybe there's some overlap because we're talking about working conditions for employees, but,. [1:30:25] Speaker J (unidentified): You know, I don't know which building you're talking about, but if it's going multiple. Chase's Pond. Is it going up multiple floors, or is it just expanding out? If you put a smickler system in there, we don't need to protect your investment. [1:30:40] Speaker F (unidentified): Yeah, that was, that was a little bit, it was a little bit undefined as well, I guess, is kind of what I'm feeling. These were, this was some, sounded like the DPW one was, had just, was just a throw it against the wall, quite honestly yeah that's and that is my point but then I'm thinking through that these are different situations but I'm not sure I'm I'm just [1:31:08] Speaker J (unidentified): still processing my name sleeping quarters you know people sleeping there at night they have them waking up in the middle of night out of a dead sleep to go to emergency calls have to worry about them tripping falling down stairs, lights coming on at the right spots, the sprinkler system as we talked about, there's many, much more to it when you've got people sleeping overnight. [1:31:29] Speaker A (unidentified): So the difference, so what Tim is contemplating is a rehab of existing space for public works, a refinish, which I think to get to the working conditions part of it, there's rough finishes and, you know, it's not in the best condition, all of the components. A major rehab to a structural component being the roof and then a potential expansion to add additional room so there's three components to that but two of them are they would not be any significant change to may not include any significant change to the layout things like that so what we're talking about here is would be a substantial change to layout relocating certain parts of the building into different areas mainly the upstairs and the downstairs living quarters and the office quarters Would be what's in play that's really what you have for free space over there and Tim's was absolutely thrown at the wall at the last minute because I asked him to include it so it could be discussed because I know people had made requests about living conditions last year and they need to be addressed or not living in working conditions so this is very flexible and not to be intentionally vague but it's very flexible depending on the outcome of your staffing level discussion which is up in the air right now I mean for example a forced increase in staffing addition if you need to add people this has to be addressed in year one the entire component might not be 250 000 but whatever that amount needs to be where's the other 200 it's in out here it's for construction it's not in this [1:33:01] Speaker F (unidentified): Yeah but it's it's here thanks 100 000 fiscal year 29 100 000 and Dave had broken this out this [1:33:09] Speaker A (unidentified): this way last year as well but it was not done in year one yeah with the understand no we talked about this last year and you kind of put the years two three and four is getting this done as hey you might want need to move these up based on staffing level discussions I said noted I think you were very clear [1:33:29] Speaker F (unidentified): about the purpose of this working group is to give you feedback and then you're going to develop the plan and bring it back to the select board say in December so do you have the feedback you're looking for this purpose I mean I don't see this we're just kind of throwing out responses based on right that's what it's for yeah so are [1:33:54] Speaker A (unidentified): we good or unless anybody has anything burning they need to add for this yeah [1:33:59] Jeff Welch: Not meaning to step in on Dave's time but just to clarify for beach fire in the living quarters is beach fire is ready for a second when I say ready two part we're ready in terms of call volume and need we need a second person on the floor down there we need two firefighters on duty which would be an additional four positions which I asked for last year but it never made it through the process we are semi-ready in terms of accommodating that second person, there are some shortish that, you know, we could get by for a year. If we're going beyond that, we might need to do a bathroom renovation, put some sliding doors in some of the bedrooms. If the ambulance comes to Beach Fire, at some point in time, I think at absolute minimum, we need to have the living accommodations on the docket to accommodate three to four people for the, when I say long term, five years out from now. So just food for thought, if we're gonna have somebody take a look at Village Fire to accommodate four, it might be who of us to have them look at Beach Fire as well and say if four is our anticipated number five years out from now, three to four, it just might be good to do that all at once. Yeah, I've definitely noted that you're [1:35:19] Speaker A (unidentified): your I'm good situation is only for adding an additional person. [1:35:23] Jeff Welch: We could do it, you know, in a pinch, but it's not ideal. But I think that if we get down the road and it looks like an ambulance is coming to the fire station eventually, it might be good now to figure out what our plan is to accommodate the three- to four-person model. [1:35:39] Speaker A (unidentified): Yeah, and that would be included, and if that happens in the next year, that would have to be included in year one. Correct. [1:35:43] Jeff Welch: So I just didn't want to leave that out and then be back here next year and have you guys saying, wanting to mention that last year when Village Fires if they needed some accommodations so [1:35:52] Speaker A (unidentified): Yeah, I think it would be good to take a look at it. So let's talk about ambulance contingency because there's two parts. Can we have that discussion really quickly? So there's two, I don't want to throw hard numbers out but I want to have everybody know what the thought process is and you can give me feedback. There's two components to it, the first, not talking about operating, which is a staffing discussion, not talking about fuel, not talking about, you know, operating supplies, all that kind of stuff we're talking about capital items. There's two components, one is building. So Village Fire has a, would have a significant required component to a building project. You just heard from Jeff what his break point would be, a little bit different, but long term there would be some upgrades needed. But you're, you would have a significant relocate, rehab, relocation of living quarters within your building that would be done. It doesn't have to be a significant construction project but it would be change of The layout that you have now and utilizing different space, so that's part one that would be included in an ambulance contingency funding. Part two is the financial purchase of vehicles. So there we've had a ton of discussions about do we get used equipment, new equipment. The worst, I think the best way to keep this in all of our minds is the worst case scenario of having, and I don't mean bad, but a worst case financial scenario. The most expensive case scenario would be adding two vehicles that were new, and the upper threshold for that at current dollars, as I've been told to say, is in the $500,000 per range. Might be lower for smaller ambulances needed at beach, for example, but the largest ambulance, the heaviest duty ambulance with the required equipment that we need to add, which are a few components like a stretcher, power stretcher, stair chair, that kind of stuff, would be in 500 000 per range for each. So that the way to break that down is 500 000 for ambulance as a bond appropriation in year one with multi-year, you know, whatever the going bond rate is, or a lease purchase which is in the four to five percent range of a hundred and fifteen thousand per year over five years that which could be com added into the operating budget component. So that's that's what's bouncing around my head right now. I know we're not at that decision-making phase, but you guys have heard that from me, everyone at the tables kind of now hearing that. So what we're talking about in year one if in a worst case financial scenario saying you need to provide ambulance service out of a fire station would be the building upgrades that Dave and Jeff had just talked about and potentially two hundred and thirty two hundred fifty thousand dollar operating for a lease purchase in year one would be the cheapest that it could go, or we could decide to bond for ambulance purchases. And I use those numbers because they're the big scary numbers and not the we're going discount shopping for three used ambulances that we're going to need to be patching together all the time, and that's like the big picture we're buying all new [1:38:49] Speaker C (unidentified): equipment picture. So and to be clear, or maybe to ask a question, yeah, are we anticipating that the May 2027 vote if we need the ambulance contingency will happen then. So we're gonna be approving that capital before March. It could, yep. [1:39:08] Speaker A (unidentified): Yeah, so in a scenario where we're expecting to start that July one, which is a very compressed and probably not the most likely scenario at this point, that could be in front of you guys in December or January for the budget committee, December for the select board to talk about. And then obviously operating wise, the additional staffing and the additional revenue that we would generate if we were running an ambulance operation would offsetting revenue would also be discussed at that time they're they're small there's a small number of items that would be on the table but they're large in cost does anybody want more detail on that or I think I'm jumping the gun I just want to throw it out here that if you know in a month you hear hey there's hundreds of thousands of dollars into this that we didn't discuss that's where it's coming from. [1:40:01] Speaker F (unidentified): We have a vote on Tuesday for the near term. And we have a study underway that we should get the results by mid-November. To me, those are the near-term goalposts, [1:40:12] Speaker A (unidentified): and then we go from there. It's really gonna steer where that discussion goes, 100%, yep. Okay. Anything you guys need to add to that? [1:40:20] Speaker G (unidentified): I would add to Marla's timeframe that I think tonight, York Village Fire Department Corporation is voting on loaning, isn't it? Thursday night okay for the SBA loan which to me is another big huge trigger for what happens ambulance future good [Speaker A (unidentified): luck so] is that a week from Thursday [1:40:52] Speaker A (unidentified): week from today they brought up after the vote results are known because it's kind of dependent what the future is of the vote yeah so well i mean yeah okay thanks guys thank [Speaker G (unidentified): you hey] did anybody have any problem moving forward on some additional town items so we get them off the list okay get nicole here hers is kind of dumped on her by me you're welcome nicole the cliff path and we'll wait till everyone comes back in the room how about that All right any questions nope Yeah, you do have it already I have it already too Do you want to pause us for two minutes and just yeah, all right back on Thank You everyone Yes All right, so cliff walk this is do you have the actual supporting materials because I know these two people might want to grab the studies because Wayne and Heather have not received this you might have heard about it so we're talking about the cliff walk path yeah so i 've put in the executive summary and kind of nicole had put in some of the history of the options that were presented to the select board so this is an outgrowth of the presentation that was done the study that was done over the summer structural study and the engineering work of like hey what how much of this can be rebuilt and how much of it can be is going to be a massive project versus just a structural surface repair and I think 5.9 million was the number that was thrown if we want to do a full resilient repair of the cliff walk path meaning address all the underlying issues and rebuild the surface to similar to what is there they're now to the sewer pump station. [1:44:38] Speaker D (unidentified): Yeah, and that number is inclusive of a 20% overall placeholder for engineering. That's typically what their fees would be to do the full design of repair. And then also a 20% contingency just for, depending on how long it takes us to get to that point. For inflation. Yeah, inflation and various things. [1:45:02] Speaker A (unidentified): So that is the full repair. So that report right there is the analysis. [1:45:07] Speaker H (unidentified): You can read it at my leisure. [1:45:10] Speaker A (unidentified): Yeah, you've heard about it, I'm sure, but you haven't been experienced to its full greatness. So, Wayne, now you have it too. You can have fun with that. But the question is also, is an option less than a full rebuild? So that's been circulated quite a bit. We've had discussions at the select board level. The public debates that and deliberates on that. As I understand regularly we hear from people why aren't you just doing this to this point which is different than the point that we've chosen you know we get those kind of comments why aren't you going a half mile in and stopping there why aren't you going all the way why aren't you going past the sewer pump station which is not on the table right now so the I mean that really boils down to do you want to talk about the first the lower option yeah so the lower option would be [1:45:58] Speaker D (unidentified): Going up to there is not an exit point, but I use where Starboard Lane ends as kind of the marker for roughly how far down we would go. Select Board members know because it's been a conversation often, but there is a little kind of overlook area out there that could be something that's an easy geographic ending point, and so it would be an out and back, so up to that point, turn around, come back. These repairs are inclusive of the washout that we were aware of as well as the revetment that we found to be severely undermined. It wasn't anything that we would have been able to tell easily. They found it from a very small hole that you could see if you climbed all the way down to the bottom of it, and then it goes feet in feedback, it's hollow essentially. They were just poking every little hole they could find and they kept going on that one, and that is inclusive of all needed possible repairs including small ones, areas that they said, you know, this isn't an undermined section right now but it is now vulnerable to become undermined, so that would make it so that, and same with the large number, that's inclusive of all extensive repairs to make sure that we're really sturdy would no matter what pathway we go, yeah, so that's that one including, you know, even some of the paved area that we paved recently. Obviously the water comes up there often, so it's something that there's some stuff that they can do there as well, but [1:47:40] Speaker A (unidentified): yeah, that's the first option, that's 900 and sub 950,000 in current crisis, yeah. Yep. Or that's estimated at sub 950,000. [1:47:55] Speaker F (unidentified): I'm looking at the project submission form and you've got it at the full 5.9 million. You also have a priority ranking of must do, which would be an indication that not completing this project will lead to potential life safety issues, damage to property, or legal compliance issues. And I wonder if somebody can explain why must do was chosen as a priority for this proposed $5.9 million project. [1:48:22] Speaker A (unidentified): I have a guess, but do you want to? [1:48:24] Speaker D (unidentified): Yeah, so for that one, it's because it's a FEMA project. [1:48:27] Speaker F (unidentified): So can you speak more to those, how that works? [1:48:31] Speaker D (unidentified): Yep. So with the FEMA funding, so this was obviously damaged by a storm. So we've submitted it as part of the public assistance grant process to be able to be reimbursed for repairs. repairs. We have timelines that they put on repair method or for repairs to be conducted. Typically it's 18 months from the start or from the declaration date that they want permanent repairs to be completed. You do have the option to get extensions on those. This storm is obviously from 2024 January. So it's been 18 months more. We do have a current extension on it right now to what that was allowing us to get all of the reports that we have now. The next extension that we would be requesting for is going to be for the construction of it. They will tell us though that it is ineligible if we are sitting on it for reasons that are within our control. There are some things that they allow if it's anything that's out of our control that we weren't able to get to it. They don't allow lack of funding or just a choice, a personal choice, to be a reason that we are not actively repairing it. Because their mindset behind that is that if you're not getting to it now, making it a priority, then it's not a priority enough for FEMA funding to be allocated to it. [1:50:05] Speaker F (unidentified): When does our current extension expire? Until the end of the year. And we [1:50:15] Speaker A (unidentified): had talked about a likely decision-making time frame of this being with the budget process this year. If we go beyond that, they would likely deny any future extensions because it's not a priority. Yes, we now have all the information, the cost estimate, and if we make a decision not to budget for it, the [1:50:35] Speaker F (unidentified): wipe that off of the project list. Yes. If we advance the smaller project at the lower dollar amount, does it qualify for any amount of FEMA funding? Yes, the smaller amount would. The smaller amount would. [1:50:47] Speaker D (unidentified): Yes, yep. Yeah, so that is still considered an area that is part, not just the big one but the small one as well. Correct. Yep, at the same, at the same amount. Yes. Yeah, so we could go to them and say we've decided that we're going to secure it at Starboard Lane, we're going to allow the rest to go with nature, and we're making sure that any of our previous access points are secured for public safety so that nobody is getting down there, and that we're only fixing this part. So they would look at just that section for how much they would just get the damages from that [1:51:21] Speaker A (unidentified): section. So it's not exactly proportional, but it's only the parts that are tied to that repaired [1:51:25] Speaker D (unidentified): Section so this would it would be dependent on what the actual overall cost ends up being. Right now the dollar amount limit for what makes it what FEMA calls a large project is just over a million dollars. So anything below that is a project that once you get through all of the approvals and everything thing which can take some certain times depending on the scope of the project, then the project would be obligated and pushed for payment prior to the project being completed potentially. It's not that they will pay you before your project is completed, it's that your project doesn't need to be completed to be paid. So like with long stand seawall that's a large project. And so with those they will not pay until you have your final bill submitted to them. Can I ask how much is the matching funds? So it's a 75% from the federal and then the state pays 15. So we end up paying 10 and [1:52:36] Nicole: if we don't, there will be no state or federal money if we delay too far. Any changes would be all on the town's budget? Correct? And I think it's this [1:52:48] Speaker A (unidentified): too far is this budget cycle yes in your judgment. Yeah I would agree at that point it becomes [1:52:56] Speaker D (unidentified): we're not making a decision yes and FEMA is getting really struck right now about timelines on everything. They're not they're not liking timeline extensions. There is no rule for how many extensions you can request or if they have to approve them, it is kind of up to the discretion of those who are in charge of the region at the time. We haven't had issues in the past, but my discussions with the state as of even just last week is that they're really pushing to be closing things out because they want to be able to put that stamp of look what we've done and put that out there and closed out storms. This storm specifically is not as much of an issue right now because it's only two years old so we have that working for us but it's just something to keep [1:53:45] Speaker C (unidentified): in our minds. What is the length of this would it from heart from the parking lot [1:53:50] Speaker D (unidentified): to starboard? Well that's on page 457 written down easily. Yeah I don't think I have that part. I can GIS it if you want to give me 30 seconds. Yeah I'm just I guess I'm curious [1:54:04] Speaker C (unidentified): Because you know as I think about the support for this and the fundraising opportunities, for example, do they diminish, does people's interest diminish as the path gets shorter? Yeah, I think is where I'm curious, is it still like enough of a length to go out and say yeah, this is for me, you know, this is what I did when I was a kid and I still feel like I'm on the cliff walk, or does it like well now I'm here in front of the reading room and now I'm turning [1:54:35] Nicole: around it does seem like though the choice between doing nothing and closing completely and doing some of it and getting most of the funding now and not a not another chance to do it that seems like some amount of support could be could be raised for some part of this the most crucial parts of it my second question is there a private property that's also in danger there if this work isn't done oh [1:55:14] Speaker D (unidentified): certainly I mean some of a lot of what it is that we're talking about is retaining walls so you know if a retaining wall starts to fail then the ocean still going to be going up that way so eventually it's it's working its way of damaging people's private property as it moves inland also [1:55:33] Speaker C (unidentified): something to be made very clear when talking about it in the future or sue [1:55:45] Speaker L (unidentified): the town for not doing something. The town is protected in that sense. We've [1:55:53] Speaker D (unidentified): looked into it and that with these types of with how we had the cliff walk established in the first place it's more that it allows the town to access it and repair it if we choose so but it does not make the town responsible for repairing it. Correct? Yes, it actually makes neither party obligated to repair [1:56:21] Speaker C (unidentified): parent. Is there an argument for because I had the same question about private landowners to chip in for something like the reading room, for example, if that wall goes away chances are their building goes away. Yeah, you know is there a potential private partnership with some of the residents or the owners on that on that cliff walk to be able to help offset some of the work [1:56:51] Speaker D (unidentified): I mean, it's certainly something that could be argued. I don't know the logistics of that in terms of financing everything as well as if they're paying for then do they have say over how the time runs access and everything? That's that's a lot of conversations and yes, yellow sticky but certainly, you know the same thing of it is shoring up all of those walls and that walkway and everything is also benefiting the private property owners because then their property as well is protected. [1:57:25] Speaker C (unidentified): And do we have a policy of what we restore? No. So same thing about the areas in York Beach, right? We don't necessarily have a policy that says because of these three factors, we're going to restore the wall on Ocean Ave. [1:57:46] Speaker D (unidentified): Yeah. I mean, we have general kind of maintenance policies. Public Works has one that they're responsible for maintaining public infrastructure and all of that. This is slightly different because it's a recreational pathway. So, you know, versus Ocean Avenue extension seawall that we're redoing, that if we don't redo it, we'll lose the roadway. So we have that extra added responsibility of ensuring that we're protecting the roadway and there's a [1:58:15] Speaker C (unidentified): sewer line that goes through that one but are we obligated as a town to so let's say we lose some you know it's let's say on the north end of Long Beach right those cliffs continue to disintegrate at what point is the town responsible for fixing those cliffs do we those ones were not because that's [1:58:37] Speaker A (unidentified): all part of property first layer of houses are in the ocean hits the roadway you have to make a decision or whether you build a retaining wall to save the road or discontinue the road and only have novel access from broadway so the difference that might be 500 years from now [1:58:52] Speaker H (unidentified): but that's a decision the town will have to make i'm just getting to the point where it's unclear [1:58:56] Speaker C (unidentified): to me about what the policy like what the direction and the policy is which feels like which is the reason why i didn't vote for that particular item and so this just brings up another question of like well is it our policy to fix things before property and no falls [1:59:14] Speaker D (unidentified): in the ocean for that one and correct me i don't think there is a recreational policy you know we have the one for infrastructure but i don't believe we have one for recreational services [1:59:26] Speaker A (unidentified): yeah there's no there's no requirement or even policy or even practice that would that would you know past practice that could say at least be consistent somebody could argue to be consistent with generally that a town or city carries when it hits a facility whether that's a water line a sewer line a bridge or a roadway or sidewalk that 's when people that's when you have because that's when you have to make the decision do we discontinue the facility we have there because it's been retaken by the elements or do we do we harden coordinate so that it will survive future impacts or do we do something different so to play that [2:00:05] Speaker C (unidentified): Out then make sure I understand you theoretically those houses that I was just mentioning on the big Cliff between the Cutty Sark and the lighthouse the town with its current philosophy would not step in until the road is about to fall in correct I don't think any I don't think any [2:00:25] Speaker A (unidentified): Municipality would or government would for private unless there's a facility underneath it so you see this in the west coast right now with what's going on so malibu and you know all the areas with drops off where they have public beach facilities below you see expenditures on replenishment of the beaches or hardening the beachfront but then with the double benefit of you know the 15 million dollar house that's on the cliff above it also receives some benefit from that there has to be a public Reason to expend the funds for us so it's got to be you know absent a vote from everyone saying yeah spend all of our public tax money on saving this shoreland on a private shore that [2:01:04] Speaker D (unidentified): Would be a that would be a really big yeah so basically if this was not a public walkway a public recreational pathway we wouldn't be having this discussion yeah ocean ave sorry go ahead [2:01:16] Speaker F (unidentified): Marla so the voters previously approved 180 000 for this project how much of that has been [2:01:23] Speaker D (unidentified): Spent how much remains so we for the report for getting this we pulled that out of the sorry disaster assistance fund so we haven't spent any of that yet so the 180 remains yes [2:01:38] Speaker F (unidentified): If we move forward with the smaller project at 937 000 let's call it 950 or a million or whatever and we feel good about and we get a female obligation that would leave the town's exposure on that to a hundred thousand so we sort of already have the funding am i thinking of that [2:02:00] Speaker A (unidentified): Correctly we have to spend the money up front but the long term yes the long-term net we've already [2:02:07] Speaker L (unidentified): Spent yes when you say spent well not spent half not spent appropriated i'm sorry encumbered and [2:02:14] Speaker A (unidentified): Appropriated we have raised the money for the town's portion in the end already voter approved for this project and so just using nicole's numbers assuming they're true which is always dangerous when we're talking about assistance money ten percent being local we already have more than ten percent of the costs in hand we would need to that's my that's yeah we would need to raise and appropriate the money to do the hundreds to do the million dollar repair if we did the shorter amount net of the 180 but that would come back to the town assuming everything goes as [2:02:46] Speaker F (unidentified): Planned which is always dangerous more than we've already before the warrant before we all go through our process in the spring. You're going to know if you have a further extension, yes, and if so [2:03:01] Speaker D (unidentified): to when. So that's where it gets a little tricky right now, just with the way that they've been acting in the past couple of weeks with these larger projects. What we've been working on has been getting an extension until the point of where we're currently at. So I'll use ocean of extension as an example because it's an easy one. We had an extension that was through our anticipated bid, so I had an extension that goes until next month because we were anticipating a bid going out in October originally. We got it out a little early, so I just submitted the final extension for that based off of what the contractors schedule is. So they like to have a confident reason for your extension. [2:03:48] Speaker F (unidentified): Could request an extension to June because that would be right after the vote, at which time we would know whether we had approval, or you could request a longer-term extension to cover both the vote, so sort of a milestone base both [2:04:04] Speaker A (unidentified): the vote and yeah, what you just said about milestones is the important [2:04:10] Speaker F (unidentified): component. We but I guess but I guess what I wanted to flush out is we already have voter approved and appropriated what in a best-case scenario for the small project would be the town's 10% responsibility. However, what I'm also hearing is that the town would have to front the entire cost of the project and rely on fema state and federal reimbursement for 90 percent of it. Yes, yeah, but the idea of an obligation maybe could be one of our triggers as to whether like we're not going to go forward with this unless we get their obligation. It's a little bit chicken and egg, but I don't know [2:04:51] Speaker D (unidentified): if it could play out that way. Yeah, so it can't play out that we don't go forward if we don't get obligation. That's very clearly stated in their rules that you can't make completing a project conditional upon getting the approval of fema. And then the other aspect is in order to get that approval we'll need a full design to have all the details of the plan of what the repairs are looking like in terms of time materials all that, so that they can cost estimate it and then go through the cost. Reasonableness processes that they go through to see if they will get to obligation. So that's going to be the step that we have to do next is getting that full design. You can go with design build from a contractor if that's the pathway that we want to go, there's some options there, or you can hire an engineer separately to do the design and then [2:05:47] Speaker F (unidentified): Saying that the voters would have to step up for with a sort of an unconditional commitment to an additional 800,000 approximately. Yeah, okay, that's what I wanted to flesh out. Yeah, and would you [2:05:58] Speaker C (unidentified): Imagine that comes from fund balance knowing that it might not, because why would we bond a project if we're actually already paid, we're going to get repaid for it. See wool, but we're talking about [2:06:10] Speaker H (unidentified): A much shorter time frame here. I wouldn't anticipate that coming from fund balance [2:06:14] Speaker A (unidentified): Because I don't think we have that money in fund balance to at least our initial productions. Yeah, especially if Tuesday passes, assuming Tuesday passes, we don't have we 800,000 [2:06:27] Speaker D (unidentified): For other, I mean, but that seems like a high number for generally what I've seen [2:06:36] Speaker A (unidentified): You guys do with. Yeah, but to get to the question of bond, yeah, then you run you run it so you could tax appropriate it or you could bond it and I mean those are kind of, you could bond it for a very short period of time, we could do a shorter payback schedule which would, yeah, which would reduce the interest payments and lower interest rate as well. And what do they expect usually a time [2:06:58] Speaker D (unidentified): Frame for a payback like within a year? There is not a standard one. Yeah, so when I have really small projects they come a lot quicker, usually they're coming within six months of the storm, the smaller repairs, things like that. It has only been two years since they changed the, it's large project threshold used to only be about 150,000, so anything over 150,000, but now with these small projects being so large and expensive, I mean a million dollar project can easily be any form of type of project that Could take two or more years to get done, and so we don't have that precedent yes yet to know with these larger end of the small projects how long payments will take, because typically before, they were smaller projects that didn't take a lot of details and engineering work and things like that, but now they potentially can be. [2:07:56] Speaker A (unidentified): Motion to have extension going well? Yeah. Nice work. Or sourcing stone. [2:08:02] Speaker F (unidentified): I'd just like to say, it's your plan and your recommendation, but I'm not supportive of 5.9 million, but the smaller amount, putting it before the voters is something I think. [2:08:13] Speaker A (unidentified): That is- At a minimum, yeah, at a minimum, I think there will be a question, but there will be a proposal put forward by me, so I would say at a minimum the lowest option that I can find is that, so if it goes higher than that would be something that would be discussed with the other three select board members and the two that are in the room if there's support for a five million dollar question or if we just leave it at one, it'll [2:08:35] Speaker D (unidentified): be one of the two, so yeah, and we put this in here, Peter and I talked about it, of putting highest case scenario for now, knowing that it needs to be something to be talked [2:08:48] Speaker L (unidentified): about at the site board level as well. [2:08:49] Speaker A (unidentified): So the question was asked about length, was that your question, Wayne? Quarter mile to the first stop point, half mile to the second stop point, so it's almost [2:08:58] Speaker D (unidentified): exactly half. Okay. So it would be a half mile total out and back. [2:09:02] Speaker A (unidentified): From the loop at the parking lot. From the parking lot. So that's counting the parts that are over Hartley Mason and the reading room as well. But it's a it's a quarter mile walk from parking by the restrooms there to the turnaround, it's probably an eighth of a mile to the reading room, another eighth of a mile after that, and then a half a mile further to get to the sewer pump station if that's the longest potential [2:09:24] Speaker L (unidentified): stop, and the 5.9 is for how much of it, the whole thing from the parking lot up to middle area where [2:09:30] Speaker A (unidentified): the sewer pump station is, half mile, so a million dollars for the first quarter mile and then the second quarter mile would be four million dollars, which is about where all the damage was, yeah, and [2:09:40] Speaker D (unidentified): because that has damage three to four times larger retaining wall as well as the walkway itself on that second half of it is all concrete on top of the bedrock versus the first half you're kind [2:09:56] Speaker L (unidentified): of up in the trees a little bit, so it's just major, and the fact that is if it's decided [2:10:05] Nicole: place to stop, you've that includes some of the most dramatic parts of it, because it's up high, it's got a steep drop-off, so as far as if it comes to a little better than nothing, at least that is a very attractive dramatic, and you're talking about with that overlook, that is a very dramatic part of the, yeah, so all [2:10:35] Speaker A (unidentified): All right, everyone's comfortable with a minimum, you know, a minimum project would be going forward, maybe a larger one, that'll be subject to further discussion if that happens. Okay. We are at 1218, 1220. I have down IT and planning, however, the planning one has several items that may invoke further discussion. Do we wanna wait on those and do them all at a future date? Yes. Okay, sounds good. [Speaker J (unidentified): Thank you, guys.] So adjourned at 1218.