← Back to MaineScanner

Durham Planning Board Tables Bowie Hill Subdivision Review Due to Wetland and Mapping Concerns

2026-11-04 · 2h 26m · Source: Planning Board Meeting ~ November 4, 2026 (Town of Durham, ME (YouTube))
Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[2:56] Speaker A (unidentified): Good to go anytime. All set. Yep. Okay everybody. [3:03] Juliet (Chair): Ready for some fun. Yep. All right, roll call. Myself, Juliet. Darren is now has been bumped up. Emotion work permanent member. Thank you very much for helping us out here. Appreciate that. And Alan Purrington, Brian Snippy Stick need not be here tonight. Just an administrative note, George, that the agenda, if we can just update that to take Sonny's name off, and oh yeah, change the studies. Sure. Pledge. [3:49] Speaker C (unidentified): Please. I pledge [3:55] Speaker D (unidentified): allegiance to the body of the United States of [3:58] Speaker E (unidentified): America and to the republic for which it stands, one nation under God, indivisible, with liberty and justice throughout. Thank you. Do [4:13] Juliet (Chair): we have any amendments to tonight's agenda? Seeing none, we'll move on to item number four, acceptance of the meeting minutes from the October 7th 2026 meeting. Has everybody had a chance to review the meeting? Any [4:42] Speaker C (unidentified): comments? I [4:48] Speaker D (unidentified): moved to accept the minutes from the October 7th meeting. Second. [4:55] Juliet (Chair): Second. All in favor? You good. Yeah, I wasn't here. Oh, okay. That passes. All right, information, no, item number five, informational exchange on non-agenda items, Mr. the Barge. [5:27] Speaker E (unidentified): Would you care to review your report with us? Yes, it did include my monthly report that goes to the town manager, and is copied to the select board. Recapping the October 7th meeting that you performed, as well as some follow-up work I've been doing from the last Interim Economic Development Committee meeting. The next meeting of that group will be on November 9th, which I think is next Monday. I've continued to do the artificial intelligence machine training for processing the applications and preparing the documents and minutes. Currently I'm just using the general ChatGPT but which the town provides, but I will be using an add-on called Codex which is much more systematic in processing the materials that we prepare for you. I have finally updated all of the applications on the website for the 2026 amendments. So those should all be current. I just finished this week the private way application. Now that you have jurisdiction, full jurisdiction over those plans, that now I have prepared an application that includes a checklist that will be available to applicants. [Juliet (Chair): And then finally,] Finally, Brian brought up the issue in the report about the historic commission, and there is currently a serious gap in the town's administrative capacity with the overhaul of the historic district commission and historic district provisions a couple of years ago. The then standing Historic District Commission, which was being retooled into an advisory group, they basically all resigned. And so the town has put out requests for people with certain qualifications, engineers, architects, historic preservationists. You really need to review those projects, someone with some level of expertise, which had been lacking in the past. So I offered to the plant, and at this point both the code officer and the Planning Board, if an application comes in for any of the eight properties in town that are on the National Register of Historic Places or any of the abutting properties to those, that group is supposed to give an advisory opinion on whether it conforms to the national guidelines for historic preservation to the code officer. And if you are reviewing a conditional use or subdivision application for those properties or the ones around them, then the Historic Commission is supposed to give you a recommendation, but there is no Historic Commission at this point. So I've offered a couple of draft options for amendments to the ordinance that would basically have the Planning Board fill in that capacity in the event that the Historic Commission cannot fulfill its duties, or just transfer over the full responsibility for historic preservation reviews to the Planning Board, and you would just do that as part of your normal review process. And if an application came in that the code officer needed assistance on, then you would give that advice to the code officer and recommendations. And we have, unlike the Planning Board, the Historic District Commission never had staff support. So I'm not an expert on historic preservation. However, I have been dealing with it for a long time. I was the manager for the City of Helena, Montana that had like 66 registered properties in three districts. So I'm very familiar with the program. And if need be, we can always consult with the main historic preservation commission, which we probably would do anyway. So that's an update in reviewing that you have already gone through your process of trying to prioritize what issues would be on your plate going up to the town meeting. So I did suggest to the town manager that because it's really an administrative issue for the town, for the town manager, that perhaps that could be dealt separately by the by the Select Board directly because Again, it's just simply fixing how the town is going to administratively process those applications that are in the ordinance, so I'd be happy to answer any questions. [10:12] Speaker F (unidentified): Based or not based, what about a third option being that any application that comes forward that needs review by a historic Commission or something like that goes to the third party engineer review? Sometimes they have historic people on staff, and that it would be the costs and would be born from the applicant, them knowing full well ahead of time, right, hey, you're going to need this. Just because, I think, you know, you brought this up, is not many people have this experience, and I mean, I have a little. Bit of it, but not, I know, I feel like we'd be doing it possibly a disservice, and that like if an applicant is, you know, applying to do something that triggers this. [11:10] Speaker G (unidentified): Then put it on them to go to third party. Yeah, my response to that is that it's, it would be good. [11:21] Speaker E (unidentified): However, the problem, I think, would be that you'd have to institute a whole fee structure to cover those costs, whereas at this point, if we keep it in the in the planning board with my assistance and relying upon the main historic preservation commission for the expertise, there's no charge to that as infrequently as we get it, so yeah, that would require, well, the MHPC. [11:45] Speaker F (unidentified): Help us for free, like the Maine historic preservation. Yes, Maine historic preservation. [11:51] Speaker E (unidentified): Commission offers advice on applications, and they certainly are qualified. Yeah, oh yeah. [11:57] Speaker G (unidentified): They're the ones that make the determination. I didn't know that they would help. Yeah, okay, and. [12:01] Speaker E (unidentified): Again, we haven't had one in two years, so the likelihood is pretty limited. There was a subdivision, the Wingate subdivision on Laurelsboro Road, that was adjacent to one of those properties, and so they would, they offered to assist on that, so yeah, I think it'll be covered. Main thing is right now having a way if an application comes in, they're not stuck because the town doesn't have a store commission. Yeah, we have to fix that. Okay, all right, but that was a good. [12:30] Speaker F (unidentified): Suggestion. Yeah, just a thought, like we shouldn't have to, like, you know, you. [12:37] Speaker E (unidentified): Know, make something, not make something up, but we don't. Well, the standards are somewhat subjective, and that's part of the. [12:42] Juliet (Chair): Difficulty with it. Yeah, I mean, yeah, okay, thank you. So right now we don't know if it's going to be a land use ordinance update or if the select board is going to manage it, would have to be an update. [12:53] Speaker E (unidentified): To the ordinance, but I'm suggesting that the select board deal with that as opposed to you or the agriculture committee is dealing with agriculture. You're dealing with three other big policy issues, and this is really not a big policy issue. It's more of an administrative issue for the for the town code officer. And so you go directly to the select. Now obviously they're going to refer it to you for review, but I didn't put it on your plate because you went through your whole process and that wasn't on it. [13:25] Juliet (Chair): Right, so this is something that could be added to our list for our new sub dates. It would be added as a warrant article. Yeah, okay. And when you say applicant, from what I recall when all this went on, there was some ambiguity with the code enforcement officer and as far as what kicks off a review of a historic a renovation to a historic. Or can they, if they have to fix some siding, or if the porch is falling apart and they need to put up new columns, there would seem to be a fuzzy area there as to when we would, or it needs to be reviewed by somebody other than the CEO. [14:18] Speaker E (unidentified): Yeah, there was confusion. And part of the issue was the historic district commission process was just fly by night. It didn't really have a good set of procedures or standards, and you know they would review an application once a year at most, and they didn't really have to. That's part of the benefit of doing with the planning board because you have this process already set up, you already have staff assistance, and we will refer if we need assistance. So hopefully the what was done in 2024, I think it was, that we adopted that overhaul has kind of streamlined the whole system down to something [14:59] Juliet (Chair): that's much more workable. Yeah, it was 2024. So I guess it's still up to the CEO to determine whether or not it should go any. Yeah, and any further than his permitting requirements. Yeah, [15:12] Speaker E (unidentified): and the reality is it's it starts on his desk anyway, right, because they apply for a billing [15:17] Juliet (Chair): permit and he has to look at that. Okay, but if any subdivision comes up that's adjacent to any of these properties, that's when automatically comes here. Yeah, it would be. I would need to [15:32] Speaker C (unidentified): determine that. All right, any [15:38] Juliet (Chair): Comments on that feel kind of clear. It's been a while. It's been And that was before your time. OK. Anything else to add, George? No, I'm good. All right. 5b, any informational exchange on non-agenda items from any residents of the town of Durham? Seeing none. Any informational exchange on non-agenda items from any non-residents of the town of Durham? Check. Okay. Item number six, continuing business, 6A, substantive review of Bowie Hill subdivision phase two, preliminary subdivision plan application, Maddie Lane, not 10, 138, public comment will not be taken. George, would you like to review your notes? [16:50] Speaker E (unidentified): Yes i will summarize those for the board in terms of the public the board determined the application to be complete on october 7th and you have granted you did ask the applicant to bring in additional information to address some of the specific issues related to tree clearing weathering and wetland potential wetland filling the board did provide a supplemental packet of information on October 6th and then they also provided some additional information on October 21st and then finally on October 26 they had a phase 1 analysis and then just today I received a updated figure 2 and so one of the issues for the board to discuss and decide is whether you will admit any of that information that came in after the 14-day deadline before the meeting I do think some of it is really important and relevant to trying to sort through what exactly is on the ground out there to help you decide whether you can move forward with the preliminary approval or not and so again but technically under the product policy that was you enacted a few months ago yeah the 14-day deadline you have the discretionary authority to consider something but you have to determine that there's an extenuating circumstance that warrants admission of that information because you don't have an opportunity to review it well in advance I don't have time to opportunity to process it and get the packet out to meet the deadlines for publication so I think pretty much where this is going is you're going to ask the peer Reviewer to review a lot more than you normally do. Typically it's just the engineering plans to make sure they follow standard practice. In the past few months, few applications you've asked them to look at the building envelopes in detail because some of them have been very questionable. And so in this particular instance, I think we're looking at looking at trying to determine exactly how much street clearing has occurred in both phases one and phase two and make sure that correlates with the calculations for stormwater management and phosphorus management because that's one of the issues with the amount of clearing that's done. One of the ways to limit the generation of stormwater pollutants and phosphorus is through vegetative buffering, through woods or buffer strips. So that is probably most important to be addressed through that calculation process of the size of the filtration basins, as opposed to having an ordinance-specified limit on how much tree clearing you can do on these cluster lots. There is no specification in the ordinance. The 20% rule that is sometimes applied, I think, is intended to say the stormwater treatment and phosphorus treatment systems are designed for this capacity based on no more than 20,000 square feet being cleared on the lots. So the applicant and his, for some reason the consultant thought that it was a 20 percent limit, and so you saw in the diagram that was submitted as part of the preliminary updated preliminary plan application, some of these building envelopes on there were as small as around 9,000 square feet. So that's just not realistic and it's not required. So the applicant has been working to retool everything and they did a drone, some drone analysis to try to determine exactly how much clearing has been done, and we still have the issue of the fact that the lots in phase two were cleared prior to any preliminary or final approval, so that is an ongoing issue for the board to try and deal with as we go forward in the process. The applicant in his most recent submissions indicated that there are additional lots in phase one that have had wetland filling without permits, and they've indicated that they intend to get in touch with the DEP as well as the code enforcement officer to try to resolve those apparent wetland alteration without permit violations. I did speak with the code officer today and he said he was not aware of that yet. So he has not been notified of that potential issue. There was lot 13 as I understand it and Mr Vernon can clarify for the record when he comes up what the status was of I think it's lot 13. Now I think that's the one where you had to adjust the rear lot line because the building was pushed farther back and didn't meet the setback and there. And there must have been some fill associated with that infringed upon some wetlands. As I said, I think it's important that the peer reviewer really drill down deep on this application because of the inconsistencies. Just the issue of the verification of the drone analysis, which has accuracies of plus or minus 10% and plus or minus five feet. So I think it's important that the peer reviewer take a look at that and determine whether the analysis that's been done is of adequate accuracy for the purposes of the stormwater management plan. In you did entertain the potential waiver on the road width from phase one which is 20 feet continuing that instead of the 24 feet into phase two which you seem to be in accepting that doesn't make sense to make the wider road beyond the narrow road but you'll have to include that in your decision you're making. So at this point, I did include in the packet enough information, including some draft preliminary plan approval conditions that I attempted with AI assistance to address all of those issues in the draft preliminary approval conditions that are in your packet to really give enough specificity to make sure that any preliminary approval you give doesn't approve anything in related to the violations or anything of that nature. It'll just enable they have to process to move on to the final plan stage which they had previously had a preliminary approval and lapsed. So I think the important thing at this point is to move forward as expeditiously as possible for the town's sake as well as the applicant and as I said I did have do have draft and I also have a draft motion if you determine that you're prepared to move forward with the preliminary approval based on those conditions approval conditions as you may choose to amend them or not if you're not comfortable that the applicant has met The due burden of proof to convince you that their project can meet the standards, and you just don't feel it's ready to be reviewed under the current ordinance, then you have that option as well to table it and tell the applicant to come back when they resolve certain issues that [24:30] Juliet (Chair): you might raise tonight. Thank you. Okay, before we dive into it, just getting back to some information that was submitted after the deadline, right? You know, we made an effort to change our deadlines to accommodate some administrative tasks, yet I think we need to stick with that. I think we need to be sick with it and maintain consistency through all of these future and current applications. So I mean, anything that was received after the 21st we should not be reviewing or discussing at this point, is everybody okay with that? [25:17] Speaker F (unidentified): Yeah. And what you're saying is the 21st is 14 days and that's what our ordinance states. [25:23] Speaker G (unidentified): Yes. That's that cutoff for 14. [25:25] Juliet (Chair): Right. And then there's some supplemental information that was submitted on the 26th and it sounds like even more as recent as today. [25:35] Speaker E (unidentified): Yeah. Just to clarify, I had made a suggestion that what you're looking at now is not even what the applicant is proposing in terms of that diagram showing those 20% [Juliet (Chair): clearing limitations.] So I did suggest if you get into it tonight, it might be helpful for the board. You can actually see on the on that air photo, the dark shadow areas are pretty much the cleared areas. That's the shadows of the trees within those areas. But again, it's not clear either from the drone footage or from the particularly from the green indications there what they are proposing, so I did suggest to the applicant that he might want to come in tonight and have some diagram that shows what he's actually, what they're actually proposing. But again, if you feel that was not submitted within a time and timely manner, you have every discretionary authority to say we're not going to look at that tonight, might come back next month. I [26:37] Speaker F (unidentified): have a recommendation if I could just get right into it. I agree with you. I do think, and I don't know if we need a vote right now, I think we should stick with our required timelines needed of submitted materials before meetings just to give everybody time to review, and I don't think it's fair for others applications that do stick to those, so I think that is a thing we should stick with. I don't know if we need [27:06] Juliet (Chair): to vote on that or not, guys. Okay, hold on, let's let the board comment on this first, please. [27:18] Speaker D (unidentified): What do you think about that? I agree with enforcing the timeline, but I would like to have the applicants input on why something was late. Not that would be justification, but it would be an education for us if we need to enhance anything. We that's fair impose out there, but I agree with right now that's what we have, we should enforce it. [27:49] Juliet (Chair): Thank you. No, I think that's that's why that is fair. Yeah, it's they put it out there. We can ask the applicant to give us commentary on it, but yeah, we'll leave it at that. [28:05] Speaker F (unidentified): And then further I would I would like to say that there's a lot of things that are changing here, a lot of things that aren't complete. I think we need to back up and kind of go through what is needed to fully review this project. I think we're getting ready if we haven't yet to send this to the third party reviewer, but we can't yet. Like these materials are not are not complete, not done. I mean maybe they're complete but they're not accurate. We really need accurate submittals and I don't know if the applicant is confused as to what we're looking for and when. So maybe it would be helpful to like literally go through line by line what we are looking for, what we need, whether it's like the coverage of the tree clearing, wetland delineation which I'll speak about in a second, DP response, stormwater, all of those things that we need that need to be accurate and updated and sent in within 14 business days of the next meeting. That's my recommendation is that we don't even really get into like the site plan beyond explaining what we need to see on certain things. Yeah, one of one of the things [29:37] Speaker D (unidentified): that certainly concerns me is when I'm hearing that there were related to phase one, there were wetland alterations performed and we're still waiting for information from DEP about that. How until I would see DEP's analysis of [29:55] Juliet (Chair): that, how can we even proceed to phase two? Exactly. Yeah, great comments. So we have doing the application complete. Okay, I said complete, I didn't mean that word, I'm sorry. [30:10] Speaker F (unidentified): I know you guys did that 's right. So now we're into accurate might be the more the word I was I needed to use, not complete, accurate. The app the materials need to [30:24] Juliet (Chair): be accurate. Gotcha, okay. Yeah, instead of complete, right. So we can get into that. Would you prefer I think we should have the applicant hear from them and yes, we'll hear from you. Yeah, and then we can get into I think as the conversation moves along we'll determine what's deficient. This means just a barge to keep great notes. [30:56] Charlie Burnham: You ready for me? I'm Charlie Burnham, I'm the engineer, I'm representing John, he's not here tonight. See if I can attack these all in a row in terms of the timeliness. I think George mentioned it kind of briefly that if there's an extenuating circumstance, and I think when we looked at completeness and looked at the things that were provided, the request came during the last planning board. It wasn't like there was an outstanding ordinance that I missed and didn't go back, it was, it was a request to help clarify what it actually there and do a out of out of scope kind of assessment of what's been done out there, and the fact that we were able to get a drone survey done and do the best we could. I think the other figures George was a better job of, I went and traced out the actual tree limits as best I could by zooming in, the photo is actually super high definition so I can zoom in and it still stays very clear, so I did the best I could to kind of trace out where the trees were, where the trees aren't. As far as the wetlands on phase one, those are those are things that we self-reported to the DEP when I walked out there, because John is having a problem with the driveway, I noticed it, and part of the reason it got hit is because of that old townhouse that was there. Remember that during phase one there was a historical building, they came in and demoed that, and when they came in and demoed it that was their access way, and so they didn't punch off of Bowie Hill again, they came down that driveway and zipped right through to the left there through those wetlands, so it was like a logging trail that they had used for demo, and so it became less and less identifiable as wetlands. So when John came in or whoever the site guy was, they didn't see the delineations and they just went right through it. We came, we pulled back all that fill, we called the DEP, we told what we had done, and because we had the DEP permit coming through they said, you know what, just put it all in with that one packet, we'll review it all at once, it's not, it doesn't hit the threshold of mitigation or any of that, it's not a huge area, and once, and then we did mitigate it, so we're like, we pulled it back. So I don't even know if it 's kind of like this weird area, like I don't think it counts as wetland impact because you hit it, you pulled it back, you restored it before they even saw it, we told them about it and they're like, it's restored. So the other part was that other finger there that we caught during The drone surveys we had to update that see that little slit that finger that comes up and in there where on lot over once it was 13 is it 12 George I'll be 12 oh laser this is why he gets the intro music this is what he's got the gadgets kids. And I guess while he's doing that, about phase two clearing, what they've done is they logged the road. And what we did in the very beginning is we walked this property and found the logging roads. And we located our roads along those as best we could while meeting the geometry that we had to. Which is why, like you see where our wetlands are right there, we cross it on phase two. That's why it's split there, because that road was already built up as part of a logging crossing. So everything we've done has always been to mitigate our environmental impact, has always been to be a net zero subdivision. And the irony is, to do subdivisions well and to do them to this scale, you actually don't make a lot of money, right? [34:12] Speaker A (unidentified): There is a rental fee. [34:14] Charlie Burnham: There is, see, I just told you I'll make a lot of money on these, so. So this is the one, there's that little figure there. They went, they pushed right into that. [34:24] Speaker F (unidentified): You mentioned there was a new wetland that was found? Or new identified? [34:30] Charlie Burnham: So this is the part that we restored and reported, the number 13, I think. And then this is the part that we noticed when we did our recent drone survey that we had to go in. I amended it three weeks ago when I was doing all this. So there was a lot to do in the last three weeks just to try to get to this point of being like, okay, yep, we did hit some more wetlands. Again, we're still below the threshold of wetland impacts because throughout this whole thing, we haven't touched any. And again, that was always our intention. Was to make this thing as minimum impact as you possibly could as you can see there's an enormous amount of open space in this thing compared to what we've put out there we certainly didn't squeeze everything we could out of it and that was always John's intention is to do it well and to do it right and that leads me to the phase two clearings they didn't log and they didn't stump anything outside the right-of-way and cutting down trees as far as the DEP is concerned isn't disturbance like once You start disturbing the soil and filling things like now you started to mess with how water flows, but just clearing trees actually isn't considered disturbance as far as they're concerned. So part of our idea or part of the vision for the subdivision is, like I said, these net zero houses. In order to do that you need solar, so some of the taller trees were cut to and will allow. And that's kind of the discussion I'd like to have tonight is George's right. I very quickly threw, I initially had 20 000 square feet on there. I read something that threw me to 20, so then I updated the table, slimmed them down, and then obviously last meeting's conversation, okay maybe just 20 000. So we went back and we amended that, and then I went and did an analysis on phase one of how much outside of 20 000 do we do. And I think if you were to see that, I don't know if that made it to you guys, the only ones that were above 20 000 are the two, the three that we combined. So the total allocation that we had for phase one is less than or equal to what we had asked. And on top of that, when we talk about our storm water modeling, the way I designate the areas in areas inside of our sub, our developed area or our new Lots, is I model them as one acre Lots. And in the hydrocard model that assumes 20 impervious and 100 clearing, that means it you stripped it down to the, it's grass and 20 impervious. So obviously all of those storm water numbers are extraordinarily conservative again when we talk about forested buffers and that is what provides a great amount of treatment. Every one of these lots is located along a rate that road's a ridge, and everything slopes away gradually. So all those trees out behind it, the wetlands that will that we're always trying to make fake ones of to treat the road, surround this thing treating every drop of water that comes out of it to a exorbitant amount. So I just want to make sure the picture is painted correctly. This John is not a land ravaging developer. He tried to do it right. He's trying to do it by the books. The reason he lost the forest when he could was to get out of the bat season, right, like every step of the way he was hoping again. And that's on me and dep, just the back and forth and very long story. But the reality is John's always wanted to do it right, and it's kind of nice he's not here that I can say nice things about him. He won't ever hear him, but it's recorded. Yeah, he's, he won't watch it. Leave that out of the minutes. So again the reality is this Subdivision's intention has always been to be environmentally friendly and to and to leave his little impact when we pull this thing back off that Bowie Hill Road 100 feet further than we had to just to give it that rural field to keep it keep it buffered keep it secluded from the neighbors and yeah I just want to make sure the picture is printed properly and there's a there's a part [38:15] Juliet (Chair): Of the submission that was after the 21st no this is this is his submission the ones after are [38:20] Charlie Burnham: Cleaner I went and traced each line because I thought you wanted me to show you what I had proposed versus what's happened and George was right like it just didn't look it didn't communicate what we were trying to communicate clearly so then I went for a second figure year and traced out all the tree limits calculated the areas that have been cleared for each of the first phase and for the second phase to the best of my ability and then again from a stormwater modeling standpoint and a Phosphorus modeling standpoint we've been extraordinarily conservative [38:48] Juliet (Chair): Across the board can you talk about lot seven that's right there in the middle of the screen that's clearly been altered beyond the limits of the wetlands yeah [39:03] Speaker D (unidentified): Were you aware of that no [39:06] Charlie Burnham: The house is looks like it's actually I yeah the road look at the center of the road the whole thing could probably be shifted the picture could probably be shifted 10 feet to the South on this one if you look at the other yeah the other figures are better this one was bigger a bigger aerial fit to a larger area the other one I did smaller aerials that you're saying there's no wetland filling on lot seven I'm not saying that I'm saying it's it's not as bad as it looks right there and I on the Second drawing I did I don't remember having any in that this that figure one and figure two [39:44] Speaker F (unidentified): I have a recommendation Brian for us next steps here I 've written down three things that I think are the biggest topics that we need to get squared away way one tree clearing what to do with that what we need to see for that second is wetlands what we need to see with that and the third is DP response or DP generally I that's what I'm hearing are the kind of like the three big topic issues there's other things that to talk about but those are the three really big ones maybe if we go through Each one and discuss what we're looking for and the concerns questions we have. I think that might wrap a lot of things up as far as next steps. Okay, what do you all think? Is there anything else besides those three items, wetlands, tree clearing, and DEP, or not enforcement, but DEP. Anything else? [40:48] Speaker D (unidentified): No, I think those are the dominant ones which we've been discussing. [40:52] Speaker E (unidentified): DEP permitting probably. [40:54] Speaker F (unidentified): Yeah, that's good. DEP permitting. Okay, great. And if I could, I would like to recommend that we do tree clearing at the end and we hit wetlands first and then DEP and then and then what we need to see for tree clearing or whatever it doesn't matter I guess. I was just I think tree clearing is big really broad and then I can start that. [41:25] Juliet (Chair): Sharon you okay with that? Yeah. All right. Yep. [41:27] Speaker F (unidentified): For the wetlands one thing I would like to recommend to the board to think about is that the wetland delineation that was completed for this project that was submitted for phase two or at least referenced is from more than five years ago which pretty much makes it invalid. What was the year? 21, I believe. I think it's July of 21 or something of 21. In addition, phase one was complete after this wetland delineation was done and it has changed the environment quite a bit in such that hydrology could have changed and thus that wetland delineation that was completed before phase one is not accurate anymore. So with both of those things being said, I think it would be best if there is a new delineation completed for at least phase two, and that is done by an outside party, third party. [42:40] Charlie Burnham: Oh, and I can't do that. [42:42] Speaker F (unidentified): I have I have heard that because of the weather we've been having it's still you can still have this done this year a delineation yeah is that what you meant no you said third party I [42:57] Charlie Burnham: think I think you guys hire them like I'd hire oh just John doesn't do it no I think the [43:04] Speaker E (unidentified): proper way to do that is have them do the delineation and have Gold Palm do a peer review [43:08] Speaker G (unidentified): of it including field and investigation if necessary yeah however we want to work [43:14] Speaker F (unidentified): that out it's fine but just that's our third party yeah and then have someone check it I guess would be is that what you're saying yeah we review that yeah sure just like everything yeah [43:25] Charlie Burnham: sure where do you pull up what's the five years based on are we is this it's it's a [43:33] Speaker F (unidentified): I think it's what the state relies on again [43:41] Speaker E (unidentified): That could be a peer review issue, is that wetland, that'd be nice, is that delineation valid, either from outdated or because of alterations to the hydrology? Yeah,. [43:59] Charlie Burnham: So I think, I think the only wetland thing that is, it's like a, if I had an Army Corps jurisdictional assessment made, which we didn't have to do, we expire that like determination last five years, but wetland reports. [44:16] Speaker F (unidentified): I think when the DP is looking at your application, because one of the concerns is that one of these wetlands was crossed with the road that, with the phase two, that wetland does not end where the old delineation said it did. So that is one of the concerns that came up. [44:42] Charlie Burnham: If a second one came back, I promise you that I couldn't see anything there now. [44:47] Speaker F (unidentified): No,. But you can still see hydraulic, you can still see certain bits. I'm just saying this came from the Conservation Commission and out in the field, it was somewhat, you know. [44:57] Charlie Burnham: Okay, you got it. Yeah. Yeah, if we could ask the third party your path to verify the validity of a wetlands survey, that'd be awesome. Yeah, I appreciate that. [45:08] Juliet (Chair): Okay, so that's what I'm hearing is instead of being proactive and having a delineation done before it goes to the third party reviewer up here, a peer review, we're going to send everything to the peer reviewer, ask them if they think the information isn't accurate, if they say no, then. [45:27] Charlie Burnham: Then it just prolongs the process, is that, I think we could send me two sentences, what is the, what is, how long do you, how long do you consider wetland delineations? Yeah, I think it's two questions. Yeah. [45:40] Speaker F (unidentified): Like I hope they can get back to that. Yeah, and see what world Palmer says. Yeah, but again, I don't. [45:45] Speaker E (unidentified): Think we're talking about having this piecemeal peer review. No, sure, no,, package goes. [45:51] Speaker F (unidentified): Today, 100. Yeah, but I'm, I'm waiting to get there. Sure, like we're still right early. I'm just, I'm. [45:57] Charlie Burnham: Looking out for John's best interest to send to spend several thousand dollars to send a wetland scientist out there to do something that's been done that might not, that's worth, that's worth an email, it might, if we could maybe some spot checks are recommended, sure, whatever. Yeah, whatever our. [46:10] Speaker F (unidentified): Third party thinks this is over five years old and this whole phase one was built around these wetlands, which could absolutely change hydrology in this area, so both of those two things together, if Goral Palmer thinks that, you know, just keep going, then that's okay. So yeah. [46:31] Juliet (Chair): Prior to the full package going to the peer review, we're going to get a determination from. [46:36] Speaker E (unidentified): Them? No. No. Get an email. Send an email. Send the whole package to them. Whatever you want peer reviewed. And again, you can have the peer review of whatever parts of this you want done before you need preliminary approval or as a condition of preliminary approval. You have either option. If you're if you're so concerned with the accuracy of the submissions, then you can have that reviewed by the peer reviewer before you make any decision. But I think what we decided [47:07] Speaker F (unidentified): here is that we would send Girl Plumber third party reviewer a couple questions whether or not they think that the current delineation is accurate and something we should rely on. I'm going [47:16] Speaker E (unidentified): to back up from what I said earlier. I think what you if you're saying you don't want to even give this a preliminary approval until these issues are resolved, then I think the track that you're on. Yeah, these three issues I would recommend doing a peer review of those limited issues, and then once you get beyond this, then they just check all the other stuff. [47:41] Speaker F (unidentified): Yeah, I'm just trying to speed this up as far as fast as possible for the applicant, knowing it's November, and if we could just get an answer on this delineation question, if it needs it, you guys can get it done for the end of the year. If it doesn't need it, fine. Well, I guess that's the hard [47:57] Charlie Burnham: part is if we're truly trying to speed things along for the applicant, the DP thing's always something that's kind of a condition upon final approval. You know, that's that's pretty standard. I think you guys have all done that for us at least, I think, on every product I've ever done with y'all. The wetland delineation question again, I think you're right, it's a two-sentence confirmation email that I feel okay about, and I if we could do conditional approval based on that response, I think that's very fair. And the tree clearing limits again, I think when we talk about wetland delineations and wetland impacts, that's a conversation with the DEP, and again if they bless everything we've done up there and we're up front with them like we've tried to be, I think their blessing kind of also checks that box, right? So really the last big item is the tree clearing limits on phase two, which I think isn't something that is, I think the what we have right now to discuss that would be beneficial is what we Can what you guys want to see for developed areas back there, because again, the areas that have been cut are not disturbed and will quickly re-vegetate and be back to unimpacted low growth shrubs to still allow for solar feasibility out there, not feasibility viability. And I think that it is the forest through the trees is what we're actually going to have out there at the end is not a ravaged stripped parcel like it might seem. I think he tried to stay inside, I don't know. I don't know. But nothing, no damage has, in my opinion, been done yet. There hasn't been any environmental catastrophe out there at this stage. The wetland, the crossing there, like I said, has existed for 40 years. It was a logging road that we tried to follow. And that's why the wetlands split there to begin with. That's why we put the road there to begin with, was to not touch wetlands. So I just want to make sure that we are all super. [49:57] Speaker F (unidentified): Can I just say one thing? I hear you when you're saying you're trying to avoid wetlands, but we just mentioned there's three lots on your previous ones. I had nothing to do with those. I'm just saying, what you're talking is that the way you guys are building this is to avoid, but that's not what we're seeing on what's already been built. [50:15] Charlie Burnham: On the microscale, there's different players at part, right? There's site guys who don't know and there's mistakes that are made throughout every building. [50:21] Speaker F (unidentified): Can you blame us when we're kind of... [50:22] Charlie Burnham: I'm not, but I just want to make sure the picture is correct, because you are painting that is one way of looking at it, but I think you're pointing the fingers at the wrong people and [50:28] Speaker F (unidentified): I'm not pointing any fingers at all. I'm trying to do our due diligence. I hear you, I hear you. [50:32] Charlie Burnham: And I just want you to know that what side the developer has always been on and continues to be on, and I won't, I just am scared that there's that there's a sinister story at work that's just not true. It's just not true. He's been so good the whole way through. [50:48] Speaker E (unidentified): But ultimately, the developer is responsible for everything that happens within their project. [50:54] Charlie Burnham: Totally. And I can trust you every development in the neighborhood is similar. [50:58] Speaker F (unidentified): Brian, if we could just pause here for a second. I just want to back up. I do not feel comfortable myself approving a preliminary plan at this stage, even with conditions. I do not feel comfortable because the biggest thing here is that all of this is going to go to our third-party reviewer. Why would we submit all of this and have that wasted time and money when it's not at least up to my view not accurate yet? Why would we do that? [51:29] Charlie Burnham: This isn't outdated figures. This isn't a good look, and it's too bad you guys said we couldn't look at New York figures because they are just pictures. They just paint a different picture. [51:40] Speaker F (unidentified): So back to the three things that we were talking about, the wetlands, I am recommending a new delineation, but we'll talk to Boral Palmer. Also regarding the wetlands is the potential for impact to already existing wetlands from phase two work. You said that you had only grubbed trees within the road right of way, but we have pictures from sidewalk. It does appear that there was quite a bit of grubbing outside of the road right of way, so I don't know if that's [52:19] Charlie Burnham: true. I have, I've been told by the forester and everybody that the only part that was grubbed was, and again it's dry sandy soil there, so you dig it, you drive on it, and it looks, it's not like it's thickly forested. You guys all walked in, we walked in beforehand, it's very lightly forested old growth wooded area, so you cut down one tree and 50 feet around it all look [52:43] Speaker F (unidentified): open. Right, so I wonder if the new delineation can be done and then Goral Palmer approves it and then maybe DP or something to do with DP comes out. I think you mentioned you want a DP to come [53:02] Charlie Burnham: out, look at the site, right, the DEP permitting process that I've invited them out, they haven't [53:07] Juliet (Chair): shown any interest yet. Okay, yeah, in the package here it stated that the desire was to have the CEO and DEP out of the site before tonight's meeting, and apparently that's never happened. George, can you zoom out to see more of phase two, please? [53:34] Speaker C (unidentified): Not enough? Yeah, I think so. [53:38] Juliet (Chair): You know, the other point I'd like to make is with a cluster subdivision, there are certain aspects of the building envelope that need to be considered, and wetlands, steep slopes, rock outcroppings. It's tough to tell, but it looks like some of the building envelope might encroach in some of those areas. So in addition to your list, Juliet, it yep I think it'd be nice to see a picture tells a thousand words, right, but an updated plan, that site plan, that kind of outlines the proposed building envelope. [54:39] Charlie Burnham: The 20,000 square feet, if you will, I hope you guys can kind of tell us what number we wanted there. I mean, I'm not going to tell you that, okay, no, there's no, okay, we the definitions for. [54:50] Juliet (Chair): Cluster, the definitions of a building envelope and a cluster subdivision are black and white, and it tells you in our land use ordinance what can and cannot be within that building envelope. So looking at this, it looks like some of your lots impede. [55:14] Charlie Burnham: Are you done with the green or the, this is such a bad figure, the green is your building envelope, right, it was like conceptual, like where we could fit them, it wasn't again, once you sell the lots you don't have, I mean, I can't tell them where to put their driveway, it was kind of like hey these lots are built there, that's all that, and then I showed it was honestly like staggering the driveways, seeing them driveways coming into each other's driveways, that's always nice, right, so you can see these. Drivers are all as offset as we can. [55:42] Speaker E (unidentified): The ordinance says the final plan has to have clearing limits on it, yeah, do those clear in your revised one which the board isn't looking at tonight. Another thing to check is you've shown the cleared areas as they've been cleared, are any of the septic system test pits outside of those cleared areas, and have the storm water basins, are they included in those calculations, because one of them looks like it has still trees in it on this image for sure, again this. [56:14] Charlie Burnham: This whole image is pushed too far to the north, [56:17] Speaker I (unidentified): or whatever direction it is, west. [56:20] Speaker E (unidentified): So when you do whatever you're gonna do, you need to look at where the septic systems are located and make sure that they're in those clearing areas that you're proposing. [56:30] Charlie Burnham: Yeah, they've given us kind of a blanket. All the test bits in this area are the same. [56:42] Speaker D (unidentified): Very consistent hydrological site. [56:46] Juliet (Chair): I don't think we're saying anything was malicious. No, but somebody is not paying attention to what's happening on phase one, and like George said, it's up to the developer to police that, and we just want to, there's been some site alterations done obviously on phase two, and to Juliet's point, you know, we want to. [57:14] Charlie Burnham: But this is the precedent we're setting now, right, every second phase that comes through you, they got to go back and we got to check every clearing limit, and that's it, well ultimately. [57:23] Juliet (Chair): None of it should have been cleared for sure, for sure. No, I understand, it's just I've never done [57:29] Speaker D (unidentified): this before, I've never done this before, but when you, when you have some wetland alterations from phase one, it gives you concern when you're looking at phase two. The wetlands reported them, I mean [57:42] Charlie Burnham: that's the only reason this even came about. Besides, if he hadn't logged phase two, if he left phase two alone, log phase one would have never been discussed, and never is, in every subdivision I've ever been a part of. You never go back and look at, once the lots are sold, it's the, it's always, it's, it's just how the industry's always done it. I don't, I don't think it's right [58:00] Speaker E (unidentified): or wrong. He doesn't consider cumulative impacts when they do site location. They're [58:08] Charlie Burnham: not going to go back and check your, they're not going to have you do a chain review the holes, but they're not going to ask you to do a day of drone survey and get you what's out there. They're going to look at, they're going to go walk it, they're not going to go and check your delineate delineations and see your clearing unless they see issues, unless they see issues, which this board [58:27] Speaker D (unidentified): has seen issues because we told them. Well, and that's, that's what you should. I know it is, but [58:33] Charlie Burnham: I'm just saying this isn't came from the sidewalk, this isn't a precedent that any other subdivision has. Oh yeah, I'm fine with it, I think it's the right thing to do, don't get me wrong, it's just a [58:42] Speaker D (unidentified): So it's different. When you've been forthcoming on something that has been altered, it begs the question. It does. [58:52] Speaker F (unidentified): Okay, so let's get back to kind of the list of things that we need. We started with wetlands, talked about potential of a new delineation. And then there's some things that cross over into the DP as far as like the wetland fill. Anything else regarding the wetlands that we want to talk about specifically, any questions or concerns or needs? I think we've addressed them. Yeah, I think so too. Okay, great, so that was the wetlands piece. Now, let's talk about DEP. So, this is my recommendation. I would like to hear from them. I'm sure you would, too. I would like to hear from them on the, let's see here. Are they, 're not reviewing the violation with the trees. [59:53] Charlie Burnham: Yes, they are. They've been notified of that. [59:57] Speaker F (unidentified): Of the tree clearing? Yes. [59:59] Speaker E (unidentified): Prior to site location approval, I assume. Yeah. Okay. [1:00:01] Charlie Burnham: It's all underneath the site location. All the wetland impacts, all the tree clearing. [1:00:05] Speaker F (unidentified): Okay. So tree clearing, they are looking at. Right. Okay. So tree clearing, I want to hear them what they say about that. I do want to hear about wetland impacts, but the new delineation might change that. So we'll keep a pin in that and see what Goro Palmer comes back with. And then the other thing is phase one wetland fill. So it sounds like you did alert them to that. Yep. So it would be, it'd be good to hear, I'd like to hear what they said, say about that. So phase one wetland fill, and are we have a condition that they need a slow to a site law, like we can give the permit with a condition that the site law is received, or you can give a preliminary approval [1:00:58] Speaker E (unidentified): approval but the final approval is supposed to have your DEP if they need to sign a location permit they 're supposed to submit that as part of their application so we they need that [1:01:08] Speaker F (unidentified): before that, right? Okay. Yeah, for final, right? Okay. So maybe, you know, a status update on their [1:01:15] Charlie Burnham: review of that. Hopefully we'll have, I mean, hopefully we'll have it, obviously, by final. But yeah, that's kind of what I'm getting at. Like a lot of this stuff, a lot of our concerns sit in the DP's hands, and once they come back and say this is fine, or not finding what we want you to do to fix it, I think that's where our authority, that's, that's the best we can do, right? Oh yeah,. But I think that one document, I think can put, I mean, they're gonna, like you said, if it's their wetland delineations that they're asking about, they'll say the same. They'll, if it's been five years and that's their concern, then that's right, they'll flag that too. So like a lot of the concerns that we've just raised all hinge on that DEP approval. So if there's a condition that hey, you guys don't get final approval until you get this DEP approval, that has all three of these concerns met, I feel like that one condition takes care of everything. You might, if I'm wrong, and maybe I'm missing something, but I feel like that other than sending pieces to the third parties and seeing, getting all these opinions, I think DEP's opinion is the opinion we care about, in my opinion, right? If they, if we satisfy by aside from performance standards of the towns, which again, I think from an engineering standpoint, those really lie on the road standard, and which we've asked the 20-foot waiver. So again, and then, I guess, part of the worst part for me is that we've gotten preliminary approval on this project before, and it was just a matter of that debauchery that just set us all the way back to like not even thinking this project's even close. So in my mind I was like oh great okay we'll just resubmit again we'll get our dep approval and then we're ready for final because that was the original conditions on the prelim that we first had and so that's what I was hoping we were stepping back into and this right and so doing the best we can to communicate everything we can to the dep but I do still believe that dep approval answered a lot of your big concerns and just to reiterate [1:03:10] Juliet (Chair): reiterate this point we can't provide final approval if there are any outstanding violations [1:03:17] Charlie Burnham: right we still got a long ways to go with people blessing this but from a your ordinance and what you guys are asking for on phase two aside from the violations right which is again on approvals rather than on preliminary I [1:03:34] Speaker F (unidentified): feel like the project meets that part well no so sort of but the wetlands is not just if you think the wetlands have been outdated but again if it is if they [1:03:44] Charlie Burnham: are outdated they'll say we need to dp could yeah say that too right so they could but they're it's not I'll ask them I'll ask them if we want to include that in the condition I'll ask the dep if they think our wetland collineations need to be renewed right I can throw that right [1:03:57] Speaker F (unidentified): at them too yeah if you want but I do think we're going to reach out to girl palmer about it too but yeah you do whatever you would like on that but I do hear you the dp definitely they're they're reviewing a much bigger permit than we are for you and they are professional you know they are very smart in this stuff but it's not everything sure it's so I guess that is [1:04:22] Charlie Burnham: maybe that's the ask can we leave the things that are deps with dep for now and focus on the town problems that I might have we might have created or don't have maybe I mean my hope is that the performance standards that you guys have in your ordinances we've met those that's that's my hope is because they did once and I haven't changed anything so hopefully they did again besides some of these violation ordinances that are like you can't do anything if there's an outstanding violation so that's kind of the area that I that's how I came into this [1:04:54] Speaker F (unidentified): it's a good question about how we separate ourselves from dp or not you know you have [1:05:00] Speaker E (unidentified): Independent jurisdiction over the wetlands in this absolutely regulations you can defer. If you're satisfied that the DEP has addressed the issues adequately, you can accept that. And the peer reviewer certainly would consider that. But at the same time, DEP is a perfect leader. [1:05:17] Speaker F (unidentified): No, they're not. No, I'm not saying that at all. I guess what I'm saying is the other stuff like the violations and... [1:05:23] Speaker E (unidentified): Yeah, that is their... [1:05:25] Speaker F (unidentified): That is kind of we shouldn't. Are we allowed to continue with prelim approval and maybe even final approval with outstanding violations on... [1:05:36] Speaker E (unidentified): You must continue with preliminary, you cannot continue with final until those are resolved, [1:05:41] Speaker F (unidentified): or at least giving a decision on the final. Okay, so I mean it's really up to you if you want, like what could happen here is that we get through prelim, we get almost to final, someone comes back and says oh well you got to do this, and then that's going to take you all the [1:05:57] Charlie Burnham: way back. Let's ask for extension this time, which I won't ever forget again. No,, no,, no, [1:06:01] Speaker F (unidentified): no, I'm not talking about timing, you'll run out of time, I'm talking about redoing [1:06:05] Charlie Burnham: stuff yeah I think if that if that's a risk Johnson's willing to take I think I'm it's a risk I'm willing to take. I think the things that are going to be redone are going to be some I don't know I mean he'll have to pay is what it comes down to. If you hit well and say you're not supposed to it's like five dollars a square foot so you might be out 20 grand on his mistakes. There he'll pay for it right that's how that works you can I mean I've seen people blow through entire wetlands you write a big fat check for 150 grand and carry on. When he fixes everything I'm with you I'm with you that's that sentiment which has never again has never been our intention of doing this. It's not those are not poorly built houses those are not flippantly built like they tried working [1:06:50] Speaker D (unidentified): with everything the best they yeah it just stinks Julia it sounds like that maybe you're not but to me it sounds like you're moving towards granting preliminary plan approval with these [1:07:05] Speaker G (unidentified): conditions that would have been discussed. I don't know I don't know about that yet I don't know I [1:07:10] Speaker F (unidentified): still need to figure I want to hear from you all too like figure out all this so I still the big wetland delineation thing that's huge that's huge like if this has to be redrawn like why would we [1:07:22] Charlie Burnham: Go through prelim approval. If I can give you any comfort, there's zero chance they're flagging that part that's been crossed as wetlands again. It's been disturbed, it's filled, it's it's up. You can [1:07:32] Speaker F (unidentified): tell they can tell if it was wetlands. Like I'm just saying, like does that make sense to you all, or do does it not matter if these lines here aren't correct? And so if they draw, hold on, if they draw their building envelopes and we tell them to stay out of the wetlands, they get that done, but then the wetland lines change and now they're in the wetlands. Like does that matter? But certainly [1:08:00] Juliet (Chair): it doesn't matter. I mean, you know, the compounding issue is it's a cluster. There's other rules that apply for these clusters. I'm grateful that we have this ordinance and, you know, we're ultimately reducing the footprint, right? I'm torn. Well, okay, I'm chatting with that over coffee, there you go. But it is, that's what is in the ordinance, right? And so yeah, if the if the wetlands have changed, then it changes your building envelope and, you know, again there's been and damage that's done and we can't really tell what's going on. [1:08:52] Charlie Burnham: And I guess, again, worst case scenario, say there are more wetlands up there that they think we've hit, it's more DEP approval, it's more fines for John, it's more, I mean, but the road alignment and the lot, so I'm sure maybe some lot lines might get tweaked if so be it, but the road alignment's staying where it is. [1:09:12] Speaker F (unidentified): Sure, some things could stay where it is. [1:09:16] Charlie Burnham: So the impacts aren't that great and it's just moving lines on paper. Like the actual engineering of it isn't changing. The ponds are going to be where they are, it's going to collect, it's going to collect. So I hear what you're saying that we could be going down a path and again, I'm probably overly confident in the fact that the wetlands aren't going to change because we're on top of a ridge. So it's not like we're draining things into it that are filling it up more and things of the sort. It we're right on top of this thing, we're right on a divide of two sub catchments going in either direction, right? So what's happening on top of this ridge isn't going to have huge impact. If we were damming things up and crossing and making right, like we were creating hydraulic barriers where we can't, we're on top of a ridge, so there's nothing to barrier. You're the that little low spot, you come down into a saddle, you dip back up, but again that's the highest spot thought going through there which Is why it's so. I mean, I hear your concerns by having on having such an intimate understanding of this site and again being program environment. I feel good but what's being shown I'm not scared what the DEP is gonna say. Okay well so we've [1:10:35] Speaker F (unidentified): talked about what was we talked about DP and then I think the last thing or you brought up building envelopes but that has to do with the wetlands it has to do with your steep slopes. Is the ask there for them to at this stage go back and update those or can that wait till final the [1:10:57] Juliet (Chair): building envelope limit in this current application? Correct me if I'm wrong what they're saying is they would create a building envelope within the cleared areas and anything outside of those limits should be untouched. Actually, that's part of your HOA deed, right? From what I've read, is that each homeowner, you say, I don't know how you figure it out, put flags out there or something, say, this has to grow up. You can't touch anything unless it gets to 20 feet. When it gets to 20 feet, you can cut it down. I don't even think we say that. It doesn't, I think you do. Do we say that? Yeah, you say it's due to solar, the solar panels. You say you can chop it at 20 feet. [1:11:51] Charlie Burnham: I think the idea besides that is, I included an invasive species planting kind of document. Like somebody had mentioned it. I think you mentioned it, or the commission who had emailed in had requested it. So we just went ahead and did that. And so I think the idea is to let lower, group to throw out some lower growing shrub native species that we wouldn't have to trim them [1:12:12] Juliet (Chair): yeah it sounded like it was a way to appease the fact that you guys cleared more than you should [1:12:17] Charlie Burnham: should have no I think it was the hope was that it would ease the angst of thinking that it was it's been destroyed already right. I think the hope is that you don't look at the tree clearing like that area is now decimated because it's not like I think there's still pockets of whenever we do stump and grub that'll be lawn but the majority of that will be beautiful and it won't take then won't take long that's our hope right and again it's not he doesn't want big lawns he never has never been their desire out there they've always just tried to grade it as tight [1:12:58] Speaker G (unidentified): as they could okay so are we understood on building envelopes like what we're looking for yeah we need to see them yes okay and then the last [1:13:15] Speaker F (unidentified): Thing I believe was tree clearing, the big one, a big one. So the ask that we had was to show where trees have been cleared, right? And this is what was provided, usually good one, what that I [1:13:43] Charlie Burnham: made a really great figure showing the tree clearing limits. I got it finished, so but like [1:13:51] Speaker F (unidentified): the green is this supposed to be tree clearing? Those were the old building envelopes laid on top [1:13:57] Charlie Burnham: of what's actually there, so you guys could see kind of what the sketches were before and [1:14:02] Speaker F (unidentified): than what they are now. When we said tree clearing, where does it show tree clearing? Well no, [1:14:08] Charlie Burnham: it's just the image you can see the tree clearing was, but because again tracing all those lines it took me some time and to figure out those areas and to do all that. I mean I got this out, I turned this out to get a drone survey done and then to turn around in a week and a half, two weeks or whatever the time between the meeting and the deadline were, it was pretty quick. Okay, right, that's quick. And so then once I sent it in, this is the best I could do in that time, but then I went back and did phase one tighter, did another drone survey and or just a tighter drone image of that area, traced the tree lines as best I could, calculated the areas that were developed that were cleared on each lot and compared that to what it was allocated. So again like lot three was is a double lot, so it has 30 000 square feet cleared, and so one is really lot one slash two and lot three is like two slash because we did a lot adjustment halfway through, and so those two lots grew by 50 each, so 10 000 extra square feet each, and then the other lot 12 is actually lot 11 and 12. So that's why it's twice as big, because it actually was double the square footage, and I don't think that's how the what whatever the HOA or whatever the deed restrictions are really should have been interpreted, but that's how the math worked out. I'm not even sure John, even I'm not sure they did that math, but that's just how it worked out. [1:15:32] Juliet (Chair): There are inaccuracies in this that one for sure, lot four looks like the driveway goes through the wetland, oh so again those green areas seven, there's definitely some cleared areas if the [1:15:47] Charlie Burnham: green represents the cleared areas. No, this is the bad figure, the good one I sent after that, I traced the actual. Okay, so actually these are the original, you said it was bad, orange, I know we said [1:16:00] Speaker F (unidentified): We didn't accept, we're not accepting anything within 14 days of the meeting, but would it make sense for us to talk about whatever he sent now and see how he did it? I can actually do one [1:16:11] Charlie Burnham: better. I can explain why those are like that, because when we impacted lot 13 I went and did a drone survey to show lot 13. When we saw it, I did phase one, half of phase one wasn't even done at the time, there was still five undeveloped lots, and so those lots just stayed as what the clearing limits had been shown on the original plan or whatever, and so half of those are actual real tracings, half of them are just what was shown in the original plan, and then we went back and I did another drone survey and traced everything, and there you have it. I think we all agree that [1:16:43] Speaker F (unidentified): this is not, no, don't look at that, we all agree that this is not accurate, but does it make sense for us to talk to look at the, or do we just say come back next month and we will look at that [1:16:55] Speaker G (unidentified): and it may, it may comply or it may not, it didn't fit the time frame that it needed to fit [1:17:03] Speaker F (unidentified): therefore we should be reviewing it. All right, so we're not going to even look at it and we'll look at it next time. Sure, and it may not be, we'll have to, we'll have to talk about it. Sure, that's fine, yeah, okay, great, so that, so that's the tree clearing figure, yeah, and you know what, I'll include [1:17:20] Charlie Burnham: include both those figures in an update to the DEP and just say I don't know what they want, what you want with it, because again, like I said, the stormwater models are super. Have they asked, they haven't talked to you at all? They 've asked about the street clearing or I told them about the street cleaning that wasn't done, I figured what their response was, it wasn't [1:17:37] Speaker F (unidentified): anything of substance, yeah, so they haven't come out there, hmm, wow, okay, they [1:17:49] Charlie Burnham: gave us a pat on back for recording it ourselves, she said thanks for that, why don't you just take care of that with your site location, what you did when we had restored before we even reported it, we, he got on it that afternoon, he started pulling that back, and the ridge vegetation plan is not that complicated, right, so I pull it back to native re-vegetated, okay, so just, I'm sorry brian, I don't [1:18:13] Speaker F (unidentified): mean to say, why are you apologizing, because I feel like I'm talking a lot, but we, you all, I wasn't here at the last meeting, but you all granted approval, let me get this right, you deemed the application [1:18:25] Speaker G (unidentified): substantially complete, subject, we deemed the application complete, yeah, we're going through this [1:18:32] Speaker F (unidentified): Right, yes, the application was deemed complete last meeting subject to corrected mapping and tabled substantive review, which is what you just brought up. So I would argue that the mapping is not corrected still. The image is good. And so that was a condition. So it's not. The image is mapped. That's mapped. No, so. I didn't trace it. I know, I know. It's not correctly mapped. So therefore, I don't even know if we can get into prelim approval yet. Can we, or can you? [1:19:05] Speaker D (unidentified): To me, it sounds like a lot of the outstanding issues that we had, they're still outstanding. [1:19:10] Speaker F (unidentified): Yeah, exactly. Therefore I think we need that before we can get into prelim approval. [1:19:17] Juliet (Chair): No, we've seen this on previous subdivision, actually it was a cluster as well, where we didn't get everything that was requested as a condition. Just want to make sure that the [1:19:29] Speaker D (unidentified): applicant is fully aware of what the additional information that we need. Yeah, we don't want to be [1:19:37] Juliet (Chair): going through this again. Before we conclude here, I think we'll go through that list and make sure that the applicant is on board with what we're asking for, because [1:19:49] Charlie Burnham: I think I probably did what I said I would do at the end of the last meeting when we asked this. I said I'll do an aerial survey and put the building envelopes on top of it, which is when we say I didn't map it accurately. There's no ordinance for mapping clearing limits. I don't know what the, you say accurately and appropriate, that there's no standard there. So it's, you're saying it's not accurate or appropriate, but it's the best I could do in the time frame I had, and I went back and tried to supplement it with even more additional research, but as far as mapping, I mean, the definition of mapping is representing what's out there on 2D, and that's as perfect of a map as that's a, if you go onto your Google Earth and say show me a current aerial view map, it's going to give you an image. [1:20:35] Speaker F (unidentified): Okay, well, maybe we need to get into this. We said in the meeting minutes application is substantially complete subject to corrected mapping of the cleared areas. I don't think that meant a photo, right? I think we were talking about calculations, drawing around them, trying to figure out the total, right? Is that what you all were, Alan? I think you might [1:20:59] Speaker G (unidentified): it made that a lot of assumptions, I mean [1:21:09] Charlie Burnham: you're arguing the definition of mapped appropriately in two weeks, that's, it's this [1:21:15] Speaker G (unidentified): is a photo, it's a great photo, it's not a map, it's an ortho map [1:21:19] Charlie Burnham: it's an ortho photo, which is an ortho rectified photo to scale of, that's as sick as it gets [1:21:26] Speaker G (unidentified): Two gig photo right there. I mean, if you really want to argue that, then I guess [1:21:33] Speaker F (unidentified): I guess we have to. We can probably argue that, but I think, I guess, I guess I'm just asking for a [1:21:39] Charlie Burnham: little grace in a definition that we kind of made up at the end of a meeting. And I did my best, and I did my very best to even provide more information that again, it's just a picture. I don't think any of the things that I provided aren't something all of you could have processed in the five seconds [1:21:55] Speaker F (unidentified): you were looking. So what's the difference between this and what you just provided today? So this is [1:21:59] Charlie Burnham: this is the clearing limits as proposed, except for like I said, the first five lots that were there when I last surveyed it, when I did the wetland impacts from whatever month that was a year ago. So I traced all those, right? So I had these proposed clearing limits for half the locks, all of phase two, and then like real clearing limits for those bottom five or six. And so when I went back, I redid the drone images, watches why lots 13, 4, and now those all show the proper impacts underneath them, but don't line up with the green part. And so it's a mod, it's a current, shows the clearing limits as is, the photo with what we had proposed as our developed building envelopes as part of phase two, which is I thought the conversation we were really trying to have. And then I went back and really calculated areas of what we had done on lot one to go communicate to the DEP to make sure that my calc still lined up. I went and dug into all that much deeper and more thoroughly for both lots. And again, I think the conversation for phase two is pretty simple. I do understand he cleared outside, they logged outside of the clearing limits. But as far as like stumping and grinding and actually disturbing and fully developing the land, he hasn't done that. And those building envelopes that we have shown there are still our clearing envelopes that we are proposing on what has been done. So I'm saying, if you look at that image, everything outside of those green areas is going to be revegetated. And that's the picture I wanted to paint. It wasn't oh how many square feet of trees were cut down, because it's really irrelevant, because they're not impacts as far as anybody's concerned. So can I clarify [1:23:35] Speaker E (unidentified): you're saying that those green envelopes up there are what you're proposing? They're 20,000 square [1:23:41] Charlie Burnham: feet each day. They line up, look just like the phase ones, look at the same size. They're all the same size, they're all 20,000 square feet, lot [1:23:49] Speaker E (unidentified): 18 is 20 000 so anything might be skinnier that's like that's like 9 000 square feet maybe that back right one that's what it was on you. [1:23:58] Charlie Burnham: that's why look at lot 16 what's in your table that was the table that i was i was i was trying to again that was on the fly that table go with these diagrams so there's one table that you're talking about and the first tape version of that table showed 20 000 square feet for each slot i redid the math you said it's got to be 20 i some i thought somebody said 20 so i did a calculation put the table on there and didn't do a good enough job really going back and tightening that 's not that's not 9,000 square feet look at look at lot 9 and compare it to lot 19 and lot 18 it's it's right there lot 8 and lot 18 are right there same with 20 they're all 20,000 I'm not I'm not making that up look at the clearing limits on phase 1 and compare them to what I've shown on phase 2 and they're very consistent across the peer review sure. [1:24:46] Speaker F (unidentified): determine that yeah absolutely but i mean i just i 'm trying i'm having a hard time believing that you didn't understand that we were trying to what we were trying to see i didn't [1:25:01] Charlie Burnham: Understand the importance of the actual square footage of the trees that had been cleared versus what is supposed to have been cleared that was what I was trying to portray what is supposed to have been cleared versus what is and then what will be regrown and I think that does a good job of communicating that those green areas are what we're proposing as the final disturbed areas everything outside of those will be re-vegetated and be allowed to regrow and undisturbed that's what they were. Disturbed they're not disturbed they're cleared there's I guess it's a very that's that's that's that's the crux of it if you want to call that disturbed then that's a different conversation but the DEP won't call that disturbed under the ordinance. [1:25:43] Speaker E (unidentified): Ordinance clearing for development is defined in the Durham ordinance as disturbance okay clearing for development yeah. [1:25:59] Speaker F (unidentified): I mean I'm seeing notes from our meeting that I wasn't at that says discussion members question the timing and purpose of the clearing the discrepancy between the actual cleared areas and the existing conditions plans, the relationship to the approved phase one development, and the need for an accurate plan showing disturbance and wetland boundaries. So to me, I wasn't at this meeting, I saw the video, but it seems like y'all talked. [1:26:29] Charlie Burnham: About it, about what we were looking for. Again, I think I'm at phase two, as you asked. I think that's what I tried to communicate there. Is this is what's going to be disturbed. This is what I, this is what my understanding of disturbed is. So again, I not, you're saying, you're saying I'm like I'm being dumb about it. I wasn't. I took the what I defined as disturbed area and what we will have as disturbed area out there. I showed that compared to, I've said it, I don't know how else to say that the area outside those green areas we're allowed to revegetate. So if we really [1:27:02] Juliet (Chair): really drilled down in these, there's going to be more clearing. [Speaker C (unidentified): It looks like] some of the looks like there's existing vegetation again. This image, some of the green areas I thought [1:27:17] Charlie Burnham: you said it was a great, well, I mean, the layover, the layover is not laid over exactly. The whole thing needs to be shifted down 10 feet. It looks like the image underneath the road because look at the hammerhead right there. It needs to be pulled. The whole scale of it getting back to [1:27:33] Juliet (Chair): to what we were looking at. [1:27:35] Charlie Burnham: But I guess we're asking- [1:27:36] Juliet (Chair): The requirement from last month was anything from DEP, any correspondence from DEP about your corrective actions. And that hasn't been received either. [1:27:48] Charlie Burnham: Oh yeah, like what? I mean, I've included my emails that I've had with her, I believe in those correspondences. [1:27:59] Speaker F (unidentified): Can I just ask one question for you? If you're doing a site plan and you're doing your LOD, your limits of disturbance,, would you include the area that you've cleared, all the trees, or would you only include the future cleared areas? Say that again? Your LOD in a project area, does that include any areas that you've disturbed? You cut trees down. [1:28:23] Charlie Burnham: See, I don't consider cutting trees disturbed. DEP doesn't. That's kind of where my mind was. And I didn't know that the town has a different definition of disturbed. But all my life, disturbed has meant stumping and grading and disturbing the soil, not disturbing the trees. Okay. Like, yeah. [1:28:44] Juliet (Chair): So I'm just going to throw it out there. You've kind of put us in a tough position by doing all of this pre. Oh, I know. Right. Don't say I did. And again, I'm getting back to the cluster. Yeah. We want a cluster subdivision. We want to maintain as much of the existing property as possible and that's been altered, it's it's mostly, we actually have the option to say no, this can't be a cluster anymore, right, I don't think we want to go that way, but no I [1:29:17] Charlie Burnham: Guess you just end up waiting for it to grow back, and then somebody would come in and say, "Oh, it's." [1:29:21] Juliet (Chair): And we just have to hope that the homeowner doesn't take it upon themselves to keep that [1:29:28] Charlie Burnham: that area cleared. It's just a trust. That's the whole crux of this, of these things. It's like, you can't, I mean, codes can, codes can, I guess. Yes, it is. But nobody does, nobody does. [1:29:41] Speaker E (unidentified): If you put clearing limits on this land, those are enforceable. [1:29:46] Charlie Burnham: Sure, but I guess there's no mechanism to do so, I guess is really what it comes down to. It's very challenging to do. Someone has to come in and do a drone survey, which I've never heard of ever being commissioned. But that's not to say it's not the right approach, and I think it's, I think again, I've agreed the whole way through is, yes, let's get a proper, I'll go out there and do a proper survey of this thing and figure out exactly what's been done out there, because I haven't had anything to do with any of this. I was out of this for the last five years. I got pulled into it. But you are representing. I understand, I understand, and again, I'm representing his best interest, and I, this is such a good subdivision that is, it's a good subdivision. [1:30:30] Speaker F (unidentified): All right, what else on this? Anything there should be table for [1:30:40] Speaker C (unidentified): next month? I [1:30:47] Speaker D (unidentified): would think that we would table the additional preliminary view until December, the December meeting. I'll make that a motion. Yes, so can you clarify, so we're [1:31:00] Juliet (Chair): we're tabling it, what can we define labeling the substantive review of the preliminary [1:31:13] Speaker D (unidentified): correct, okay, until December, and we have provided the applicant with the additional information that we want. Can we, can we go over that again? Come, I know it's DEP [1:31:29] Charlie Burnham: I know we want DEP's stamp of approval, the rest of them still, I mean, DEP approval, I don't know [1:31:36] Speaker G (unidentified): the rest of it, any wetland alteration, I think we are, is that on us, George? We're going to send [1:31:43] Speaker E (unidentified): girl a question. Well, I guess the question, what I'm hearing, table the whole thing, the prelim, let them come in with accurate plans of what they're proposing, what's been done, and what they're proposing, then give a preliminary approval if it's satisfactory and send it to the peer review to have it all peer reviewed, or you can have a peer review of that done if you're still not satisfied that it's accurate before you give them their quote. We've had both options, right, but we [1:32:11] Speaker F (unidentified): Had talked about the wetland. I had, I had made the recommendation that we needed delineation done, yeah. And then we had talked about asking Goral Palmer if they agreed based on beyond five years. [1:32:22] Speaker E (unidentified): And the applicant can contact Goral Palmer, try to sort that out. And Goral Palmer gives a letter to the applicant saying that mapping is fine. [1:32:32] Speaker F (unidentified): Okay, let's put it on the applicant. [1:32:33] Speaker E (unidentified): Let them include it in their package. [1:32:35] Speaker C (unidentified): Okay, good. [1:32:38] Speaker F (unidentified): All right, so the question to Goral Palmer for you is, the you know 2021 wetland delineation acceptable for this review of this project and then also with the understanding that phase one of the subdivision was already built and since that delineation was completed so a delineation hasn't been done after the phase one was built in other words delineation was done when they're all the trees were there et cetera yeah if you could get a letter from them I guess world plumber okay [Speaker C (unidentified): That] was the wetland part DP you said you unders stand what we need their approval yeah put it up in [1:33:44] Speaker A (unidentified): Wait look down at the crux of it the [1:33:48] Speaker E (unidentified): third one was accurate mapping of the cleared areas [1:33:51] Speaker A (unidentified): existing in homes in that email box downstairs and [1:34:01] Juliet (Chair): have we received the fire chiefs do we need no we don't need anything from the fire chief now okay so I'm just looking at your draft conditions George just going through these to see if there's anything else that we need to include here to make sure that the applicant 20 foot road we're all set the 20 foot wide road [1:34:28] Speaker A (unidentified): we're all set with so [1:34:36] Juliet (Chair): Can I ask you go back to the question one second I just want to go through this list that George has provided us with so one of your draft conditions George was about clearing limits, buffers, and plan restrictions. So this was for final plan. Okay, nevermind. Yeah. Okay. Yeah. Mr. Berger, you might want to just go through the draft conditions of approval that are part of this package, just to make sure you dot your I's. This just gives you a good idea as to what- This is for final. [1:35:25] Charlie Burnham: For final. Yeah. Yeah,. Yeah, I threw what I had at it. Just to be proactive, maybe. Yeah, that's kind of why I included it, so we get ahead of it a little bit. Can I ask a question about the clearing limit? I mean, I get it for phase one, let's make sure that we're not in any violations down there. That's a codes conversation and with you guys, what they come back and say we've messed up or haven't messed up. But for phase two, what are we trying, what do you want me, what is the goal of that figure to show what, say I say I, you were looking at it and all those tree bones were traced perfectly, what would be our decision or conversation? [1:36:01] Juliet (Chair): So that's in, again, this draft condition of approval number four. So what it says is, a revised plan showing enforceable clearing development envelopes. That's what those are. That's what those are. Joe, do you expect anybody to enforce that? [1:36:23] Charlie Burnham: I mean, how can you enforce any? I mean, with a survey, I could drone survey it. [1:36:29] Juliet (Chair): Flagged areas or? They could flag them. [1:36:31] Charlie Burnham: I mean, that's a condition that you guys could totally throw at it. Hey, flag the clearing limits, which is something, again, I did a survey, I would have to go out there and walk. [Speaker C (unidentified): But that's what] those are. I mean, in terms of what your question was, when you want to say enforceable, we're enforcing it off of a drone image that I just did. So it's enforceable the same way. [1:36:54] Speaker E (unidentified): Let the peer reviewers sort it out. Okay. Yeah, okay. But yeah, let your peer reviewer sort it out that [1:37:01] Charlie Burnham: that seems to me like something that could also, I mean, I'm pure of yours part of the final, that's all so far we put everything on the peer reviewers and the third parties and those come back fine. I guess I'm still curious what we're not approving tonight the [1:37:18] Juliet (Chair): motion has been to table, we haven't said, we haven't approved, right? Is there a second? Yeah, I'll second. Thank you. Any further discussion back [1:37:35] Charlie Burnham: to my initial question, what we're trying to communicate, sorry, [1:37:37] Speaker I (unidentified): sorry, I was just going to say, you said that in your updated, you have measurements, you have, because I think that's what we're driving at here, that what's enforceable. So if you have of lot 22, that's 200 feet of that green square, is that what your new drone image shows? I guess I [1:37:59] Charlie Burnham: Don't want to put a bunch of postage stamp building envelopes out there, and again, we didn't do that for phase one. Whole phase one, every lot was drawn as you guys see them, and obviously they went outside those moments, but they did a pretty good job of map of going with what the concept was for each lot. Here's your driveway, minimize light pollution, get yourself maximum buffers. Like it wasn't a flippant congress, like I didn't wasn't just, they're all orchestrated that the southern clearing is the clearing is to the furthest south of every building, like where the buildings go, like there was a lot of thought put into those envelopes. They're not just posted stamps, and I think it actually, regardless of how we consider the sizing of them, that is the that [1:38:38] Juliet (Chair): was the idea, like and I'm sure there was a lot of thought put into phase one. Okay, but again, cluster says your building envelope cannot include a wetland. Obviously, that didn't happen. I think we put a lot of time and effort into saying what it should and shouldn't include, and then it's blatantly disregarded. [1:38:59] Charlie Burnham: Okay, so in every subdivision, then the building envelopes are essentially meets and bounds at that point? [1:39:07] Juliet (Chair): Cluster subdivisions have, again, different rules. [1:39:11] Charlie Burnham: But is that what I'm saying? Like in other cluster subdivisions, those clearing limits are meet and bounds, measured off and enforceable, like as you're describing? Yeah. Okay. Yeah. And they're just squares, just like right in the middle? [1:39:26] Juliet (Chair): No, they're funny shapes. There's no squares, nothing square here. [1:39:29] Charlie Burnham: No,, no, but I'm saying that's what you want. That's what the other stuff, that's what other cluster subdivisions do, is they just say, here's an enforceable square that you can build inside them? Yeah. Okay. For clusters, yeah. Yeah. Yeah. [1:39:40] Juliet (Chair): It's ugly. Well, then I guess an example we could show from Ivy Ridge. I don't think it's a responsibility of the board [1:39:49] Speaker E (unidentified): or the staff to educate the applicant's consultant. I know. Okay. [1:39:56] Juliet (Chair): But when we approved this as a cluster, the building envelope would have never included wetland. [1:40:05] Charlie Burnham: No, and again, this figure's awful. I mean, it's the best I could do in a week and a half, but the whole image needs to be shifted 10 feet down to the left. [1:40:13] Speaker F (unidentified): Also I just I have to say this thing so for phase one you didn't you guys didn't come in and girls didn't come in and clear and then send us if you didn't clear anything you drew your building envelopes then you came in and you cleared what you've done for this is you've gone there and you've cleared all of it pretty much and now you're trying to fit your building envelope into an area where you've already cleared so like this like the idea of the clearing is the impact so you've gone above and beyond like you've doubled the size of the impact that you would have done if you had waited to clear I'm worried so I'm just but the impact I think we're [1:41:00] Charlie Burnham: debating impacts and I think what you're talking about is negligible compared to the image the picture you're painting inside your head. [1:41:05] Speaker F (unidentified): Well, no, I'm just seeing from what I can see on the screen. [1:41:08] Charlie Burnham: I know, but you're talking about cut trees. It's not like it's, again, I've been told they didn't stump and grub. I didn't count the trees before and I didn't count the stumps after, so I don't know. [1:41:18] Speaker F (unidentified): Why didn't you do that here? Do what? Why didn't you clear the trees here? [1:41:21] Charlie Burnham: Well, because we were waiting on DEP proof when we thought it was coming imminently and there was that bat window where you can't cut trees between the whole summer. And so when it was still outside of that window, they thought, all right, let's have a logger come in and get the trees down so we don't mess with the bats like everything and let's do this thing right and yeah you let loggers loose on a freaking parcel of land and they and again he brought and he called it a forester so like you can say it was for development but it also was like it was it was done by the book like he went and talked to a forester had him sign off on the plan or whatever I guess I from what he's shown and what the conversations have been portrayed to me that's how that process went and again it wasn't let's get ahead of it and get nothing again I modeled this stuff so conservatively and the stormwater treatments are all wonderfully sized and I treat over 99 of what we do out there got forcing buffers along the whole I mean the whole thing is buffered and every bit of that road is collected so your reviewer [1:42:27] Juliet (Chair): should be very happy he should be all right so we have a motion and a second Darren any other comments no I think the peer review and DEP will shed a lot of light all right so you're satisfied with your concern that's not my concern thank you all in favor okay [1:42:48] Speaker C (unidentified): Unanimous. Okay, thank you. Thank you. Hey. [1:43:17] Juliet (Chair): still with number six continuing business b substantive review of bassett subdivision amendment application winter's way map 11 lot 41 dash b public comment will not be taken mr thomarge would you like to go through your staff notes okay [1:43:42] Speaker E (unidentified): So is the word is aware where the applicant is proposing an amendment to prior subdivision plans in order to divide one of the lots in those plans to create one new house lot, splitting off the existing home. You granted preliminary approval on October 7th, and the applicant submitted a final plan application on October 14th for consideration at this meeting as a new application. And I did clarify with the applicant that the deadline for new applications is 21 days and the supplements that are referred to as what we were dealing with in the prior application where when the board asks for additional meeting additional information at the meeting where they review the application that was submitted 21 days in advance that supplemental information which you've already talked about and are familiar with can be submitted 14 days before the deadline so this applicant has submitted some additional information to address some of the concerns that were raised at the preliminary approval as well as staff notes and again you can consider whether to entertain that information or not. I did not put into the packet. The real issues on this are five. The first one is the road waiver which you've already indicated that you're willing to allow the in excess of 15 percent grade. The fire chief and the road commissioner have said that for two houses back there it's reasonable to allow that existing grade to continue. The fire chief however has indicated a concern with wavering both the road grade and the fire protection water supply. The ordinance I was always under the assumption that they were asking not to have to put in a fire pond. We changed the ordinance back in January to say you can put in sprinklers and that is the basis on which I went forward in the in my staff notes. I was not aware that they were asking for waiver of that as well which based on the most Recent submissions indicates they may still be asking for a complete waiver of all fire protection water supply. That's something to clarify tonight and make a decision on. The I think it's clear that the road based on their engineers and consultants advice needs some maintenance work done to rehabilitate it to be suitable for continued use. And so the conditional agreement in lieu of a performance guarantee would basically say that those improvement those maintenance items as well as the turnaround at the top would have to be done before issuance of any building permits or and or for sale of the lot. The fourth issue is the maintenance agreement and we've at the prior preliminary approval meeting discussions there were three lots that use this or two currently that use Winter's Way they'll be adding a third one and the maintenance agreement needs to document what the respective rights and responsibilities of all parties using the Winter's Way have to be clear and legally documented so they have submitted a deed that indicates that lot 41C, I think it is, which is out on Snow Road, but has their driveway off Winter's Way. There's a deed agreement. Part of their deed is that they cover, apparently, the first 200 feet or so of Winter's Way. The ordinance specifies that the maintenance agreement either has to include them, not just a d reference but or if they refuse to participate in that maintenance agreement which is allowable then they're supposed to submit a an affidavit a legally notarized affidavit saying that they choose not to participate in and they can have whatever agreement they want based on that but it appears that the documentation is still not adequate to satisfy the ordinance requirements. It just needs to be clear in the record that the allowance for the road grade and not requiring a performance guarantee does not waive the responsibilities for making those improvements. So any decision that you make should include a conditional agreement of some form. And so again, to summarize the issues of the road, the sprinklers, and the maintenance agreement, And I did include a draft motion for your consideration. [1:48:42] Juliet (Chair): The applicant would like to address the board. [1:48:46] Evan Jones: Evan Jones with Jones Associates. So, yeah, for the first point for fire protection, we had initially submitted for a waiver for the full fire protection standard. I know you folks were in the process of ordinance change, right, before we submitted for that waiver. We had some discussions with the fire chief initially on whether or not he would be in favor of waiving the sprinkler requirement for a single additional lot, and he had indicated that he would be in favor of that if the board and code enforcement favored it. Based on these staff notes, it maybe sounds like he's no longer in favor of that. George, correct me if I'm wrong. That's correct. Okay, so yeah. That's just a clarification on the sprinkler system. We hadn't applied for the full waiver and had some indications that maybe we could get that, but it does looks like that wouldn't be the case. As far as the road maintenance agreement goes, George is correct. The existing lot has a provision in their deed that states which portion of road they are responsible for maintenance for, as well as the portion of cost allocation that they're responsible for, and the provision for how that cost allocation would change if the lot being Steve's lot was further subdivided. So we were under the impression that all of those provisions within that current deed need would satisfy those maintenance requirements for that lot. Based on these notes, I'm getting that lot is being required to be a signatory. No, the ordinance specifies they [1:50:58] Speaker E (unidentified): either have to be a signatory or they have to sign an affidavit or a statement that they have been offered and are not and are not willing to participate in it beyond what their current obligation is. That gets notarized and submitted in the record. That way there's a legal determination that clarifies what everybody's rights and responsibilities are. That's right in the ordinance. [1:51:21] Evan Jones: So again, you know, apologies if that was obvious, our misunderstanding. We thought that their rights and responsibilities were within their deed. I guess as far as questions that I would have on this on conditional agreement, in this case I think we had asked for a waiver on the performance guarantee, so for a conditional agreement and the form of the conditional agreement that would be acceptable to the town, would that just be a note on the plan stating that no, you can't building permit can be issued? Yeah, right. Okay, it's right in the ordinance. Okay, well it says a form acceptable to the town, so I wanted to make sure of that. Okay, can you [1:52:12] Juliet (Chair): finish what your sentence? Yeah, so no building, no building permit can be issued until the [1:52:21] Evan Jones: The improvements that are proposed on Winter's Wear completed cook up that was the so the construction of the turning right turn around and the cleaning of the ditches that was indicated on the plans. Yeah, I think that's the intent of the yeah. I just wanted to make sure the form of it would be adequate as a note on the plan. Yeah, and then my other question or clarification on those points is on the exact language of the conditions to be added as notes on the subdivision plan. There are there is a section seven and eight I don't know because as well as plus nine here is the except for the last sentence of those sections is that the exact [1:53:28] Speaker E (unidentified): This is this is a draft. This is a draft for more consideration. They will be discussing it. They will take your input and if you want to propose changes to it for your purposes they'll consider that. Okay. [1:53:40] Evan Jones: Okay. So the language of the condition gets proposed to us, or we propose the language of the condition? [1:53:49] Speaker E (unidentified): That's what's proposed currently as a starting place. It's very comprehensive, very thorough with AI assistance. The board will look at that language, and you are free to interact with the board and make changes that you think are appropriate and necessary. [1:54:06] Evan Jones: Okay. Now, I just wanted to clarify where the language would come from. [1:54:09] Juliet (Chair): This would satisfy it. Okay, so just to be clear if you're referring to conditions to be this is part of the staff notes conditions to be added as notes on the recorded subdivision plan 789 is that [1:54:24] Evan Jones: what you're referring to? Yeah, conditions to be added as notes and the exact wording of the language of those conditions. Thank you. I just want to make sure that we're all speaking the [1:54:34] Juliet (Chair): same language here and on the same topic. [1:54:39] Evan Jones: And then I guess the other the other language and number nine on that states any has the maintenance agreement and any restrictions needed to preserve rear-end access for emergency and service vehicles. I know there was another note about legal access of emergency vehicles. Is there a specific language requirement for that? No, I don't think it needs to be that specific other than the road shall remain yeah clear and accessible. Yep, for emergency I guess. Okay, obviously [1:55:33] Speaker E (unidentified): a concern would be if that road is not properly plowed with that grade it would be very difficult for the fire department to answer a call. Yeah, I think that's the intent keep it clear at [1:56:02] Juliet (Chair): this point. I think so. Yeah, that [1:56:05] Evan Jones: was a I just wanted to clarify this before I guess you move forward. Sure, of course. [1:56:12] Juliet (Chair): Comments from the board. Yeah. [1:56:21] Speaker C (unidentified): [1:56:24] Speaker F (unidentified): You know me wetland person. Hi. No, so this is in resource protection, right? Portion of it. Yeah, a little portion of it is this. Yeah, North, the North corner. Yeah, you have a perennial stream that is running through, and I think I don't have the pointer, but it's, you can, yeah, it's the double dot. Yeah, the double, yeah, exactly. Okay, and I believe there's a hundred foot setback right from that stream. Oh wait, no, what is that? 100 foot side line. So you're [1:57:11] Evan Jones: talking about the resource protection buffer that's kind of a bubble air line off from that. Yes, exactly right, this here. Yeah, [1:57:19] Speaker F (unidentified): is that it's a hundred foot, but it says side lot line setback, is that right? I can't read it. 'S [1:57:38] Evan Jones: so yeah, that it's, it's defined in two different. There's an arrow pointing to the hundred foot rear lot sideline setback, and then there's also a line that is the resource protection district, which is 100 feet from the perennial stream. Great. Okay, where is that line, that hundred foot from the stream? So that is like this sort of a bold line that is a dot. Yes. Okay, great. So this is the hundred foot step back from the perennial. Yeah, it's actually, it comes the, yeah, the dash line is the 100 foot setback. Yeah, okay, and [1:58:24] Speaker F (unidentified): to the right is a area cleared for intended development. What is that around test pit and proposed drainage field? [1:58:38] Evan Jones: That circle, that is the 100 foot well exclusion. Okay, so the area that was intended for the septic system and then the setback distance for well from that intent. Okay, so are you planning to [1:58:52] Speaker F (unidentified): or have you already cleared inside that entire 100 foot? It says area cleared for intended development, so I guess I'm just asking if that was cleared. That [1:59:07] Evan Jones: is not entirely clear. There will still be some additional clearing I think that would need to take place for that drainage field, [1:59:15] Speaker F (unidentified): field that the site evaluator. Okay, there's just a small spot that does intersect with the [1:59:23] Evan Jones: 100 foot setback. You see that very small, the well exclusion zone intersects with the, yeah, 100 foot setback, but that's just the setback from the septic system. Is that not where you're [1:59:39] Speaker F (unidentified): saying area cleared for the intended development? No, the area cleared is the, is like the, [1:59:46] Evan Jones: it's not that line. So it's the cloud line, that cloud line. Yes, that is the area that's the, oh, that is talking about this. [2:00:00] Speaker F (unidentified): Yeah, so it's talking about that. Yeah, okay, all right, so this is just showing, hey, you can't [2:00:05] Evan Jones: You can't put a well within that oval. You're not, you're not like clearing in here. This is what I was doing. No, yes, there I see where you're going. All right, all right, I got you. And this is not [2:00:15] Speaker F (unidentified): perennial, this is that's a well, a wetland. Okay, all right, all right. That's all I have right now. [2:00:22] Speaker C (unidentified): Thank you, Darren. [2:00:46] Juliet (Chair): Do you have any questions or comments? [2:00:52] Speaker A (unidentified): I do not have any multiple conditions that are well documented. What [2:01:10] Speaker F (unidentified): is this line here? [2:01:12] Evan Jones: So that's a, what, building envelope line, LOD there. It's, it's build a building envelope below. So setback. We get into this with LUPC a lot. There is no setback to forest or heat bumpers. So we do, if we're showing a building envelope on a plan, we usually just go five feet off and we show that so that people understand that they have to stay. Right. So you're not going to impact in between here and the wetland. No, it's outside. So it's like the same line [2:01:52] Speaker F (unidentified): that the 20 foot side. Yeah, setbacks are, yeah, okay, great, that's good to hear, thank you. Floodplain, that's in the same area, right? Yep, FEMA flood zone, you can see it, I think that's building [2:02:15] Speaker G (unidentified): that's this small line here, I think. Yeah. [2:02:22] Evan Jones: That's the smaller dash line, zoning right here. [2:02:26] Speaker C (unidentified): Yeah, okay, all right, remember [2:02:50] Juliet (Chair): just ready to go through the findings and conclusions [2:02:54] Evan Jones: rather than drafted. Yeah. [2:02:58] Speaker C (unidentified): So, okay. Okay. [2:03:44] Juliet (Chair): would somebody like to go through these or shall i 'm on i don't know where you go looking at but i'm at the draft findings of facts Conditions C, the Consolidated Findings and Conclusions. [2:04:06] Speaker F (unidentified): Yeah, I'm there too. Okay. [2:04:08] Speaker E (unidentified): And again, as we've discussed in the past, it's not necessary to read every one of them, but it is important to acknowledge that you have read them and, Brian, for you to ask if they propose any changes to any of those. [2:04:23] Juliet (Chair): So, C1, subdivision, layout, natural resources, and municipal services. There are three findings here. Are there any additions or edits to the three? [2:04:37] Speaker F (unidentified): How about a question? Can I ask a question? Does that set you back? Did we talk about tree clearing? I feel like we did. When are you proposing to clear trees, I guess? [2:04:52] Juliet (Chair): I don't need to clear any trees. Oh, you don't need to clear any trees, okay. Would you please state [2:04:59] Speaker G (unidentified): your name? My name is Steve Bass. Thank you. So all trees are cleared that need to be cleared [2:05:05] Speaker K (unidentified): was logged prior to my purchase. There was very little forestation, there's a lot of [2:05:14] Speaker G (unidentified): of grassy paths. Yeah, love these properties. Okay, I remember talking about that now. Okay. [2:05:20] Speaker F (unidentified): Question was I asked was because of the bats. I do see your letter from the main Department of Inland Fisheries and Wildlife. They do mention bats of course, but they do say that based on your project plan they don't anticipate any impacts. They don't say anything about tree clearing windows, so that probably is why, because you don't need to clear any trees, so [2:05:44] Juliet (Chair): we're good there. Thank you. Okay, yes, well, okay, number two, road access, road standards, and fire protection, and there are four findings of fact here. Any other comments or questions, options or edits to the, to these, this [2:06:34] Speaker F (unidentified): is where we would talk about sprinklers. It's in there. [2:06:38] Speaker G (unidentified): So sprinklers are in, yes. Okay, so they're back in for the main house. Okay, the applicant [2:06:48] Juliet (Chair): states that there'll be two ADUs in addition to the main house. One ADU, there's not even a separate [2:06:57] Speaker K (unidentified): a separate building. We're planning on doing an in-law suite as part of the main house. [2:07:05] Juliet (Chair): So it's part of that house. We will require sprinklers for the main house. ADUs are not required to have sprinklers, and that's state law, but since we're, they've asked for a waiver on the fire pond, yeah, here where we're asking that the house be sprinkled in lieu of the fire pond [Speaker C (unidentified): and] that's okay. Any other comments? Number two, number three, legal acts, access, and Winters Way maintenance. And there are three findings of fact here. Any additions or edits to this? Okay. Number four. Financial and technical capacity. Completion of improvements. There are three findings of fact. Any board additions or edits to these? [2:08:46] Speaker G (unidentified): D,, this is where we talk about the grade, right? Yeah, [2:09:05] Juliet (Chair): sorry, George, is an administrative thing. Should this be five instead of d? What's, we see, okay, now d, yes, it's the waiver, yeah, the waiver, okay, the separate consideration. [2:09:19] Speaker E (unidentified): Gotcha. We're rolling it into this. Consolidate. Consolidate and road waiver. Gotcha. Okay. [2:09:26] Juliet (Chair): Any board adds or edits to this? Everyone good with the grade? Yeah. So we grant this. So we're granting it. [2:09:41] Evan Jones: We're not denying it. Correct. Yeah. Okay. Yeah. Great. [2:09:51] Speaker E (unidentified): On the existing grade. Yeah. Yeah. [2:09:56] Speaker I (unidentified): It's not waived for turnaround, maintenance improvements, legal access, and fire protection. It's wavered just for the road grade. Thank you, so that makes sure I understand. Yep. [2:10:11] Speaker F (unidentified): That's how I understand it, too. [2:10:13] Juliet (Chair): Okay, E, final plan conclusions and conditions of approval. We have three draft decisions, three conclusions, the general compliance condition, administrative conditions, and conditions to be added as notes on the recorded subdivision column. Have you all had a chance to review these? Yes. You did? Yep. [2:11:03] Speaker E (unidentified): I did have some questions about some of the specific wording [2:11:06] Charlie Burnham: that you might want to review with them. [2:11:08] Juliet (Chair): Yeah. Thank you, George. So before we make a motion here, are you all okay with these conditions of approval? [2:11:20] Evan Jones: Yes. So are you making a, you're making a motion on all of E? [2:11:28] Juliet (Chair): Well, we'll make a final motion on everything that we just, the conditions of approval and the final plan conclusions. Yes. [2:11:42] Speaker E (unidentified): Yeah, so if you want changes or need changes and more degrees of them, that'll be the time to bring those up, but again, this may be overkill the AI does that, and if there's any part of this that's problematic and warning, you can ask for consideration to be changed. Yeah. [2:12:04] Evan Jones: I guess the in the wording aspect, it under item seven, I can take everything but the last sentence and put it on the plan as a condition. Under item eight is more of a statement than a note on [2:12:37] Juliet (Chair): the plan, so it identifies [2:12:43] Speaker A (unidentified): as opposed to shell identify it [Evan Jones: would be I] might want to split those into two. [2:13:02] Speaker E (unidentified): It does, it, I think you already have some draft wording in your, I think it's in the plan that's up there, right, that is the recognizing, the key is recognize the waiver of the road standards. [2:13:18] Juliet (Chair): Yeah, we've left it broad. Yeah, it's very broad there. This is just a little bit more [2:13:25] Speaker E (unidentified): specific, it may be too specific for [2:13:35] Evan Jones: eight, right, yeah, for eight. And I mean, your board, your draft board conclusion is more in line with what I would normally put on a note for a plan. So the board grants one consolidated waiver of the otherwise applicable. Which number is that? It's in your D, consolidated road waiver. It's in the draft board conclusion. [2:14:11] Speaker E (unidentified): D, is there a number? [2:14:14] Speaker F (unidentified): No, it just says- [2:14:15] Juliet (Chair): It's D, the consolidated road waiver. [2:14:18] Speaker A (unidentified): Oh, okay, if [2:14:24] Speaker E (unidentified): that is acceptable to the board, we can certainly put that into it. Yeah. [2:14:30] Speaker F (unidentified): I think, I think what he's saying is making great sense, like what we have, the language, the words that we have under number eight, right, yeah, just doesn't, that doesn't go on a plan, those words, but what he was saying under D, I can see that going on typically on a plan, right, so [2:14:56] Speaker E (unidentified): I think what you do is you strike out in that so use the draft board conclusion this is on page 1.6 at the top you strike out only to the extent identified in the board's motion and then that then the rest of it is this waiver does not waive the turnaround maintenance increments legal access or fire protection requirements. [2:15:21] Speaker A (unidentified): So I think it was just strike out only to the extent [2:15:24] Speaker E (unidentified): identified by the board, does that work? So the condition would be, the board grants. [2:15:34] Evan Jones: What is it referencing as appendix one in that? [2:15:40] Speaker E (unidentified): So 256.9 B-14 is 6.5, [2:15:52] Evan Jones: I just don't want to wave or bind us to something unintentionally. [2:15:59] Speaker E (unidentified): 6.9. It should be the road standards reference to the appendix. I [2:16:13] Evan Jones: think that's fine. Yeah, let's just make sure it's right. [2:16:18] Speaker E (unidentified): 6.9. Number 14 is road plans meeting the requirements of Appendix 1 prepared by a professional engineer so you're getting that waiver okay and then the six point 6.18 d let's just check that [Speaker A (unidentified): is 18.] yeah that's just the similar traffic standards so i think those are the applicable portions of the ordinance that they would have to meet with the full professional engineering analysis okay [2:17:04] Speaker F (unidentified): yeah and then you'll keep in that last sentence [2:17:08] Speaker G (unidentified): this waiver does not waive the turnaround yeah so this is this will be coa number eight [2:17:14] Speaker E (unidentified): right substituting for what's down there eight yeah that works okay and [2:17:24] Evan Jones: then nine is under that [Speaker C (unidentified): that so] identify them right and you know find out how to reference the approved easements and maintenance agreement restrictions yeah [2:17:46] Speaker E (unidentified): so it has to it has to reference the main screen [Evan Jones: not recorded though] yeah typically you do so that someone knows where to find that maintenance agreement and maintenance agreement does get recorded the maintenance agreement has to [2:18:01] Evan Jones: to reference the recorded plan, usually. [2:18:05] Speaker E (unidentified): Yeah, they can cross-reference each other, don't they? Mm-hmm. [2:18:21] Evan Jones: That's what you're saying. It's a chicken and an egg issue. It's a chicken and an egg issue, yeah. Usually, we record the plan and then any covenants, restrictions, or agreements with reference to record a plan. [2:18:31] Speaker E (unidentified): Well, what you can do is not give the specific reference, just say new recorded plan. Does that work? [2:18:39] Evan Jones: So the item nine, [2:18:41] Speaker C (unidentified): And then we started [2:18:53] Speaker A (unidentified): with this approval thing. [2:18:57] Speaker F (unidentified): Isn't this just saying that you're going to list the easements and maintenance agreement on the plan, right? And then the plan is going to be recorded. Right. [2:19:08] Evan Jones: I mean, we can state that a maintenance agreement shall be recorded. Shall be recorded. Yeah. That would be better. Yeah. To put on the plan shall be recorded you know for the and [2:19:27] Speaker E (unidentified): The maintenance agreements will [2:19:28] Evan Jones: Reference this plan and its agreement shall be recorded and identify any restrictions needed to preserve your own access to vehicles and prevent restrictions to turn around. Yeah, I think we can reference that there shall be a maintenance agreement, that's a better way to do it. Yeah, I think so. Because then we can reference the, I'd rather reference the plan in the maintenance agreement that gets recorded. Yeah. Or recorded in the plan. Because if we don't record the plan first, then the lots aren't created yet. [2:20:10] Speaker A (unidentified): Right. So. Yeah, you need that. Okay. [2:20:14] Speaker E (unidentified): So five owners down the line, title of attorney's note is a maintenance agreement. [2:20:19] Speaker F (unidentified): Yep. And then seven are we good there seven [2:20:27] Evan Jones: I was just going to take out the last sentence I think so the new principal struck dwelling construction on lot two shall be equipped with residential fire signature system [2:20:43] Speaker A (unidentified): So just do with lessons which [2:20:48] Speaker E (unidentified): You already previously said [2:20:53] Evan Jones: Yeah I think that covers that if that is the moment should [2:21:17] Speaker G (unidentified): We take some motions [2:21:20] Speaker F (unidentified): I'd love to hear a motion. Yeah well how about I read one before the suggested road waiver motion to grant the consolidated road waiver described in section d I don't know if it was amended by the Board upon finding that the applicable Section 250-6.35 criteria are satisfied and subject to the identified safeguards and conditions. Second. All in favor? There are no more. All right. Keep going. The suggested final plan motion to adopt the Consolidated Findings of Fact, Conclusions and conditions of approval as amended and grant final plan approval for the Bassett subdivision amendment subject to the conditions contained herein and the road waiver that we just granted. [2:22:26] Juliet (Chair): Second. All in favor? [2:22:34] Evan Jones: Thank you all. What's your procedure and timeline for submitting [2:22:41] Speaker E (unidentified): Submitting the required items for this so the easiest way is to just make the revised visions submit them and they'll sign with the board next board meeting if there is a problem with that then Brian you would offer that perhaps the plan could be at the town offices and the board members could come in and sign it okay you send me an electronic version I'll look at it make sure it's okay and [2:23:05] Evan Jones: We could drop off once you're okay with the notes the way they are okay I [2:23:14] Speaker K (unidentified): have a question thank god evan's here because none of this in my wheelhouse my biggest concern is when and hopefully somebody can explain to this can i pursue doing the road improvements putting in my turnaround and then pursue a building permit. Tomorrow. [2:23:38] Juliet (Chair): That's what I want. Well, your building permit, you cannot pursue until the road improvements are complete. Correct, yes. [2:23:44] Speaker K (unidentified): So once those are satisfied, I assume Calvin will sign off on that. [2:23:48] Juliet (Chair): If you don't want to wait until our December meeting for us to sign off on your plans, if you want to send them to the town hall, we all can stop in at our, we have a minute, and sign the [2:24:03] Evan Jones: plan. That may expedite it for you. Sure, thank you. Thank you. Good job. Okay.
New Business
[2:24:17] Juliet (Chair): Last thing on our agenda, I believe. No new business, number eight, other business, language ordinance updates. George briefly talked about the addition of the historic commission issues, and George, I'm not sure if you have any other updates on, I did get a response [2:24:53] Speaker E (unidentified): from the town attorney that I'll include in the packet for next month. Okay, so now you can look at what she's suggesting for what, for the affordable housing. Yeah, and working on, I'm going to include a working paper draft for the amendments for the noise gravapids and [2:25:12] Juliet (Chair): South house, okay. And the [2:25:17] Speaker E (unidentified): Ecopulsa committee is having a meeting, or did they have any, lots of you should have had a meeting last week. I'm hurting. Yeah. [2:25:29] Speaker D (unidentified): Great, being no more business, I make a motion to adjourn. [2:25:33] Speaker F (unidentified): Second. Yeah, thank you all. Thank you. Thank you. Oh, meeting's normal time, right, in the day next week, right, I mean next month. [2:25:51] Juliet (Chair): It's going to be in the second or something, or I guess I should [2:25:57] Speaker F (unidentified): Yeah, the 2nd, December 2nd. [2:26:01] Speaker D (unidentified): December, wow. Okay.