← Back to MaineScanner

Pownal Planning Board approves Pollock subdivision amendment, reviews mobile home park sketch

2026-10-21 · 2h 35m · Source: October 21, 2026 Planning Board Public Hearing & Regular Meeting (Town of Pownal (YouTube))
Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[0:02] Chair: Okay welcome everybody this is the Wednesday October 21st 2026 Town of Panel Planning Board meeting. This is the call to order. Say what public hearing yeah so we're I'm going to start the Planning Board meeting first and we'll just have the public hearing embedded within it. I'll just follow the agenda first we'll start with introductions. My name is Todd Mellon I'm the chair. Mercedes Poor vice chair. Ryan Stornelli member. Yeah Tim Giddens CEO. We do have a quorum so we'll go ahead and get started. The first order of business is to can you continue on with the Pollock subdivision amendment number three regarding Caleb's Way. We've met the ordinance requirement for the notification of a butters. We had our site walk earlier today. This will constitute the public hearing for the amendment. I don't know there if you if you guys want to say a quick word about the project you can keep it short. We've already talked about this you can have a couple of minutes. Sure thank you very much. Thank you Mr. [1:41] Michael Skolnick: Chair and ladies and gentlemen of the board my name is Michael Skolnick permitting attorney for the applicants. Do want to thank the board for the conducting their site walk earlier today as well as allowing us to amend our application since the last meeting so we can present you with some additional information that you requested. We did hear the board's comments at the last meeting and we revised the narrative and plan based on that to address your concerns. I also want to thank the town's planner who did a great job at outlining exactly what was changed and the status of this project in her memo. Just to go over those just to be brief as well in the narrative itself we did outline the four separate waiver requests that we're going for. Those were the reduction of the 20 foot minimum pavement width to 16 feet, the reduction of the four foot minimum shoulders for the road to two feet, the removal of the shoulders at the wetland crossing itself to save wetland impacts, and then the relocation of the turnaround from 60 feet away that's required by your ordinance to 97 feet away from the terminus of the road. That's also to reduce wetland impacts wherever possible. At this there on the plan itself this plan was expanded to the entire Pollock subdivision instead of just focusing in on the roadway itself. That was at the request of the board and also list the four waivers that we're requesting on the plan itself. And lastly we did hear the board wanted a note in the plan we added. Note 16, which says that if any of these lots were to be divided in the future or any change to the road, then they would have to come back before this board for review. At this point, I think we addressed all of the concerns that we heard from the board at the last meeting. We're more than happy to answer any questions that the board has though. Thank you, Tim. [3:45] Chair: Did you have any comments that you wanted to make before I [3:48] Board Member: open it up to the public? No, I think that everything speaks for itself. I think Natasha's [3:55] Chair: memo lays it out well. Okay, is there any public comment? Having heard none, having heard none at 6.05, we'll close the public hearing on the public subdivision amendment number three. And we will now start the business meeting of the planning board. The first order of business is the secretary's report, approval of the September 16, 2026 regular meeting minutes. Did anybody have any comments, concerns? Yes. [4:44] Secretary: Yes, I just wanted, and thank you both for doing a great job on these minutes, I just wanted to correct, add Isabel Lee to the guests, she should be listed as a guest. The Pollock is spelled with a p-o-l-l-o-c-k instead of a-c-k on page one, and Frazier is spelled f-r-a-s-e-r are on page one, so we'll get those names straight. And then Isabel on throughout the document is called Isabella and her name's Isabel, so if we can just make those name changes that'd be great. [5:23] Chair: I move, did anybody else have any other comments? No, I move that we accept the meeting minutes as amended. Second. That all in favor, motion [Speaker E (unidentified): passes. Is old] business, we'll move on to the Pollock subdivision. Mercedes, I'll have you take over this portion if you don't mind. [5:58] Board Member: First of all, I'd like to thank the applicant and all of their representatives because the notes section on the new plan is very thorough and exactly what I think was missing in former plans for this subdivision, so that really helps us both document what we're talking about and lay the path moving forward and lay a great example. I think I would like to make a motion that finds this application complete. Tim, [6:32] Chair: did you have any concerns about [6:36] Board Member: oh yes, I second. Okay, discussion on that. No, I find it complete as well. Okay, do I have to read the exact motion that she proposes? I think I would. Okay, all right, I will. I'd like to amend my motion and I'd like to make a motion to find the amended subdivision plan for the Pollock subdivision on behalf of Brian and Christine Fraser located on tax map 3 lot 60.05 complete in regard to the submission requirements. [7:10] Chair: all in favor aye any opposed motion [7:18] Board Member: passes okay and then tonight it was nice because we got to see these four requested waivers in kind of in-suit-y in terms of where they were. The applicant is asking for four specific waivers, two related to the specs of the road, one related to the shoulders at that wetland crossing, and then moving the Hammerhead terminus length back from the end of that public road a little bit further to get it out of the wetland. And that was helpful to see at the site walk actually today. So as for the four requested waivers, I would, I would like to, I am in favor of granting those waivers and I will make motions as to [8:12] Chair: their, as to each one. Okay, make a motion for each one. Okay, and then I would, it's, it's nice that Natasha has the quoted part, so I think you probably just need to read the quoted part as the waiver because that is in the applicant's words. [8:36] Board Member: Are you looking at page three? I am, of Natasha's way memo, on the memo. Yeah, go page two. Oh, I was looking at page three. Oh, okay. Yeah, I can do that. Okay, that's a little bit shorter, I think. Yeah, okay, as we talked about last meeting, and then moving forward, I would like to make a motion to waive the geometric standard under the public and private roads ordinance section 16, appendix A, item 2, where in the minimum width of the payment is 20 feet for a minor dead end street 600 feet or less, but 16 feet here is to be allowed. Any discussion? All in favor? Aye. Opposed? Motion passes. I would like to make a motion to waive the geometric standard under the public and private roads ordinance section 16, Appendix A, Item 7, wherein the minimum width of the shoulders is 4 feet for a minor dead-end street 600 feet or less, but 2 feet is to be allowed here. I second. Any discussion? No? All in favor? Aye. Motion passes. I would like to make a motion to waive the geometric standard under the Public and Private roads ordinance section 16 appendix g wherein the shoulders are a requirement under the geometric standards for minor streets figure but shoulders are permitted to be omitted at the section of the proposed wetland crossing in this subdivision in this amendment. I second. Any discussion? No. All in favor? Motion passes. I would like to make a motion to waive the geometric standard under the private and public Roads ordinance section 16, appendix D, article 8, wherein is required that a turnaround is to be located within 60 feet of the terminus of a dead end road for the geometric standards for turnarounds figure, but 97 feet will be allowed. [10:57] Chair: Here, I second. Any discussion? No. All in favor? Motion passes in. [11:10] Board Member: Oh yeah, sorry, no, go ahead. Okay. In terms of the entire application, I would like to make a motion to approve the amended subdivision plan for the Pollack subdivision on behalf of Brian and Christine Frazier, located at Tax Map 3, Lot 60.05, based on the application materials, plan sets, applicant testimony, and the findings of fact and conclusions of law in the planner memo dated October 21st, 2026 with modifications as detailed in the, no,. I think we should, [11:47] Chair: go backwards, go back. Okay. Just briefly and just, make it a habit of running through the conclusions of law. Which is, page four, the brutal part where we just go through each one, okay, and just I'm trying to make a habit of that because in your motion to approve it suggests that we have gone through that which we had it [12:13] Board Member: not which we have not in this case because this is an amended subdivision and we're not talking about the entire subdivision. Do we have to go through the conclusions of law that don't pertain to the actual amendment or do we have to say those are not applicable here? I can just read through it and do not apply, not apply. So still hit them. Okay. Sorry, nope, I'm loving this. Welcome to the dramatic reading tonight. So you'd like to go through the conclusions of law on this one? I'd like to go through conclusions of law and is each one a vote separately? No, I think you can just go through them. Okay. What we found are there, do we have to discuss these as a board or does anyone want to look [13:12] Chair: at these before we start that I think we've all looked at them and that we feel that they are all met? If somebody has one that stands out as a problem, what I want, what I suggest to do is read each one, say what you feel, because you're the one that's gone over this, say what you feel how this [Speaker E (unidentified): how] this particular conclusion of law is impacted by this subdivision are not impacted and then if there is discussion anybody on the board just speak up otherwise I'll just let you run with it. Okay. [14:02] Board Member: Having reviewed both the application and going through last meeting and the site walk and especially looking at the resubmitted materials tonight in terms of this amended subdivision application, I am suggesting the board find that the proposed subdivision will not result in undue water or air pollution. The proposed subdivision will have sufficient water available for the reasonably foreseeable needs of the subdivision. This is only adding a house in an existing lot and we're really talking about the road here so that should not be something that, yeah, oh you think it's an NA, okay, yeah, Natasha did not, but I think you're absolutely right, yeah, she didn't flag this as an NA because the lot was already on the direct one. I think Tim is absolutely right and this is not applicable, okay. The proposed subdivision, again, will not cause a reasonable burden on existing water supply because that lot was existing. This is not applicable to this amendment. The proposed subdivision will not cause unreasonable soil erosion or reduction in the capacity of land to hold water so that a dangerous or unhealthy condition may result. The plans submitted are thorough and in line with Army Corps of Engineers and all of the specs. The proposed subdivision will not cause unreasonable highway or public road congestion or unsafe conditions with respect to the use of highways or public roads existing or proposed. The proposed subdivision will provide for adequate solid and sewage waste disposal, there's plenty of land on this lot, and not applicable. All right, I'm catching up with you, Tim, I'm just talking about the road, seven would be not applicable, okay. Do I have to read it though, 7 is not applicable to this amendment, so it is not applicable. Should we say it is a private road, should we say that, because it's not going to provide, make any more burden on the public services, even though we're extending a road it's not gonna impact, yeah, I'm gonna say that one, yeah, I'm gonna say that one. The proposed subdivision will not place an unreasonable burden on the ability of local governments to provide municipal or governmental services as this amendment is a private road. The proposed subdivision will not have an undue adverse Effect on the scenic or natural beauty of the area, aesthetics, historic sites, or rare and irreplaceable natural areas. The applicant has attended to the wetland issues, and the waiver in terms of the reduction of roast sides also speaks to this. The proposed subdivision is in conformance with the duly adopted subdivision regulation or ordinance, comprehensive plan, developmental plan, or land use plan as their amendment has met all of our requirements so. The question that was the original subdivision. Doesn't necessarily meet that right? No, but that is not the fault of the applicants. Yeah, so on that one the waivers actually make it, you granting the waivers makes it compliant. Yeah. Ah, okay, so it is in conformance. Yes, the waivers apply and that's what I said, right? So it is, yes, okay, the. Subdivider has adequate financial and technical capacity to meet the above stated standards. Can we talk about that for a second? Sure, because I didn't see anything. [18:27] Secretary: I might have missed any application, and I know we were supposed to talk about bond guarantees which would speak to them having that. [18:40] Board Member: Financial capability, the roads bill, we can only talk about the amendment but it's not completely. It's it's built to this to the final layer of surface, gravel, so it's 99.9 built. [19:02] Chair: Yeah, so it's it'd be one thing if it hadn't started. Yeah, they've already built it to the standards, so I don't know that it's important at this point as much as I agree with the comment of us needing to have a performance standard to make sure that money is available for sure. But when you look at the road, the project's pretty much done. And so putting the finishing touches on it shouldn't be a big deal. Yeah, that's the only way I was looking at it. I was thinking about that as well, for sure. [19:43] Board Member: The CO is conditioned on that, like that has to be done before you'll issue a CO, right? It so I guess that's our last of all our protection right 12. Is not applicable to this amendment. 13 is not applicable to this amendment. All freshwater wetlands within the proposed subdivision have been identified on any maps submitted as part of the application regardless of the size of these wetlands. I think this application does a very thorough job of not only identifying the wetlands but explaining the remediation and especially that new culvert. I think 15 is not applicable. Any river, stream, or brook within the within or abutting the proposed. subdivision has been identified on any maps and submitted as part of the application the proposed subdivision will provide for adequate storm water management that is the largest culvert i have ever seen in the opinion of our consulting planner 18 19 20 and 21 are not applicable to this amendment is [21:13] Chair: there any other comment from the board about any of the conclusions of law i think you can go back to your motion [21:28] Board Member: All right, should I make the motion and then we discuss these separate items? Because there is a little bit of, I think there might be some discussion here. Yeah, okay, let's go ahead and do that. Make a motion. I'm going to make the motion to approve the amended subdivision plan for the Pollock subdivision on behalf of Brian and Christine Frazier, located at tax map 3, lot 60.05, based on the application materials, plan sets, applicant testimony, and the findings of fact and conclusions of law. I want to, I don't want to get [22:03] Chair: you through the whole thing. Approve with conditions. Oh, okay, that's [22:11] Board Member: in the last part there. Yes, dated October 21st, 2026, with modifications as detailed in the following conditions of approval. Yeah, would you like me to say these or do you want to discuss these? Go ahead and say. All right, motion. The proposed conditions of approval are to revise the final plan to add a note referencing all conditions of approval. Two, prior to the issuance of a building permit, the applicant shall provide the following to be reviewed by the town attorney and receive select board approval: for a performance guarantee based on a construction cost estimate to be provided by the applicant; b, the inspection fee equal to two percent of the cost of the required improvements or pay an inspection fee equal to the estimated cost of inspection by the town engineer or consulting engineer and see and the form of these funds shall be provided through an irrevocable letter of credit a bond or in cash so [Chair: oh, so sorry.] I second. Okay, let's talk. Yeah, okay, I think that's another ma. Yeah, I think these are options. Yeah, we're, we're talking. Yeah, now we get to discuss. So once we make the motion, now we can [23:39] Chair: discuss. Yeah, thank you for that. Yeah, as we just discussed, I mean, obviously number one needs to be in as part of the conditions, but I feel like number two more or less has been met because of the current condition of the road. So the need for the performance guarantee, personally, I don't think is really necessary. Yeah, [24:17] Board Member: I agree, just as long as Tim verifies that the route has the top layer, so [24:23] Chair: Do we want to alter that so number two would be instead of the performance guarantee language the CEO approves final road condition prior to occupancy permit so they can continue to build before they put the final layer? [24:55] Speaker E (unidentified): I believe so big well they [25:08] Chair: already have I guess they already have the notes on the plans but yeah I think I would I think I would just [25:21] Board Member: leave that point of clarity Tim do they have a building permit and we're looking so this is really for an occup is the is the motion actually say for the issuance of an occupancy permit right sure yeah so rather than a building permit CEO will approve do you have a restated no I'm I [26:03] Chair: would like to amend the motion that number two CEO will approve final condition of the road prior to issue and see issuance of an occupancy permit this is where I always I am I am definitely not a master of Robert's Rules so I'm a little unsure of do we have to if I if we amend that and then can we just say as amended can I make yeah please I don't think we need to do anything [26:55] Board Member: anything with this one because we've already discussed that the road is already built and accepted as we viewed tonight acceptable as we viewed tonight I think that having the road finished is part of my job before regardless and you [27:14] Chair: don't have to say it right okay that's fair okay so we will just remove two all together other I move that why don't why don't we just start over okay can we put in the notes I think [27:31] Board Member: that because we've been talking I just want to make sure that we're talking for the notes in this particular case because the amendment is already built that this financial piece is not applicable to this amendment and I just want to make sure we're saying that very clearly as we've been talking about performance in the notes of the meeting exactly that's what I mean in the notes of the meeting I just want it stated because of the nature of this particular application yes okay right so yes John and [28:10] Chair: then we can and then we can redo the motion okay right yes thank you okay I withdraw my amendment I withdraw my motion [28:26] Board Member: All right I would like to make an emotion I'm feeling very emotional about this I would like to make a mo an emotion to approve the amended subdivision planned for the Pollock subdivision on behalf of Brian and Christine Frazier located at tax map 3 lot 60.05 based on the application materials plan sets applicant testimony and the findings of fact and conclusions of law in the planner memo dated October 21 2026 with no [29:05] Chair: Not making any conclusions of law, we just following conditions. I thought we were gonna keep one. Sorry. [29:21] Board Member: Sorry, go ahead. Okay, with the single modification as detailed in the following condition of approval one, to revise the final plan to add a note referencing all conditions of approval. Which they've already done. They've already done. Yeah, we can take out that second. Do you want to just take out the second? All right, let's just put a period after 2026. Please. Perfect. Okay. [30:01] Chair: Because she said that in the motion, as part of the motion, so I second. Discussion. So I think, I think she, because she referenced it, I think that's all in the record, because we went through each of the conclusions. We did. All right, so that's why that's important to just go through all of those. Yep. Any further discussion? All in favor? Any opposed? And unopposed, approval. That motion passes. Thank [30:47] Board Member: you guys. So if you want to take a five minute break and sign the plans, and then somebody, from the Fraser Group can take them to the, yeah, after her beads and get us the book and page number. Yeah, it's the second page. Sorry. Sorry. Yeah. Listen, plans. I'm sorry. Wait, yeah, that's it. Okay. I thought something didn't look right. Yeah, so again it's the second. There we go. That's better. That's yes.
New Business
[34:38] Chair: Okay, on to new business. We have a sketch plan, I believe, from Shane Brady. If you want to come up and introduce your plan and what you're thinking and all that good stuff. [34:53] Board Member: Did you bring a new one or same one? It's the same one you have it or I'll just talk a little bit about it until Tim gets back. At the last minute, that's the full size. So I'm here tonight to talk to the board a little bit about the project. I moved the location to down by the cemetery in front of my house. That's pretty wild. There's plenty of sight distance left and right. The lot's basically flat. And why I'm here is wondering if the board would entertain doing a site walk before the application, just because I feel like if we do a site walk, it'll be in the middle of winter and you won't, it'll get to see much if there's snow on the ground. And then the next question is, it falls under the threshold for DEP again, because it's not over an acre of impervious surface. And if the board would, based on the condition of the site, waive the requirement for the stormwater management plan, because that's a big factor and the design of the project I [36:29] Chair: Would say at while we're waiting on the plans that at this stage yeah this is purely just informational both really you presenting us with information and that this at the sketch plan phase according to the ordinance were we're not really making any decisions about the future project at all okay so I don't know how much guidance regarding dep stuff like that's that would be down the road a bit definitely not at the sketch okay plan phase we're not we wouldn't be talking about waivers right at This point we're talking about just generally about your plan okay so the plan is what does the plan look like Tim just got back but that is basically [37:33] Board Member: Five double wides with optional garages no that's less than a five acre site the main parcel is 38 acres and we're gonna cut that lot off from it to develop a mobile home park so is this a separate lot from the 38 acres yeah. So this is going to have to be the original piece or the mother piece is part of a previous subdivision. So the previous subdivision is going to have to be amended to create this lot. So this will be the third. The other option is to allow a mobile home park on a parcel with a different kind of dwelling unit, and then I wouldn't have to cut any lots. But I feel like that'd be more involved and complicated than Allen Road. Sorry about that. So if you're, are you familiar with the cemetery on Allen Road? Yeah so if you take a ride at the post office you got one house and then you get the cemetery and then it's right there right before you go up to the top of the hill it's right across the street from where the guy sells firewood park is one walk [40:10] Chair: So in the in the ordinance it talks about are these square footages is that for the [40:20] Board Member: The dark wind is that the area of that the square the square putages on that are shown on each lot includes the buffer so it's the overall density of the park the actual building it there's I'd have to look at it again so if you take the buffers out of each lot they're just over 12,000 square feet so [40:59] Chair: What's what's the 23,000 say for this lot what's that a measure of [41:04] Board Member: That measures but it includes the buffer that's the building envelope inside the actual lot on the sketch plan when the engineer threw these counted the buffers and you're not allowed to count the buffers and square footage of the lots so all that would be corrected on yeah preliminary plan with the correct numbers and the correct amount of square right so [41:48] Chair: So on a preliminary plan, the actual lot would not include the buffers. Yeah, [41:59] Board Member: because I'm pretty sure you can include roadways, buffers, and there's something else that you can include in the lot size. And then the dashed lines inside the lot is the building envelope. Below and then the septics are the like little ghost outlines towards the edge of the property so there are two septic is it one here and I see a big rectangle is that septic yeah that's so there should be three of them so Shane you and I discussed this before that a shared system cannot not be within the lots according to the state regulations so you're going to relocate these septic systems they're not going to be the same as what's on this plan right there the septic engineers are working on it right now it's either going to be off-site like my last submission or the lot sizes are going to be 20,000 square feet and they'll be on-site so this plan is it's a general layout but it's rough yeah I should have the engineers talked about having everything ready for November 4th okay so what do you want from us right now is it possible to meet on the lot and have you guys look at it before [43:54] Chair: four okay I don't know that makes too much sense right I'm just thinking that if it's like [44:01] Board Member: the middle of January or February we're not gonna be able to see the law that there's no on the ground was my biggest concern in the ordinance under sketch plan you can have a site walk yeah I feel it's a little difficult to have a site walk without a plan that helps me understand where the things are that we're looking at so yeah there's a little bit of a taper yeah but it's relatively flat there's three trees up towards the third unit on the left but it tapers back towards the roadway and it goes underneath the culvert to go across the driveway that's off-site Shane are you going to be asking for any waivers so the only waivers that I would ask for or would be the sidewalks again with the lights and then storm water which I can have the storm water plan drawn up and done but given the site conditions I don't think that it's really beneficial or it won't impact without it [45:35] Chair: So, in your buffers, you show trees on the roadway side, but you don't show any buffer. You show the buffer itself, but you don't show a fence or trees on any of the other lot lines. [45:52] Board Member: That would be the other waiver that I'd ask for. You didn't mention that. [45:59] Chair: What would you be asking for a waiver? [46:01] Board Member: For a waiver on the vegetation on common property because we own all the property around the proposed lot cut. So I'm not opposed to shielding it or having a visual buffer on the main road, but I don't think it's an adequate use of money to because the only person it would affect is us. Yeah, but in the ordinance it says residential area, so I'm not sure on it says undeveloped residential. That's where I was confused on the cemetery part of it because I'm not sure how that would be classified or so. [47:00] Chair: I don't know, I don't know, so I think the plan still seems like it has a fair amount of moving parts right now, right. So the other than other than like you're thinking about doing something in this location right, but how and this may be like a general layout of what you're thinking about doing in this location. I think this is it's a it's a it's a sketch plan you're asking for some waivers which we'd be open to hearing about. I don't I don't think at this point it would make sense to and I'm open to opinions from the board, but I don't know that it would make sense for the reasons that Mercedes was talking about to do a sidewalk at this stage. I get that winners around the corner, but does anybody else have an opinion other than Mercedes. I'm just thinking about the value of the board's time, the public's time, it'd be nice to see this [48:51] Secretary: a bit more laid out before we do a sidewalk, right. I agree, particularly wanting to see where the septic yeah surface waste disposal is located would not [49:05] Board Member: sure what the agenda is for next month if I talked about it. Yeah, okay, if I got a complete application and put this on a site actual site plan and had Wayne surveyed out, if I had all that done by November 4th, would the board consider looking at it for the November meeting even though it doesn't meet the one month deadline and [49:34] Secretary: then this would be considered old business at this point, right. So that's two weeks. Yeah, okay, so it wouldn't, okay, I wasn't [49:45] Board Member: sure whether it'd be enough sketch plan if it counted as new or old business. Yeah, we're talking [49:51] Chair: about it, so okay becomes old business, okay. Yeah, because I the engineers are pretty confident [49:58] Board Member: on having a complete packet put together by the fourth. Okay, so then that would [50:06] Chair: Get us into November with December before. Yeah, I wouldn't like seriously Shane, I wouldn't be like thinking about like let's get the thing done first. Yeah, we've kind of been through this, like let's get the thing done well and bring it back before us. And the better that thing is done, the faster things move. But there can't be a lot of, you know, I know you want to have certain waivers and those should be very clear, what exactly what waivers you're looking for, why you're looking for those waivers and then we can talk about what the value of those waivers and board can have a discussion. Okay, everything should be buttoned up, eyes dotted, T's crossed, and the more you have that prepared, the faster things move. Okay, you have to keep asking you for stuff. Would it be all right to do [51:18] Board Member: like a complete packet that matches everything in the ordinance and then ask for the waivers, and if the waivers are granted then I could get taken off the site plan? I didn't, I didn't understand that question. Yeah, so if I just designed the whole project with the intention on no waivers and then if the board did want to grant a waiver I could take it off the [51:47] Chair: site plan or have it. I think that would be a fair way to do it, right, because then you'd have the plan assuming, assume the waivers aren't going to pass, right, because I'd rather have it designed once and not have to change and change. I would, if you design it to meet the ordinances to the best of your ability and then you can always ask for things to be taken away, right, [52:15] Board Member: right, okay, we could make adjustments. So just to clarify Shane, that then if waivers were granted then you would have to go back and have the plan redrawn to the condition that it was granted to, right, but it's easier to take away than it is to add. Because the like if you plan for having the storm water management plan then it's a lot easier to lay everything out because that's the biggest hurdle on this. So I'd make a recommendation that on the board has Shane use Natasha and I for guidance to get all of this ready for you. So once we think it's ready, then we will allow. [53:12] Chair: That would be, I would say that would be a given that you use the CEO and Natasha and follow their instructions. And that makes the process much, smoother for you because they are our advisors. So I would listen to them carefully. Okay. If you want a smooth process. [53:35] Board Member: And then there's also an issue with the existing subdivision because there was a teething to a butters that was done because of property line disputes. Do you guys want to see that or couldn't we or do you want to just see? [53:55] Chair: I think that's probably. [53:59] Board Member: So this is again, this is going to have to be two different applications, two different subdivisions. So the application to amend the existence of division is going to have to include all those changes and those will be either you know we'll look at them and that will that plan will be approved so all of those are captured okay all those lot lines need to be captured and up whatever is approved is the way it's supposed to be on the ground at the time it's [54:31] Chair: approved so tim let me let me ask a question if there is and this goes to you too as well shane if there's any question about not wanting to put the cart before the horse this lot that we're looking at unlike the previous project where it was not a separated out lot but it was a parcel a portion of a lot that was rented out to the applicant in this case this is going to be a separated out lot am I clear about that yeah yes and so is there some question so that would be a separate amended subdivision that would be [55:19] Board Member: an amendment to that subdivision and then this is going to be and then this would be a completely [55:25] Chair: different a new application so if there's any question about whether or not that there's going to be any difficulties there should that project be worked on first before we start looking at this or can those things move along in tandem we [55:48] Board Member: can why don't Natasha and I and Shane sit down and go over the lines that were moved and make sure that it meets everything meets the ordinance and state requirements there and if they're we don't find any issues then I think [56:03] Chair: they can go in tandem okay yeah that would be that would be the way I would do that would be like separating out that lot should be the priority before we start getting too carried away within a totally different project [56:28] Board Member: and i think they can happen at the same time so we'll right yeah i mean we'll Well, procedure-wise, when we're looking at it, when the planning board's looking at it, you're going to have to look at the revised subdivision first and then look at this at the same time. Yeah. So the revised subdivision should be simple. Okay. Okay. You need a plan. Yeah. Correct. Yeah. Okay. [57:07] Chair: Welcome. Does that all sound all right to you? Does that make sense? Yeah, it does. [57:15] Board Member: Use your resources, yeah. And is there anything you guys would like to see on the revised subdivision plan, or do you want to leave it up to Natasha and Tim and you? Yeah, I think we definitely want the buffers, but like this is showing 15 foot space deciduous trees. I think for an actual visual buffer, in past applications we've had staggered evergreens, right? So we probably lot like more of a wall buffer versus heavily spaced small trees that are going to drop in the fall. I am curious too as we're moving forward, this is a very visible lot. So we were talking about no buffers where it's not the main road, but when you are approaching this property it's just a very visual lot, including from the cemetery. And because this actually says vegetated buffer, I think I just want a little bit more attention and clarity about those, the buffers that are going to exist on the two side boundaries. So as it sits right now, the lot goes from our driveway all the way to the post office, and there's quite a good vegetated wall on the property line by the cemetery. And then on the other side of the driveway, which is probably a 40-foot spacing, there's a good row of trees that blocks the majority of everything. Because even our house that sits back in the field, you can only see it for a short window when you pass the driveway. I just can't see it here. Yeah, and you're saying you're vegetated and you were saying I don't want vegetation there, so I just want clarity here. Yeah, it doesn't necessarily solve our issue here because that ownership could change and someone could cut that down in the future on their lot, which then exposes this lot. There is no buffer that's part of the actual lot that we're talking about. So I think we're usually, we're trying to build those buffers on the lot we're talking about now, so using pre-existing on a budding or joining lots would it be easier if I made the lot bigger to encompass the [59:52] Chair: I think I think you should come up with the plan. Yeah, that was a brief like that's the way the ordinance is written, and so the board is just simply expressing what the ordinance actually says. So again, I would I would follow the ordinance with your plan and then ask for any waivers that vary off that ordinance, because these guys are just talking about what is right in the ordinance. Yeah, so that's all okay. So yeah, so when you can get everything together other, we're happy to hear about it. Okay, so I would like to bring up since we were talking [1:00:37] Board Member: About the cemetery, the language in the ordinance, so just so Shane has some guidance on this one, it's on page 73 of the ordinance, 604, c seven or c8, excuse me, c8, and it's a2, but undeveloped residential land that is owned at a residential density of less than half of the proposed in the park, so both of them, and one also talks about residential land, and I think the chain has a good point that the cemetery is not a residential CEMETERY COMMISSION OWNED AS PART OF THE MUNICIPALITY. [1:01:46] Chair: All righty. We look forward to hearing what you have next time, thank you. Yep, thank you. And now on to the other fun stuff. Can I go backwards for [1:02:13] Board Member: one minute I think Shane's still in the room and Tim just because we're just talking we're just talking can you go one can you go one paragraph down from that in terms of buffer strips and then into B because I'm I'm just thinking about the 20 foot the 25 foot buffer because it's talking about a visual screening and the screening shall form an effective visual barrier along the exterior lot lines of the park except driveways and so that 's kind of more my you know just because of the sight lines of this, I just want to make sure I'm understanding, and we'll drive out there, so when you're in buffer strips, but go down to B on 73, does the residential non-residential cemetery feature actually impact those first 25 feet of a buffer, which is I believe the hash marked part of that map? You think the hash marks were 50 feet? I thought they were 25. Right, that's, I'm talking about the first 25, which is not the 50 foot, like because it just doesn't have those same qualifications in B as much. No, so you, I don't understand. Oh, I'm saying all of those, all of it. When it talks about the 50 foot buffer, it has those qualifications, like I double, I triple I, but then when you get to the B and you're talking about the first 25 feet of the buffer, it seems like it's talking about the external effect. Exactly, the effective visual barrier along the exterior lot lines of the park, so I don't see those same qualifications in B that I do in the 50 feet. I don't see the same qualifications, vacations for 25 feet that I do for 50 feet. I think it's just something I'd like to, as we move forward on this, I just want to make sure I'm understanding and we're looking at here, okay. I think it's a point taken, and when we're working with Shane, we can, okay, yep, regardless of who lives there or resides there, yeah. [1:04:57] Chair: Next order of business is the ordinance work that Tim has been working on, so [1:05:25] Board Member: In an effort to keep ordinance work moving along, and since it's the first conservation subdivision is still in our memory, I started working on some things that I had highlighted and redlined in the conservation subdivision that need had been questioned and need some work, so I put this together for that, so. [1:05:56] Chair: would you like me to just run through yeah let's let's roll through it i think we're doing really good on time so i think it'd be well worth spending a little bit on this stuff excuse [1:06:10] Board Member: me so 906 a2 so the this is more a question that came up as to the cart and the horse and which one came first and in statute actually the timeline is laid out so there isn't a lot of leeway there on what we can do and actually i think that if we compare the statute to what is written here we might be over the limit in an area so but i need to flag that with the attorney and ask his opinion on that but i was just pointing out that it cannot you know by statute it needs to be that way so i'm Sorry, I was trying to find where you would say. [1:07:12] Chair: Can you repeat that for me? I cannot by state statute or by state, I cannot multitask, so. [1:07:23] Board Member: Within 45 days after the formal submission of a preliminary plan, should it be 30 days by statute? So right now we have 45 days, and in statute it says it should be 30 days. So 45 days makes no sense because you don't meet twice within 45 days. So that's just an area that needs to be corrected. Yes. [1:07:51] Secretary: I think 45 days appears in other areas of the ordinances too when we've talked about how it makes no sense because you can't get there right but that means you really need to make the decision at the next planning board meeting it this it holds our feet to [1:08:09] Board Member: the fire so this ordinance being complicated as it is really the statute doesn't allow you any more time on it doesn't it doesn't say unless you have a complicated ordinance and this is the state statute this is the state statute and but what it does say is that if all parties are agreeable to it you can extend those deadlines so again that was just a question that came up about the ordinance so i tried to answer that question 906 a 2 within 45 days after a formal submission of preliminary plan Is what's currently in an ordinance, and it should be within 30 days by stat state statute number 4403 3B, so. [1:09:19] Chair: So what you're saying is where we have 45 days it should be 30. Is that, am I correct? Okay, got it, which makes more sense from the way the planning board works because we meet every 30 days anyway. Ran 45 doesn't really do anything for us, correct, so [1:09:50] Board Member: The another question of came up of, you know, when should a public hearing be held, yeah, and in statute it says you're jump, you're jumping now, right? Can the number of days approved in conceptual plan be increased? Statute 44035 decision time limits municipal reviewing authority shall within 30 days of public hearing or if no hearing is held within 60 days of a determined of determining the received a complete application or within any other time limit that is otherwise mutual agreed to, okay, so That's that's kind of answers the question on public errands and no public hearings and the timeline of where they should come, okay, and you say you said conceptual [1:10:48] Chair: Plan but I think you met preliminary plan because conceptual plan is a six month, yes [1:11:01] Board Member: Yes correct, okay, can You remind me the timing of the public notice of a public hearing like this, it just feels very fast all of a sudden. So is it two weeks? It's less than that. Oh, okay. If I'm wrong, I think it's 10 days. [1:11:20] Secretary: There's also public notice has to go in at a certain period of time. It ends up being public notice part. [1:11:29] Board Member: In a paper of general circulation. [1:11:35] Secretary: But the timing of that ends up being almost months, okay, because of the way the papers [1:11:42] Board Member: Operate right now we need extra time to actually get it in the paper which nobody is reading [1:11:52] Chair: Seriously, okay, yeah, right, yes, okay [1:11:59] Board Member: So moving on if there's no more questions on that, the open space section in 908 is confusing and long, it should be condensed and clarified, okay, and if you look at the open space section of 908 it kind of runs to everything kind of runs together, for instance on page 132 under b there's a paragraph that starts out if a homeowner's association is to be formed it shall be incorporated, that actually shouldn't doesn't belong in that spot [1:12:50] Chair: I, you know, you'd you've mentioned that but I may be reading this differently because they're talking about ownership of the open space by a homeowners association and then they talk about the homeowners association, I didn't know if that was directly pertaining to the association's responsibility for open space but when I read that, I don't see anything in that paragraph that refers to open space, but then it goes on to list responsibilities of... [1:13:39] Board Member: Association outside of open space. [1:13:42] Chair: It does mention like the following. So I almost read this as this should be another subheading that didn't quite get made because these the one two three and four underneath that paragraph all have to do with maintaining the association's responsibility for maintaining [1:14:09] Board Member: the open space right and the way that it was interpreted in the Stetson Farm subdivision was that was part of the that criteria in the I through six was just part of open space not part we didn't separate it out from the homeowners agreement so that you know for instance number four the 51 the developer shall maintain control of the designated open space and facilities and be responsible for the maintenance until at least 51 percent of the development lots and units have been conveyed and so on that we were interpreting that the World River Conservation Trust needed to that applied to them as well where it doesn't it only applies to if a homeowner's agreement is holding yes in space right so that's the end of the paragraph there's a colon the association's document shall specify that colon and then all those romanettes apply strictly to that correct previous paragraph so I think it's I think it's okay yeah it's only because it's like right just from the top it can be owned by a land trust you know it could be one two or three and then this is saying if it's an HOA you know you've got that paragraph and then these are specific criteria that must be specified so it only [1:15:40] Chair: only applies to an HOA ownership yeah and so it should all be under that original I the three eyes where it says ownership by homeowners Association so everything we're looking at that paragraph in the following five Roman numerals and that should all be indented yeah it could be indented under three so it's clear that is a subparagraph of HOA yes B3 the original B3 B3I and then yeah and then further yeah I think that works too I mean but then that would be clear that it's it's only falling under the homeowners Association subparagraph I [1:16:33] Board Member: think I think it and you know there are some there's more that needs to be clarified and perhaps shortened under let's see under open space management plan now there is this CII is there anything in those five that does apply to the other one or do they all only apply to the homeowner like do any of these apply to a land trust I Don't see anything there, so again, I mean, you know, because it's not indented and not clear that it's part of, I think it just needs to be more clear. Yeah, that would help for sure. Yeah, it's just we've got way too much nest in here, but that's, there's a lot in here that, you know, could be cleaned up. Tim, that whole paragraph about the homeowners association, does that have anything to do with open space, or should that go over to where we're talking about the HOA? That, well, it's part of open space. It talks about a open space within it, but the open paragraph, I believe, I'm not sure that whole paragraph, like from the paragraph of if a homeowners association is to be formed, all the way through, like that all doesn't seem to apply to open space. Correct. So like, I would, I'm wondering if we take that whole paragraph off or put it in HA. Oh, I think that ties to four in there, right? So it's saying you need to have this HOA form before final subdivision approval, because if it's an HOA and tell yourself 51 of the lots, it's the developer's responsibility, the possibility to maintain that open space to the required, right? So you have to have an HOA, you know, subject to everything that's in there, right? But do you think that paragraph needs to be there, or does that need to be where we're talking about HOA, just the pair? I think like I double, I triple, I, they all need to be there, but when you're actually talking about what an HOA does, that go over to the HOA section, it might be redundant. We have to read them. Yeah, but I think for the purposes of administering the open space, especially on the front end, you need to have like, those are requirements of an HOA to have some sort of governing document to oversee the open space. So it's, yeah, it's dense, it's probably redundant, but it's also you need it to manage the open space. I think it's very confusing because it talks about things other than open space in that area. Yeah, like if I have an HOA, I have an HOA, and I'm going to go to the HOA section and read about what an HOA is. You could just have it say the last sentence there, basically the association's documents shall specify that, and just delete everything before that. Should be covered, all that should be in the homeowner association. We have a very detailed so that then we need to compare this with that to make sure nothing's being left out. John Potter, Oh, but then I think we can reduce this. Yeah. [1:20:19] Chair: John Potter, John, you have a comment. [1:20:22] Board Member: John Potter, This is. [1:20:39] Speaker E (unidentified): John Potter, Okay. John Potter, yeah. [1:21:18] Board Member: John Potter, I think that can be clarified more so under open space ownership. I dedication of open space to suitable land trust dedication to. Dedication of development rights of open space to a suitable land trust with ownership by the private individual or homeowners association. Three, ownership of open space by a homeowners association which assumes full responsibility for the maintenance with open space production deed restrictions enforceable by the landowner in the subdivision, any owner of the separate land parcels of button the open space, or at the municipality do. We need something. I'm not reading that into this, so yeah, so yeah, this whole section just. Needs a lot of work and well I think that actually flies another issue. Three is not specific to HOA only that has like three or four scenarios, so that whole separate that subsequent thing can't get knocked under it because like it ends right or in Mississippi it's saying it could be an HOA, it could be a municipality, or it could be a deed restrictions enforceable by any landowner. So that's I'm reading four different things there, right, maybe five and three, so it's more just HOA, so I think that's. Why HOA is not indent underneath that. Do you think HOA should be like four, like iv? And then if HOA and then you list all of those things because we do require a draft. I think I'm I'm just wondering, yeah, I see what you're saying though because it's talking about that's a good. [1:23:50] Chair: Clean up though. I think I think I disagree, I think I disagree, okay, because what I'm the way I'm reading it is the ownership of the open space by a homeowner's association which assumes full responsibility for its maintenance with open space protection deed restrictions enforceable by any land owner in the subdivision, it's enforceable by any owner of separate land parcels abutting the open space, and it's enforceable by the municipality, yeah, so I think that all that's laying out where what John. Was talking about, that if the open space is given to a land trust then it's enforceable by the municipality, where this is saying explicitly that the if homeowners association is taking over all of these all of these different entities can enforce the protection maintenance of the open space, and then you have again you have that paragraph outlining the risk the homeowners association. Should I or I have. [1:25:22] Board Member: Language saying that it's enforceable by the municipality in these under these points? Or is that expressly said somewhere else? Yeah. Yeah. I was going to suggest it. Let's... Ms. Ellis, no cross with HOS. Right. So, why don't... because we recognize the problem this is a good area I think to get Isabel. Yeah, oh yeah. And if you know again if anybody has an idea of how they would like to see it better just send it over to me and I'll compile it and then Isabel and I can go through this and see if we can figure [1:26:38] Chair: out it okay yeah that's fair better yep she [1:26:44] Board Member: knows this stuff in a level that's beyond me so I'm I'm interested to hear what she thinks of it yeah just cross-referencing stuff more than restating it could work too yeah so the other thing under open space is again C I on page 133 includes detailed standards and schedules of maintenance for the designated open space including maintenance of vegetation describe detailed That's something that the attorney had a hard, the attorneys had a hard time with, is because the management plan that was presented by Royal River Conservation Trust didn't have a lot of detail to it because they're still evaluating it. So there isn't a lot of detail there. So if it says detailed, it's supposed to be detailed. So my recommendation is just take detail out. So does it include standards and schedules remaining? Or either that or we'd describe the details that need to be in there yeah [1:28:20] Chair: Yeah even if it's something basic yeah we've got something yeah [1:28:32] Board Member: I don't disagree with that I just think that when this comes up again when another conservation subdivision comes up we're going to have to work with the land trust a lot sooner than we did this time and yeah well the idea of like when is a detailed plan do like do we need a detailed plan right away or is it saying at some you know at a certain point in the process as we expect a detailed plan oh you know yeah it says underneath that and legal review it has to be Reviewed yeah by legal and it also says prior to final approval the planning board by the plan of board the applicant shall submit for review by the town attorney any restrictions covenants conservation easement deed restriction homeowners association documents or other legal documents excuse me for not going on the whole thing the key there is prior yeah I think we have to remember that because honestly the last three months have not been easy yeah there's a lot there were a lot of things that The attorney did not agree with in the plan or something specifically that he didn't agree with, and again the homeowners agreement wasn't detailed enough, and there were other things that came up that were flagged, and that needs to be there according to the attorney. That plan already needs to be amended. Yeah, that was, I mean, that was one that kind of stuck out to me is like that we never actually had a draft of a conservation easement for the open space, right? We just had sort of a generic one or two page management plan, but it should have been the actual conservation is what they plan to file, right, has a deep restriction on the property versus like here's conceptually what we're going to do with it. So my recommendation going forward is we move legal review into earlier into the process, and also we don't approve, we don't sign on the dotted line until it has had all the reviews, it's all finished. I know we liked, you know, we were trying to move the project along, but it really, the project just started, so it really wouldn't, and we would have had time to fix the plan of other rather than having them come back and amend the plan. So you're saying there's enough issues now they might have to do that, they are going to have to amend the plan if, well, in the future. I'm wondering if working with a third party creates extra complications. Are future applicants potentially just going to put open space under homeowners in the original plan, and then if they want to donate it later to a land trust, they would then amend it then, and then they don't have to have a third party hold up the process, like I don't know. Yeah, I think it's no, you're perfectly. It should be up there, though. Yeah. Yeah. I think that the town can negotiate a relationship with whatever border the landfronts have management agreement. reason. You're going to be able to read to certain details. Yeah. Then, the town fine tune that. Want to get that prior agreement done, has to be part of our recommendation to get the competition together in the future. Yeah, what I wonder if there's, we're kind of creating a, in some ways, a little bit of guidance document for open space management. If the lawyer is going to have consistent concerns about a homeowners agreement. Do we have a guiding kind of document for homeowners agreement that the lawyer will address? Whatever the lawyer, you know, would potentially find, it doesn't have to be detailed in every section, but what, you know, what the things that are holding up the lawyer currently, it can, you know, provide guidance so that they can get through the process quicker and not have a lot of back before provisions, but the, I mean, if you look at the owners [1:33:22] Chair: Association documents, that should be a relatively, regardless of us passing a project like that, homeowners association is literally a document that could be altered and that shouldn't require any further board review, excuse me, so I don't, I don't know that I [Speaker E (unidentified): see an] issue with us saying like for certain things pending lawyer review, I don't know that has to be buttoned up because that's just they're arguing about words, but I think if you [1:34:09] Board Member: put the open space in a homeowner's agreement, then it's going to need a lot of yes, yeah, if we're getting back to that, yes, for sure, okay, and I think too when if it's going to be a homeowner's association with open space, they still need a management plan, and so I think it's almost worse for a homeowners association to come up with a management plan for open space, so I think that's especially when we want a little bit more guidance or a doc, because it's one thing for Royal River to do it, 's another thing for a nascent a homeowners association, even one opportunity to oversee them, can we strike that, like we probably had this conversation, maybe we had to, yeah, allow that, I mean, what if they don't have a partner, yeah, we can't make them sell land to a third party, well, they're donating, yeah, but whatever, I mean, I don't, if that's a true independent third party that can administer it to a standard, right, so if like royal river [1:35:14] Chair: with maine farmland trust it could be, but if they don't like if it's a situation where it's, yeah, you don't want it, if you can't find it, then yeah, I mean, maybe we tear this, like in the event [1:35:27] Board Member: that you cannot find a suitable third-party land trust, yeah, we will consider an HOA, but that should Be kind of that, I mean, it does, it does, I mean, this idea of what do we expect from a detailed management plan of the open space, are we, I mean, obviously there's things we would like to be done with open space, but in a way is it really our place to be super hands-on and what and how they manage the open space, in that we're saying you can't build on this land and it's part of the HOA, but like how much should we be telling, if as long as open space is not building on it 's technically open space and Like how much should we be really telling them this is how you need to manage this open space, you know, like the buffer zone areas I can see there's a management thing, but the open space in general, like we said you couldn't build there, it's preserving that area for wildlife, and there's potentially even some things you can do besides that, but like is it our place to say to be really hands-on the open space no matter who is Controlling comprehensive plan, it talks a lot about open fields and fields have to be mowed, and I think that's something where that and I know Royal River struggled with like how often do I have to mow this, I think that if we're talking about open space and we're aligning it with the concepts of the comprehensive plan, something that's existing as an open field right now, I think We would want to say like why, but I'm saying if their management plan was right now this is a field but actually we want it to become a forest, we don't want to mow it every year, why aren't they allowed to let that become a foreskin, why are we forced to leave it a note, you know, well I think the point of a comprehensive, I mean a conservation subdivision was we were trying to preserve elements of this town in alignment with the comprehensive plan, and I think that is sight lines, and I think that 's what was supposed to go into the narration of a conservation subdivision, so I think if you know, and I think especially if you look at some of our recent properties like that was the whole selling point was those open places that we were trying to preserve in this town, so I think it Also is very much related to the property that they're on, but I'm not sure I'd want to say you get to do anything with it, especially after we work through a conservation subject I'm not saying they can do anything with it, but I'm saying, like, so I looked at is preserving undeveloped, like undeveloped land versus open space. To me, I was thinking more like they're not building houses on it, so it could be an open field, but it could become for like [1:38:17] Chair: That would be like, I totally understand what you're saying, but this kind of gets back to [1:38:23] Board Member: That's their management plan. Yeah, it's saying like, I'm saying their management plan could say we want to. Yeah, that's fine, so that could be their management plan, but that's [1:38:33] Chair: What they would say is their management plan. Yeah, I think John's idea of having the Conservation Commission come up with some level of detail, that some minimum level of detail that we as the Planning Board can present to an applicant, one that we don't have to come up with. I don't, yeah, so we'll let somebody else do what they feel is an appropriate plan, but it should be like the minimum. Getting to your, yeah, and then they can do whatever they want after that, but they, these are the minimum Standards for maintenance that the town wants applied, and then and then we can go from there. But I think that's a great starting point because I do think you need some [1:39:30] Speaker E (unidentified): Level of detail in the management plan [1:39:37] Board Member: And exactly, but how much I don't know, that's saying detail Will we've had enough. Yeah, we'll make this somewhere like there might be a main standard or a federal statute, like because look at five, right, so it's talking about if you want a timber harvest you need to have a forest management harvest plan defined by Title 36 blah lot, so somewhere else it exists and tells you what a sufficient harvest management plan is, so maybe that exists for conservation management plan or open space management plan, so that's probably the easiest thing is to see if There's something to reference progressing a riot concern once you Apply for something that's covered finance involves some kind of regulatory process which is now. So your desire, of course, if you don't have a memorial card, may not be intended for reference in the conference. It may not be compliant. If you just want to be able to feel it, then don't suffer from it. You just want to do it for it. But once you've found the registration of the Planning Board, then you can talk about it. You don't want to do it, you don't want to suffer about it, And you can do it as you want. That being said, I think that the land owner who is donating the Land or provoking the clan needs to have some say. Yeah, sure. Yeah, I mean, I like what you're saying of like if you are going to, you know, cut trees on it, you need to follow a forest made plan. If you're going to do agriculture on it, you need to follow an agricultural plan. But also this idea of like, yeah, in some ways I'm like, well, if you want to just have it be wild like that in it, that is a plan itself. But like not that you have to, if it's a field now you have to keep it a field. They're, you know, Like we're preserving everything the way it is. Exactly, it's like no, land evolves over time. I think it just has to conform with the plan that they present us. And the thing is, sometimes the plan that they present us, and I think we've seen this, has certain features, and some of those features do need to be maintained. So if they're presenting it on their plan as such, I think we have to, I think it is incumbent upon us to say, okay, who is going to do this let's move on to your next item okay a lot density in section 908 needs to be clarified i think brian did a pretty good job in the midstream of the process but i think that if it was more clarified in the ordinance it would be a lot easier you know to go through this process and there are some things that we're still questioning even as we're going along such as the calc one the calculation used in the minor subdivision my question is how strict or of an interpretation is required i.e can an existing developed lots be used or ignored? Does the site distance for a private road need to be used or ignored? So those were questions we were trying to hash out during the middle of going through this, and I think if the ordinance clarifies that it'd be a lot better for the next one. Yeah, that almost seems like its own little hour to go through and debate and talk through, because you get could [1:43:09] Chair: we have. Yeah, and we could go on for a while with these. I mean, we all have our opinions, but I think maybe what it would be helpful if it's possible is to have somebody like Isabel work what she feels is appropriate for this sort of ordinance. And this is, she may look at this and say this is oddball and it really needs to be hashed out, but I think if she actually gives us an outsider's, we're pretty embedded. I mean, we all were involved in writing this ordinance. I'm wondering if having somebody like Isabel read through these questions, come up with what she feels would be appropriate, and then we can look at it and at least from the planning board's perspective we kind of have a place to start that was developed by a professional, not to say that [1:44:20] Board Member: the ordinance wasn't what it was. Yeah, I mean she could provide this is my recommendation, or she could provide two things saying if you want to address it x y and z way then you could do it this way, and if you want to address it abc way you could do it this way, and then we can have some back and forth and which one we want, but it's essentially a second opinion. Yeah, on something [1:44:46] Chair: that was given to us when it was given to us. We read this and not that we rubber stamped it, but there was a lot there and we took it on faith that it was all buttoned up, but there's something like this is never going to be perfect on the first try, it's just not possible. Yeah, [1:45:11] Board Member: because we had contemplated the existing laws, yes, right, and so it was going to be perfect first. If you're keeping the lots can you pretend they're not there and then they stay right, I mean [1:45:20] Chair: that's kind of the thing where it's like well yeah probably not. I don't think that you with [1:45:25] Board Member: that language something like that, like each of those scenarios can be explicitly stated, that's our issue like across the ordinances i think yeah you can just say strictly follow or not I mean if you don't strictly follow it you're going to be doing different things for different everybody applications and that's not good I don't I don't think that 's a good practice to get into. Strictly follow would exclude you from pretending a lot doesn't exist and a house doesn't exist, like you can't put a line through it, right. Yeah, which is we're going to do a minor subdivision and you had a road going through your house, the road go you well we thought this actually with I guess but the victory thing right, and that was the reason you couldn't do it. You had 600 feet of frontage but there was a house in the middle so you can't just so I think yeah maybe minimally for now just astericate but strictly follows maybe one clean way to close Yeah, I mean that was, yeah, I know we've come back from, but yeah, the idea was what could you actually build under the current rules? And if you're doing stuff ignoring rules to throw in more lots, then it's kind of like, no, you can't really build that many. Like the point, we don't want you to spend entire month, you know, on this thing. It is a quick sketch to get an estimate of how many lots you could build. But like, yeah, you can't just pretend that all these other rules [1:46:56] Chair: rules don't apply. Yeah, so the thought by the board is to follow that the minor subdivision [1:47:06] Board Member: ordinance strictly. I think so, but I mean I'm still interested if there's an outside expert who has an out, you know, a way that it makes sense, but yeah, maybe the easiest thing is to just be strict [Chair: and then I] don't think so, right, because you want to follow, yeah, what was there before, that was our intent. Yeah, because we'd be wavering to get more, which is not really what the intent was. Yeah, right, if you, if you're following it strictly, you're not making any waivers, so you know where, if they were coming in for a minor subdivision, you might waive the road width for one, yes, or something like that. If you're, you're thinking of this as a strict guidance, then you're not waving anything. Okay, so what we're really talking about, I just want to pause because I want to make sure that I'm understanding what we're really talking about is when they're splitting up those lots in the imaginary world according to the miner, they can't be building on unbuildable land, existing lots, existing houses, or roads that could never be built, but they can be using all of the open space that they then will have to conserve later in order to get that final number. I think that's a very fair way to approach it in terms of really looking at the land that they could build on. So it's almost like that you could be building lots on. Yeah, I just wanna make sure, kind of summing that up. Think that somehow, you know, maybe just the word strictly in there would clarify this. Yeah, do you think all of that is lined out in minor, like do you think all those rules are in minor, like if we're strictly, is it, is it really there? Not clearly, but mostly, like because that's what We went through like we were pointing to those things like you had to chase it through other areas so like you had to go to that chart to see net residential it's like oh but it's 90 thousand square feet but you know twenty thousand of that is a wetland in the corner remember that so it's like so it's there it points you to it but you had to go and find it but it's not like just go to that section everything is outlined scattered still so the other thing I had under lot density is the lot size under 90 000 square feet needs to be clear i.e when exactly do we require the use of an advanced wastewater treatment disposal system should it be tied to soil conditions should a contingency plan be required for lots of a half an acre under lot density in section 504 needs to include language to include this clause that's from the attorney because that's what needs to be amended the way the attorneys interpreted the ordinance what page is what page is that bit on but who typically approves any waste management system is it you know like so the problem is what the if you go to you [1:50:30] Chair: said it was 134 free egg so you have it right in front of you yeah can you can you just read [1:50:45] Board Member: that what it says the minimum lot size may be reduced to one half acre as long as the applicant submits a plan for an advanced wastewater treatment disposal system so the attorney's [1:50:57] Chair: interpretation was literally yeah so anything under 90 000 square feet would require an advanced [1:51:05] Board Member: enhanced water wastewater treatment system well I'm just the you're saying it with any house though like in order for someone to move in somebody has to inspect right the system so or in 502 yeah our minimum lot size is 90 000 square feet yeah anything below that doesn't qualify for real and what this is saying yeah clean it up make it consistent no right no what this is saying is the minimum lot size may be reduced to one and a half acre as long as the applicant submits a wastewater treatment plant anything under 90 000 square feet not down to a half an acre is the way I think it was meant to be needs to have a wastewater treatment system advanced sorry so that's the literal interpretation of that so I actually have been working with the attorney already on trying to fix that [1:52:21] Chair: I'd be interested to just see what that's got to be fixed obviously and I presented a couple of [1:52:28] Board Member: ideas and he got back to me today saying that he would prefer that be strict stricken out of 908 completely and be addressed in 504. So I stared at 504 for about a half an hour and when it got up and took a walk I don't know how you can do it. I think this is an Isabel thing yeah. [1:52:58] Chair: No that would be crazy to put it in 504 that's that's what he his suggestion. I would that gets back to the problem that Brian was talking about with the minor subdivision where bits and pieces are here or there. The only way you're going to have a minimum lot size under 90 000 square feet is literally only in the conservation subdivision. So I would I would say anything about that under 90 000 square feet should be under the conservation subdivision. [1:53:37] Speaker E (unidentified): Do you think what. [1:53:40] Board Member: about the global home parks do they have what are their requirements under their i know but do they have yeah like step what 's their smallest lot side and what's Their septic requirement square feet or you can go lower than that with city water what's what. Yeah what's their septic requirements for things if so if the septic is on the lot if it's only. One then it needs to be 20,000 square feet which is the same state requirement for a house yeah. The state's requirement for a minimal size buildable lot is 20,000 square feet. We require more, and that's the other thing I've got to get to that the attorney pointed out. It's the reason why we require more is under 504. I didn't finish that, but it goes down to 5,000 square feet if you have public water and sewer. So that's in state regulations. Yeah so the table on 504 like at the top says minimum lot size with on-site sewer and water right single family dwelling is 90,000 square feet so I think to Todd's point keeping it there either that you add another column for conservation subdivision versus in the table or we keep it there but yeah to clean it up to anything less than 90,000 square. Feet requires the advanced waste water so what Ben pointed out to me when I when we were going over this he said the next page 41 be minimal net residential area if you read that paragraph how does it want anything less than 90,000 square feet because we want to preserve our waters and so it's the conservation Commission the conservation subdivision is contradicting what is there but I. think we're balancing that with the amount of open space that we're preserving around that. Like I think that's the whole point. So I think that whole idea that this is within the conservation subdivision, and I think me and Isabel is the person to do this, but I'm wondering if we map it out in 908 but we have a reference to in 504 that says except in conservation subdivisions, because I don't want to have the specs in two different places, but I see not having some kind of reference and having these very strict things, because I think it this is only going to happen in a conservation subdivision surrounded by 60 open space, so to defend Ben and myself, yeah when you cluster septic systems together, that's where you get the pollution, right? But that's why it's gonna be advanced, so every system is gonna be an advanced system, but not everything under 90,000 square feet, but is every conservation subdivision? Oh, I think yes, I think. But some of them are not going to be that small. Like it's only when it's going to be that small, right? It doesn't say that, because right now the plan says only once you get to half acre and under. It doesn't say that. No, it doesn't. I think that was, oh, that I thought it did. [1:57:03] Chair: It doesn't. Oh, it needs to literally, it doesn't say that, but we're not allowing anything under a half acre, so the right half acre is the minimum lot size in the conservation subdivision, but nowhere else, nowhere else other than mobile home park. And so I guess the question is, do we set some sort of standard, do we want to keep that, so if it's under 90 000 square feet [1:57:33] Board Member: in advance, because we are. I'm wondering though, with this idea of, I'm interested, if mobile home parks are dense and they're addressing the septic issue there, like whatever is probably acceptable for a mobile home parks at the equivalent density, we should allow in a conservation subdivision, not have it more onerous necessarily than a mobile home park, because the state is determined that whatever you know requirements of mobile home parks, that is an acceptable septic system in that density already. Yeah, so I'm wondering if we need, if there's not like advanced wastewater treatment disposal system language in a mobile, a mobile home park, why are we requiring it potentially in this situation? So there could be some instances where somebody would be proposing to have a mobile home park in an area Where soil conditions wouldn't be added. Yeah, for that. Well, that's what I'm saying, like, can we steal that, the in some ways the requirement language in our mobile home park and apply it to this? So like whatever mobile home parks requirements are around what the soil is and da, we kind of can use that as the requirement for a conservation subdivision. I think the other thing in a park is that if your lots are down to 20 thousands per feet, you have to have some type of a water supply of private water supply. Yeah, there's a well that's supplying all the homes. There's [1:59:18] Chair: here's here's an expert. I'm actually sorry, Shane. Yeah, what I'm what I'm gonna do is I think what's great what we're doing right now is flagging these potential issues, but we are definitely not going to be solving those tonight. So why don't we keep rolling through these, and then I think Tim, because we're starting to come down to our deadline of what we need to get to the Select Board to get on the town warrant, we should really start flagging the ones that this has got to, we got to hammer this one out, we got to hammer that one out. This is one of them? This is one of them, agreed, 100%. So let's create a list of the things that we really need to hammer out, and then if we need to, which seems likely, and we want to do a workshop, we can take those that chunk and really get it finalized, and hopefully have Isabel look at it prior, and then we have something that we really work with, because we're we're not going to we're not going to solve all these tonight, but let's, oh yes sir [2:01:14] Board Member: we will approve to go to. Okay, got it. Yeah, okay, I don't know if we're there yet. Yeah, I was just going to say, but we can give us a yes. So I've been in communication email with Isabel, and Isabel's going to watch these meetings, so she's hearing us right now, so yeah [2:01:42] Chair: we could put the definites on there. Okay, yeah, we can do that. And you're out, we're gonna be out, have a good night shortly. Okay, moving down the list then. [2:01:58] Board Member: I mean, that's a definite, we need to do something there. Yeah, moving down the list to get through it. Should there be a second site walk before the final approval? I, we had a site walk in The 20 inches of snow and didn't seal it. I don't want to, I don't want to do a mandatory site walk though. I'd rather have site walks be optional if then, yeah, that then required because there's certain times where it's like, no, we know this property and we know this project and we don't need to do a second site walk and it just adds more time and delay, and then other times where, yeah, maybe the first time we went out and it was completely different conditions and we want to do it. So I, yeah, I'm, I'm hesitant to require it. I think you can have like a full point of that, you know, says the planning board will, you know, make a determination if it, you know, a second site walk is necessary. I think you can pick a lot more up if you see pins on the ground or, you know, flags on the ground, which we didn't see. I, yeah, I agree, but I also don't want to give everybody more work when it's in the conceptual or the pre-application part of that, whatever this ordinance calls it. You don't see that because they're not even, yeah, and that's when we call for a cycle. Yeah, we should definitely give ourselves the option though so someone can't push back and say, oh, this isn't, you can't make us go back out and do all this. So we should definitely say at our discussion if there's material changes, but you, we have to have a public hearing in the final. Yeah, why not do like we did today, schedule a site walk, public hearing. Yeah, I would, I would put a may, yeah rather than a shell okay i think especially if the site plan changes significantly and if these are continue are going to continue to be large i think for public transparency a site walk is never having the option of a site walk is never a bad idea i'd rather be able to say no we don't need it rather than oh shoot we really do and we can't make them do it We should have had one. Yeah, we, I think it probably would have been. So should survey pins be required in the ground before final approval? I would, it's just past practice. Yeah, I would say so, because right now it's not. Yeah, I would say so, whether or not we're doing a sidewalk or not, whether we're doing a sidewalk or not, we don't require survey pins to be in the ground, so that's all done after approval and those are the lot lines that are on the final plan. Okay, again, legal review should be part of 907, I believe, which would put it back. [2:05:06] Chair: What is 907, review procedures in the final? It's not the final plan, it's in the final plan, [2:05:13] Board Member: in, and where is it now, Tim mentioned after It's open space. Oh, okay, I see performance in 908. Yeah, so we would have saved a lot of back and forth and a lot of time if legal review happens sooner when, you know, the final plan gets here. [2:05:39] Chair: Here, have that reviewed. So it does say under 908, the first line is prior to final approval, the applicant shall submit. Should we just change that to must? Shall is must. Yes, shall, okay. So with the, with the site walk, then may, it should be May, shall. So they should have, but I think what we did is, did we have a, they, was there a condition? That's what we did, we did a condition and legal review. [2:06:33] Board Member: Spotted a lot of things, or, you know, a lot of things that were not right, they didn't think were right, and followed the ordinance. So if that is reviewed earlier under final submission permission, the attorney will have a chance to review that the same time we're reviewing it. [2:06:54] Chair: And those will get flags sooner. So I guess we, because it says prior to final approval, everything should have been reviewed by the town attorney, but it's actually our fault for not making sure that was completed. So that was, that was a, excuse me, a rookie misjudgment perhaps by us. I don't think it's a problem. I don't know that it's necessarily a problem with the ordinance, you know, the applicant would need to submit their documents because I feel like at that point our mission as the board was to. Try and finalize the plan so that they could move forward, so. [2:08:12] Board Member: I don't want to spend a lot of time on, I just recognize that it's, it needs to be done sooner in the process than the end, so. [2:08:22] Chair: So you're suggesting, but if you put it into, I guess what I'm saying is if you put it into 907 procedure for the final plan, for the final plan, in that you could put in that list, just move it to that because it's basically there, but it's just in a different location. It's for, yes, but it's, it's, it's basically, it's hidden. It's one of those things where it's hidden deeper. Right, but it really needs to be done sooner at the final plan, yes, according to the existing one. [2:08:57] Speaker E (unidentified): Okay, yeah, okay, so let's do that. Yeah, so. [2:09:13] Board Member: that's you know that's another isabel question is okay what do we do here's the state stash and could this be changed okay so there needs to be an escrow account set up to pay third party review peer review consultants and stuff like that yeah it was difficult this time because we 're supposed to pay we're supposed to hire the consultant company but we didn't have any money so jim ended up giving us a check and we you know for it knowing how much it was going to be we cashed the check and then we paid the consultant, so there needs to be an escrow account up front at some point and I think I put in it should be, what should the number be, 906 is what you propose, 906 A is what I put in there [2:10:18] Chair: but what should the number be? Yeah, so I think, and should that be, that is a good question [2:10:25] Board Member: I think that we can pick a number, okay, and anything that doesn't get used gets returned, okay, yeah [2:10:35] Chair: That's kind of what I was thinking, I mean these are million dollar projects and it [2:10:41] Board Member: can be worded in a way that, you know, once it gets down to two thousand dollars then it needs to be replenished back to five thousand dollars or whatever, so that's that, I've seen that before What was the number, Marcia? I don't say double, I mean maybe a conservation easement, an HOA That's a lot of legal review plus like DEP, that is right, you can pay, I mean all that can be paid out of this, but this is more to cover the as we're going through the process, these are the, you know, the town has to spend money and it's not necessarily the final but it's throughout the whole process, so if you wanted, if you want to make a number for the whole project then you, we can go right ahead. Yes, they do. Yeah, that's another reason we've been pushing it more. [2:11:43] Chair: I don't know if the town attorney just sent them a bill or they send the town a bill. [2:11:48] Board Member: The town? They do. What did the attorney charge us for? I think he's at $200. I'm not sure. $200 something an hour. Hour, what has he charged us so far? I don't know if we've got the final bill yet because he's not [Speaker E (unidentified): done, yeah] I'm, you know, I don't know if we're complete with the plan or not, but North Star Plannings, we separated out all the bills and North Star Plannings for Stetson Farm. It's over $12,000. But that's not built into being recouped in here either. No. No. That's the cotton that's doing business. Yeah. So, you know, that's something when the select board is going through fees, they need to look at that. Yeah. Maybe for a conservation subdivision, we should be grudging more. Yeah. Yeah. Yeah, certainly. Okay. Yep. I think that's a good idea. All right. Moving on. Add amendments to subdivision or 902 suggestion. So 902 is list the types of subdivisions that we have. It only has two. It doesn't deal with amendments. Yeah, subdivisions. We need to find, we need to put in something that deals with how do we, how do we handle amendments to subdivisions. So I think that can, this question can go on for a long time. That's why, right, we're not going to do it, so I just pointed out. [2:13:39] Chair: This is one I am going to put down on. This was definitely needs to be looked at so [2:13:51] Board Member: moving on. Consider adding or the requirement of a sprinkler system as an option under 9088. That would be instead of or in lieu of a sister in or fire upon. Other towns, and I put in a link there to Freeport's ordinance on it, other towns require sprinkler systems in developments. We're not, but we're not requiring spring system, requiring it as an option if they don't want to do something now. Yeah, that makes sense. Fire pan, yeah, fire pond, the cistern, or yeah, sprinkler, and you know they have to be monitored, they have, yeah, as well the fire department thinks that's an option of equal, you know, value basically. Then yeah, one might as well give it the option and that they can use it or not. And I asked Jesse if he would be okay with that and he looked at it and he said he would be okay with it. He'd want to tweak Freeport's ordinance some but, you know, one advantage that he has with the cistern is it's there for the neighborhood. Yeah, so well yeah, that's interesting. Yeah, sprinklers to fail like the pump's dead or something, there's no power, it's a maintenance thing. Yeah, so you have to be sustained. Yeah, so which one is cheaper? Like aren't sprinkler system, he's super expensive. It's gonna be expensive for the developer. Yeah, he's gonna have to put that in up front. Yeah, a sprinkler system can be paid by the whole world. Yeah, that's interest I don't know, maybe we shouldn't give it in the option because the developer should be like I get to save money and we have a less some a system that doesn't actually that helps less [2:15:40] Chair: People to be honest, I like the idea of having a cistern, yeah, because it's a neighborhood thing. [2:15:46] Speaker E (unidentified): Yeah. [2:15:50] Board Member: I that was that was a question actually from Peter, so that's why I put it in here. It's fair subsections, I know eight are labeled wrong. It's late, maybe we should quit. [2:16:42] Chair: Eyeballing it looks all right, I'll do some thinking on that and that's that's a [2:16:51] Speaker E (unidentified): Just an edit job. [2:16:55] Board Member: Right, it's like yeah, okay, so sections 909 through 912 applied for both minor and conservation subdivisions. Some of the language or requirements are repeated or it makes it sound it's only part of the conservation subdivision, so there's we just I need to go through there and flag those and pull them out, and then I think we need to figure out a way to number this so it's obvious that those sections go to both, you know, it can be in the heading of the section they apply to both minor and yeah, okay, Conservation, because that was confusing a lot of people were putting that in with the conservation subdivision rather than and not putting it in the minor stuff. Like that Tim is like get a clawed subscription and been used the best model, like it will spit that, it'll compare and renumber and suggest all that stuff. I'm not supposed to use that. No, yeah, it's count policy that saves so much time and effort. Here talked it, oh he's gone, you could put it in the car like a man that he said, you know, Yeah, exactly, give it this whole thing and the ordinance and it'll just So 910a needs to be created. The current town attorney requires an irrevocable letter of credit for a performance guarantee. All performance guarantees need to be approved by the attorney and the select board, so why don't we just fix that instead of saying bond or that, it's just a record that way. There's like Jim already went out and got approved for bonds, yeah, when the attorney said no, I don't want that, I wanted them, so it was confusion. [Speaker E (unidentified): Okay, it's] Easy enough, and throughout the entire ordinance bond is used in the wrong context, yeah. So that needs to be looked at. Oh, 910D. That should be 9-11, in my opinion. [2:19:28] Chair: Oh, yeah. It literally says final approval. If you turn the page, 9-11, final approval [2:19:37] Board Member: Approval of reserved. Yeah, so I think it just never got plugged in there. Yeah, that's fair. Nine ten D one upon nine ten, so it's D one under final approval and final violent upon completion of the requirements in section five and six above. Where's five and six? Oh yeah, right, I think that was cut and paste. Yeah, from somewhere else and I don't know what it means. [2:20:18] Chair: okay yeah so is that 's potentially an isabel thing yep okay and [2:20:30] Board Member: You can see that I've highlighted on mine, not on yours, that throughout this whole section 910 the select board is called the select boardman. New speaker Yeah, DEP is labeled as the Department of Something Else. Improvement, yes. [2:20:58] Speaker E (unidentified): New speaker all right. [2:21:03] Chair: So as always, thank you. So what I'm going to propose that we move forward to then, I'm just abbreviating this Tim, I think you'll get the gist in order. Well I think I marked the first two ones but those are more clerical things, but if you want Isabel to review those I'll put those on the list so under just [2:21:45] Board Member: Take this and do the check marks on yes [2:22:00] Chair: Yes so open space [2:22:08] Secretary: Yep and then I have both one and two [2:22:16] Chair: I think adding may to a second sidewalk that clerical [Speaker E (unidentified): Review] Survey pins in the ground yes but that's clerical but you agree yes legal review yes that's just moving. Do you want Isabel to review that? The legal review section should be part of 907 and we need to figure out where we need to put it. Okay so I'll put yeah I'll check that a check is yep for Isabel yes let's do it escrow account I'm going to put that as a check yes it'll be interesting to see what she talks about for add amendments to subdivisions to section 902 Tim had a suggestion but we Should have this I'll review that adding the requirement for spring sprinkler systems I'm putting as a no and just leave it as is you can always revisit I Don't know you didn't mention 909 the variances and waivers is very broad just saying just saying [2:24:16] Board Member: There's a lot of leeway there and you know this came from the attorney as well there's a lot of [2:24:21] Chair: leeway there that legally may not okay let's let Isabel look at that yeah and 908 is that a clerical thing that's town attorney requires irrevocable letter of credit or is that just like [2:24:43] Board Member: Put the words in I think that's just put the words in yeah [2:24:48] Chair: That's just the words I think just moving 910d to section 911, it's just moving words. And yes you may want is about to look at 910 D1 to figure out what it's supposed to say, right. Yes I move that we do those things. Second we submit those things to the select board. I love you I just emailed one other thing on dry boys I [2:25:23] Board Member: don't know if we want to get into it tonight but maybe next time, but I think that one's important too so we don't see what we've been seeing the last few times. Yeah it's a closed loophole so I just like some adjusted language to the definition and then tying it all together at the start of subdivision to make it more clear that an access way serving two lots or less that should be clear is a driveway, it doesn't afford road frontage just doesn't work, and just ties like the four different disparate definitions together into [2:25:53] Chair: to succinct. Yes I would I would agree to 100 that we should look into and clarify throw driveway right of what a right-of-way is. Yeah I didn't have to go after right away but [2:26:09] Board Member: that's another but that's kind of implicit right away has to be from one person to another. Yeah if it's on your own mod doesn't work and then just driveway road private way all these things are interchangeable so they need to just loop them all under like access way and just tie that across. I think this might be a good discussion to have with either Isabelle or Natasha I mean there are [2:26:34] Chair: norms standards that you're planning can we can we just float that out there. Yeah and put that on the scribble that one down I [2:26:47] Board Member: think we just have to make sure the 300 feet is really what we're talking about in those things like today we were walking 300 that's how many of those lots got their 300 feet so I think it's we just have to be careful that we're not hamstringing developers as well but to get into these areas well it's just it's conforming with what's in the language just tying together I mean it's just it's not explicit but it's there. Yeah I personally don't think you can do it as is but this would help just codify that and make it more clear so I just again I just emailed it around so it's like a red line against the driveway definition and then a new lead-in to section 900 because we mentioned like in the definitions and driveway standards but they all cross-reference and overlap and nothing is really clear I don't know if we have time or you want to go over back to the backlog recommendations or if nobody's had time to review it we can [2:28:03] Chair: Yeah, let's do that. So I guess this would be a good time to, yeah, I'm gonna do that in a sec. Do Tim, do you feel, when do you feel it would be appropriate or needed to do a, to potentially have a workshop? You think we're at that stage yet? [2:28:39] Board Member: I think December, after we get more on back on this, might be more productive rather than, okay, so maybe after November where [2:28:52] Chair: we are in November, maybe think about doing early December. Okay, yeah, early [2:29:02] Board Member: to mid. Yeah, okay, yep, yeah. [2:29:05] Chair: Yeah, agreed. Any communications? Okay, public comment. Here's [2:29:18] Board Member: all of them. I know the board has already gone over a lot tonight. All you guys are looking at the conservation subdivision, what the board thinks. I think it's reasonable to add like a density bonus for elderly housing, are 55 plus community communities, mostly because the Asian population in town and the comprehensive plan does mention something about promoting 55 plus communities. Did we leave, we, I recall us talking about there being an affordable housing bonus type of density bonus. Maybe I don't know if we actually included that in the ordinance or is that something that we were gonna think about revisiting. I can't recall, but I believe [2:30:15] Chair: that there was something about trying to get it to make sense and yeah, work out because [Speaker E (unidentified): because ultimately] we were trying to, that's a, that's a fair point and point taken. [2:30:38] Board Member: I have a question before you. Are you talking about within the conservation subdivision or a standalone ordinance within the conservation subdivision? Because as the town does it right now, once you get past the fourth law cut, no matter when the law cut was done, it makes it a conservation and therefore we're going to see a lot more conservation subdivisions come forward in the future and I think a developer would want to take advantage of that and it would promote them, not basically promote developers to put in 55 plus communities, which would benefit the town, the community. And what do you see is the bonus, more lots, less overhead on the town? And I mean, what would the bonus be to the developer? Like the Stenson farm, their overhead to put in the nine, was it nine or ten lots, ten lots. So if they could get 15 lots but limit it to a 55 or older, they would get five extra lots, so you'd increase the density over what would be allowed with a minor subdivision, right, but it would still work with the comprehensive plan in, because I think there was a study or a vote done in that the town would promote elderly [2:32:15] Secretary: Or community. Yeah, I remember we did discuss it and we decided it was too much to take on at that moment. Yeah, but also with all the changes in the ADU regulations, yeah, we're going to be able to effectively increase, I guess I would call it density. Yeah. [2:32:37] Board Member: Yeah, it's not only ADUs, it's you know two houses on a lot, right, duplicate. That is why we punted because that was that we're having that conversation too, like well it's already there and it's coming so it's already going to double. Yeah, so we don't want to just keep adding to it. That's a shakeout but I don't think you'd be able to like if you did half acre lots you won't be able to meet the setbacks if you did 80 use or a second dwelling on that [2:33:04] Speaker E (unidentified): lot potentially [2:33:08] Chair: size. Yeah, well thanks for that. Thank you. No, and I would say [2:33:13] Board Member: for anybody listening at home we welcome feedback on, you know, are there things in the ordinance that could use improvements or things we you'd like us to discuss. I think that's a good example of something of is there an affordable housing or senior affordable housing, some type of bonus to make it easier to build housing more affordably in general, is a interesting thing to discuss, and interested also in people's recommendations of looking at our current ordinance, what do you think is actually a way to tackle that follows our comprehensive plan and doesn't have insane growth but still addresses those concerns. Yep. [2:34:02] Chair: Any other discussion, next month's agenda? Yep, that would be under old business. Any new business I [2:34:25] Board Member: think I did it now. Yeah, no, nothing I can think of for now. [2:34:38] Chair: And so the deadline for new business is now. Okay, yeah, all right, so we should be able to spend a fair amount of time depending on what comes up of the old business, we should be able to spend a fair amount of time. So the more that hopefully if you and Isabel can get together, other, yeah, I'm not sure what her schedule is. Yeah, right, okay, well hopefully we can make something [2:35:11] Board Member: happen. All righty, the other thing, you know, if I can arrange a meet with Isabel to go over some of this stuff, I'd like to have somebody from the board that was involved in writing the ordinance. Yeah, just because his, I don't have the history and I think that would be important, so I'll put it out there when I schedule a meeting and everybody here was involved as long as only [2:35:38] Chair: two of you show up, one or two, it's fine. Yeah, okay, yeah, just reach out. All righty, I move that we adjourn the October meeting of the 10th second favorite amendments.