Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[0:00] Hazel: To introduce Hazel, who was our board president, and she's now going to be our rep for the. [0:06] Speaker B (unidentified): Infrastructure committee. Hi, Hazel. Hi, I know. I'm not going to roll away, man. Yeah, I know. You know me, so I just want to take 1 minute and. I'm going to focus on. on the role of the select board in here is to liaise and facilitate communications with the select board. So I'm taking that as a, I'm not gonna be hands-on, definitely not voting in the minutes, going to sit kind of by and make sure that as committee, you have what you need to do, to do your work as a committee and be more of an escalation point and if there are barriers and say with Shannon, and I think to help support her. I don't know anything about roads, but I got a background in directing people. When I directed people, I didn't tell them what to do. I wasn't a micromanager. I said, tell me what your problems are and how I can help them solve problems. That's nice music. I think I'm a certified project manager since I do have extensive background in planning and scheduling and budgeting and HR and communications and all the things related to project management and my recent job at state I just retired from I had a extensive background in procurement so RFPs and contracts were my and still are I'm acting as a consultant for a little while for them but so RFPs and contracts but also my background food so I think there's some kind of synergies with what you do but I'm going to be very hands-off Tom said I can you know I can speak and I will speak if I if I need to but I'm I'm not going to try and direct you on the work that you need to do and what you know needs to be done I'm here to support not to not to be like giving a whole lot of directional unless you need it if you want my opinion you could ask for [2:01] Hazel: it I'll certainly give it and we will okay anything else all right so we'll move right into the agenda then the first thing is to request a motion to accept the minutes of last week make a motion to accept the minutes of September 28 seconds okay and look at that we only got one [2:25] Speaker C (unidentified): to work one to one to change I will make I'll know if we leave the 8 to 8 30 yeah that was [2:33] Speaker D (unidentified): my fault okay [2:39] Hazel: so motion to accept it as I'm not as amended second that all in favor so going right into the agenda I had originally requested on the agenda that I had sent out that we get a financial update from Shannon about where we stand money-wise, what we've spent and what we're gonna, so that means what we have available. [3:12] Speaker E (unidentified): So if you would, Pace. [3:14] Shannon: So since the last meeting, we haven't had any change to our capital reserve account yet. We did send out that one invoice that P. Van Pikes had requested. And so that leaves after we pay up, everything will have a balance of 369,000. Awesome. [3:39] Hazel: And do we have any contracts out that we haven't paid yet? [3:45] Shannon: That will be after everything is paid. We don't have any other. Okay, so that includes the payments to payment. Okay, great. [3:54] Hazel: So any questions about finances at this point? Shannon, did you make any decision on adding the [4:02] Shannon: gravel to the shoulders? Not yet. So I do need to go get another quote. I did get one request from Heights. This was for the wide shoulder gravel for Hearts Gravel and Fairbanks only, and that was for 30,000. And so we're, I've got to reach out to some other local contractors and get another quote on that. As far as looking at specifications, I guess it would just be adding gravel and doing shoulder work. I don't know if there's anything more in depth for that, but you [4:35] Speaker C (unidentified): need to do them all. Yes, you've got to back up that edge, and we're going to lose the edge. So I would, I would just make some calls instead of doing RFP and just say, would you give me a price? Place, how man's are, man's are paving, does it? I think McGee might have one. We'll see that. Yes, yeah. [4:53] Hazel: Well, my, so the question I've got then, the specifications, the town specifications say two inch gravel. The town specifications say two inch gravel. If we, if we put an inch on, I mean, when we put the inch on, if we put two inch gravel on that, the two inch rocks are gonna fall away. Should we take the maximum dimension to be an inch? [5:20] Speaker G (unidentified): There, do we have a policy? [5:23] Hazel: It's a policy on roads, and it says two inch. So I'm using that as where I'm coming up with a two inch for the shoulders. Yeah, and I looked at it a long time ago. I can't tell you right where it is, but I know I've looked at it, but should we leave? Should we leave that too much policy on when we're doing shoulders that are only an inch thick? I don't think so. I don't either, but I'm dead. That's my question to you, to the committee. Should, when we do the RFP, should we, should we specify instrument inch maximum? [6:02] Speaker H (unidentified): More inch minus actually, as far as the material or the depth of them too, as far as the size of [6:11] Hazel: the material that should be three quarter okay so then and that's i haven't there's nothing specific for shoulders that i have seen in anything that i've looked at so then our recommendation is to change is to make the rfp say three quarter minus with crushed yeah three quarter crush minus with the was it 12 to 14 or 10 to 12 fines i'm we 've got it someplace in that it's that zero specs yeah so is that a recommendation that the committee approves [6:49] Speaker C (unidentified): They don't say in here what they're putting for material that might affect their price too. Okay. Well, I see nothing on it. [6:57] Speaker D (unidentified): We've seen material. [7:00] Hazel: So one of the things that I did do when I was in Hazel was that the only thing that we vote on as a vote at this point is the minutes. Other than that, we go by consensus or recommend by consensus. We're not voting on everything that we do. So what I do is I'll ask, OK, this is what I hear. Is this a consensus and that's in what we recommend to the town is that still okay with all you guys? Okay, so then we'll stay that way. Hazel did say that if anybody doesn't like our consensus we can do a minority consensus so you can have plus and minus and go both ways and I had forgotten [7:41] Speaker E (unidentified): about that when I talked about it. All right, so you're saying three-quarter crushed gravel for [7:46] Shannon: all eight rows on the shoulder work. Correct. Yes. Okay, and then for the in the past [7:54] Speaker G (unidentified): what are they used in the past? In the past we've stockpiled it at the salt shed and they've taken [8:00] Hazel: it from there and crushed it. Okay, that's three McGee's three quarter inch did not we did not bring the last time we did it didn't we use Stevenson's two inch the last time we did? Yes. Yeah. So that's why I want to get away from that and go to the three quarter. It's going to be more expensive, but it'll stand a lot better. [8:22] Shannon: Okay. So three quarter inch crush gravel on all eight roads. Okay. And then some kind of tool that creates the slope coming off. [8:32] Speaker C (unidentified): Over widening. And then back it. And then come back. [8:35] Speaker G (unidentified): Over widening machine. [8:37] Shannon: Over widening machine and compacted. [8:39] Hazel: So are we gonna do we want to do three quarter minus crushed do we want to specify that it's [8:46] Speaker H (unidentified): from a blast quarry or do we want to take bank run? I believe it open losses three quarter minus [8:54] Hazel: I'm just asking. Yeah, three quarter minus crush just asking. Okay, so that'll take care of in two [9:01] Speaker G (unidentified): feet wide. Correct. Yeah, plus I'd put a plus or minus. Yeah, because sometimes you're right [9:07] Speaker C (unidentified): up you're only going to get six inches you don't want your feet in other places. Okay. [9:14] Hazel: anything else on shoulders and financial updates okay my question is where do we stand on tempe bridge what do you mean as far as we 're three months into talking about a bridge that's been declassified have we done has the town done anything yet to either look at or hire or do some kind of consultant work to come up with a final design on tempe bridge okay so that 's still in limbo at this point okay that's my that was my plan [9:56] Speaker G (unidentified): All right, would you like one of us to get a hold of that somebody to look at that? [10:03] Shannon: So Calderwood Engineering had already reached out and given us all those specs on what they thought. There's another contractor out of Massachusetts that works out of Bangor, I think, in New England, and is another contractor or, excuse me, an engineering firm. So there's a couple of engineering firms that we can reach out to. It's a matter of putting out a request for specific engineering design and then coming up with a timeline, and right now we got 50,000 in our capital reserve account overall, again. We discussed those three different options as far as repair, which would be putting potentially a slope liner in it, which is a short-term fix, a replacement, the town, the cost of the town through a local contractor, and I think that was like three to six hundred thousand, but did not require all the state permits, and then there was another one up to about a million dollars for the 100 year, but that would also probably include an expansion, and then there are funding options there and the state can. Potentially support funding for that up to 50%, but there's a whole process that involves them getting into that. Are we looking at trying to hire a firm? Is that what you're asking, like talking about is hiring an. [11:30] Hazel: Engineering firm that was one of the options from conversations in here. There is a firm that we go to them and say we want a bridge put in, we can't be replaced, and they do everything, they do the engineering, they go out, they get the different areas where there's funds available. That's one of the things that we've taken away from here. The other way we can do it is if we, if we in-house do everything ourselves. That's what Cargo was doing now, didn't they? [12:05] Speaker G (unidentified): We got a name of Pine Tree Engineering also. That was, we should at least call them, let's see what they say, because they supposedly engineer fine brands too. [12:19] Hazel: and we 've heard good word i've heard good words about them so yeah those local towns around us have used them so i think that 's you know one of the areas because my base feeling is we rebuild the bridge we build a bridge we don't do anything with what's there now yeah let's see take out talk about that we did sort of one way yeah if it may be more expensive but then if we if the town doesn't have any responsibility after the bridge is installed the state takes it over i think it's worth the expense. Okay, I had previously decided [13:01] Speaker H (unidentified): we were just going to change it as new. Yeah, I thought we were going to go with the in-kind like place it with what's already there, but a new one. So it's that corrugated metal culvert. [13:15] Shannon: I have that in very good business as a property. Yeah, it's actually a priority for coming years. So I didn't have it down on my list as a current priority, just saving money to work towards it.
Unfinished Business
[13:25] Hazel: Well, yeah, I was looking at what the status was and we just got a little carried away. So we'll come back. I'm going to get an air mark. Yeah, okay, so under old business, last time when we met, we, there are three RFP specifications that we were going to, thought we were going to be getting draft signings to go, small tree lemming, road mowing, and road grading. I think the most important one right now is to go through road grading. We're not going to, we do, we will be doing tree lending eventually, we will be doing rose mowing eventually, but right now we need to get the contract out for road grading on the bottom, all the [14:18] Speaker G (unidentified): I have a question about that, but maybe Hazel can help us with my understanding. We [14:26] Speaker H (unidentified): we just extended some contracts by a year? [14:29] Speaker G (unidentified): Can we extend the grading contract? [14:32] Speaker H (unidentified): We should be grading already, not pulling out our fees. [14:39] Speaker B (unidentified): So one of the things we're working on is the purchasing policy. That's significantly late. And I'm trying to remember, I can't remember what the current policy says [14:51] Hazel: versus what the new policy says. [14:52] Speaker B (unidentified): There are options to amend contracts in both policies, and I think we'd look for a recommendation from the purchasing manager, which is the town manager, the best course of action, what's the best value for the town. [15:16] Shannon: Do you want us to extend it at this point? [15:19] Speaker G (unidentified): At this point we were out of time to put out our RSPs last year, it snowed on November 16th. [15:26] Shannon: yeah so i'll be strong before then our contractor can see if that's something that they'd be willing to do in the meantime i do have all the comments that you did make in the last greeting or at the end last meeting and so that was just i have the verbiage in here i haven't incorporated it into it yet so I think that 's a valid plan to extend it for one year in the meantime I will update this and get this to you I just haven't done okay so update it the [15:58] Hazel: way it is now. The this is an extension, it's extended. Well extend the, extend the RFP that's in place now and not do any of the changes that we talked about. Yes, so I think that's a [16:15] Speaker B (unidentified): recommendation that you should bring to the select board. Do we have time to do that? Yes, okay, so [16:22] Hazel: there's a next board meeting. I mean, they should be like ready this week. Yeah, so does the committee agree that we make a recommendation that it gets extended for a year with the current contract the way it's read and not with any of the changes that we've made in the past [16:39] Speaker G (unidentified): couple months? Yeah, okay, so that'll put, yeah, we make changes. It seems like that there could be negotiation and then under the police, and I think we just want to integrate it [16:52] Hazel: so then if they're willing to be, but yeah, my problem that I have without we're doing that is that, and you all received the email that I sent on Hartscrabble Road. There are two rocks that are an inch and a half over the surface of the road and they are at least a foot across. All right, do we just overplay Scrabble on those? Do we put out an RFP to have somebody come in and dig them out like we did on Hard Scrabble? How do we get rid of those rocks? Do we, or do we try to do that this fall or [17:33] Speaker G (unidentified): late till next spring? I'm pretty sure a few years ago that C.H. Stevenson went down through there with a whole room and tried to get rid of some stuff and it didn't. I don't know, those rocks were particularly well, they can't worms maybe too, I don't know, those figures were particularly part of that, but that rock was super hard, they didn't, weren't very successful. So I think for right now we just need to leave them there. Okay, so should we add material [18:02] Hazel: Add material on top of them, or should we recommend to add material on top of them? Let me, let me get my wording right here. Should we put two or three inches of gravel on top of them? Because if they grade it the way it is now, there's going to be a hump in the road right there. It's on the shoulder, and it's an inch and a half over the what's there. So what's, what should be the recommendation from the committee on the place where that there's rocks that are above us the surface of the road that can't be replaced? I'd [18:38] Speaker C (unidentified): have a terror pronounce that we wouldn't start digging those out. We may be having a bigger project than we need. Plus, isn't that what we need [18:45] Hazel: to do some work is by acting George's right? It's between George's and all, yes. It's after George's, between George's and the God pasture land, right? Yeah. And I don't know if there's any more on any other roads or not. I had with the seven miles of gravel road we have, I don't know if there's any more rocks or not. We have to think about that, particularly most Rodney Dundee it is. So anyway, okay, so our recommendation is just put two or three, two or three inches of three quarter brushed in there. [19:23] Speaker D (unidentified): Well, yeah, I guess. [19:28] Hazel: Yeah, it'll be on a length of road of about, I'm gonna say 200 feet, to cover both of those at the same so we don't have any rises and falls. Okay, so the recommendation from the committee then is to put three inches of three quarter minus gravel. That'd be the specification we used before. And then we'll put this on an agenda to look at next year or the year after to see if those rocks can come out. Do you know when you're plowing, are there any other place, any other rocks on gravel roads? [20:08] Speaker D (unidentified): No, those, no. Okay. [20:11] Hazel: And I haven't walked any of the other roads, so I don't know either. Okay, so let's so on between George's lane and. [20:24] Shannon: I saw on my road down there also. Okay. Yeah. Yeah. [20:28] Speaker G (unidentified): Typically affect as much on file. They've been like that for a long time. [20:32] Hazel: Well, I know, but it's a grading. When they try to grade, they're not going to be able to grade it because if they weren't sticking out, then I wouldn't feel bad. But they are. The other thing that I would request that goes into that is that they don't leave any rocks on the side of the road that a car can hit in that same area. In that same area a year ago when they graded, they left a an 80 inch rock in the ditch rather than pushing. They couldn't push it off on the other side of the road because there's a big fill there. So in on those right on those when you do the RFP, Shannon, don't leave anything in a travel way. [21:14] Shannon: Okay. All travel lanes will be graded. Don't leave [21:19] Hazel: anything. However you want to reword that, but just because it was, like I said, there was an 8-inch rock in there a year ago, and it was because there's no shoulder there, and there's no ditch, it was right in a travel way. Okay. [21:37] Shannon: Anything, I mean, as far as rocks exceeding five inches in diameter or four inches, three inches [21:45] Speaker G (unidentified): From a roadside model perspective, you know, you're expected to roadside all those roads and you can't put your bar down with this left behind, especially if it's an area where grass is growing. You don't see them. They should be thrown off the road. What size of all sizes? Yeah, well, let's run. Okay. [22:09] Hazel: Two inch, two inch, two inch max or too many two inch over. Yeah, two or three inches. Okay, so you're [22:16] Speaker E (unidentified): Two or two inches, two inch and over, two inches in the you said travel way, but you're saying [22:29] Speaker G (unidentified): Like if there's a shoulder where there's a ditch, it's down in the ditch. Yeah, but if there's like the road just kind of narrow and next to the edge of the road there's rocks, they should be swept away to the other side wherever they can get rid of. They don't need to haul them away, but they you know certainly could find a place to yeah, they wouldn't get hit by a car there [22:54] Hazel: Is on high ground without a problem, right? Yeah, I don't know about the rest of these things about [22:58] Speaker E (unidentified): The roadside mowing. So if the rocks are there, you're going to hit it where you can mow it. If you're a big rock, you can't know if they live. Well, I was looking at the mowing roadside and [23:08] Shannon: The town way to the bottom of the ditch. So isn't that aren't they still mowing down into the bottom [23:13] Speaker E (unidentified): Of the ditch? That's what I had down from your notes for the specifications into the ditch the [23:19] Speaker G (unidentified): Moment to the back of the tips to the bottom of the ditch, you know, the back of that is yeah, oh [23:23] Shannon: I had down your meeting minutes 13. We didn't say at the bottom, to the bottom of it, but we didn't [23:29] Hazel: Set it back. We asked, we didn't say it, we didn't say it was a horrible mold. It sounds like it could have been, it could have been a vertical moment. I said yeah, back of the day, big back. [23:39] Speaker G (unidentified): Because it's a horizontal bar that goes up and doesn't go down in ditches, and it doesn't do the back side. Right, if the rock's down where the mower will go over it, wonderful, and a tire will hit it. If the rock is sitting up on the shoulder and two tires meet and one of them goes over there, then one's going to hit a rock. [24:08] Hazel: Okay, so that takes care of the grading, and those are my concerns about grading. Are there any other concerns about grading? Time to have one, but I don't know if it opens the whole mountain. Let it open the worms, because if we don't know it, we don't know. I mean, it, there can be a lot of [24:27] Speaker G (unidentified): leaves in this grazing operation. Be better if we don't drag these clumps of leaves into our road. [24:32] Hazel: So what you want to do is you want to blow the leaves off, because you have to pay an awareness. [24:37] Speaker G (unidentified): Right, not really time of year. Yeah, that's not a problem. Again, we should be hearing before now. Well, but those leaves will end up in a big massive wrong way along with greater, and should we then [24:52] Hazel: should we then put in their, the request that we, that they use a leaf blower to blow the leaves? [24:59] Speaker G (unidentified): That kind of money, that's a seven mile problem, it's a 14 mile problem. Yeah, okay, tasks for grading [25:08] Shannon: are to take place in the spring and fall. Do you want to specify no later than date, so before like [25:13] Speaker E (unidentified): the leaves really start falling? They're there anyway. Realistically, they just need more now. [25:18] Hazel: We'll do that, we can do that when we do the total grading, but with this, with this one that we're putting out to extend it a year, oh, it's too late to do that. Yeah, right, I'm [25:32] Shannon: still making notes for the next time. Okay, because you've probably gone through it, you know, your [25:36] Speaker G (unidentified): notes from it. Yeah, this was just something new I was thinking, and I brought it up. Okay, [25:40] Hazel: so then at this point then we're not going to do any leaves, we're just going to grade them into the road. Okay, that's fine, all other people do with leaves. All right, so the next thing that I had [25:52] Speaker H (unidentified): down was the Barry Richmond Road survey complete as of last Wednesday. Okay, [25:59] Hazel: realizing that, you know, we're not looking at until next year, but at least, at least for five months ahead of where we were four months ago, because now we're looking forward. So that's [26:27] Speaker H (unidentified): all complete, and then you'll be working with, I'm gonna just gotta type them up and send them there. [26:33] Hazel: You'll be okay, all right, so that's great. Thank you for doing that work for us. You're making fun [26:38] Speaker D (unidentified): of the scum. We've lost it. Don't shake it. Yeah, oh, the people are gonna ask you, it's gonna [26:50] Speaker H (unidentified): so that wouldn't go down, office boy. I'm up there with the pen. I'm not going down, I believe [27:00] Hazel: Yeah, so the next thing we talked about was the RFP specification for Dexter Pond Road, the rock build up. Do we still want to put that on for next year, and if we do, who do we think, who do we want to have design it so we can put it out for an RFP? So the last meeting you talked [27:20] Shannon: about braiding fabric, four inch minus rock with a depth of eight inches, and then surface gravel [27:26] Speaker H (unidentified): four inches. All right, that's right. Yeah, that's worked very well, of course, in the past. [27:33] Hazel: Okay, but we just do, we still recommend that RFP be put out for next spring [27:43] Speaker H (unidentified): as a committee? Yeah, just to me it depends on the timing of when do we want to look at realigning that. So if we're going to realign that, well, we can live along with the way it is now. We're not going to realign in that area. Yeah, but no, it could be all one project, just saying, well [28:03] Hazel: you could be, but you know, but that's three years down the road, there's a lot bigger project. That area is basically almost impassable every spring. It does. So it needs to have something. Okay. So then we'll, we'll recommend that if there's money available. Then we'll put the RFP out for that and we'll know better. After each things. Okay, good. Thank you. The next 1 that I have, when you put that RFP out. [28:33] Speaker G (unidentified): Talking about that RFP for Dexter Pond. Okay. We already have the fabric for that. [28:39] Speaker H (unidentified): about that, so you know we'll supply where it's not, where is the family? Yeah, that's a soft fit [28:49] Speaker G (unidentified): Yeah, that project was planned to be done three years ago. Yeah, no works no matter the fact I'm safe. Okay, all right, I just don't want to put down an RFP and have somebody bring their own [29:00] Hazel: don't work if we still have that. Yeah, so now is now is when we start tap dancing. The next thing we have on the budget is the budget, the towns, the budget amounts recommendation for the town media for our town warrant. Should the listing that we have now, this is this isn't the reserve fund, this is a regular, should the listing we have now be the same up down? I mean, we always want to go up, I know that, but really realistically I think we wait next meeting, we look at it line by line [29:39] Speaker C (unidentified): because something should have been increased on that, like brushing and [29:46] Hazel: That's fine. I just it just needs to be brought up because it's we're getting into that time when we have to go look for [29:52] Speaker G (unidentified): money and all right well then we should have some RFPs back so we could plug in some better numbers. Great world nobody grow grading those sorts of things if we have all right because we don't I couldn't tell you bro grading's gonna double. Do you want to carry the same things you've carried or is there going to go? Yeah we have more information so yeah we've got to get smart [30:17] Hazel: Our so we'll put that in the back pocket then until the next meeting but at least we've we've thought about it. So the next question is the reserve amount. What is there any recommendation on what the reserve amount we should request from the town kind of the same [30:37] Speaker C (unidentified): thing like you said before if we can find out what these projects are going to cost but my gut recommendation is right off the bat 350. Let's start where before we got cut get back to where we were trying to forfeit to be better frankly I think we've done 300 for [30:56] Speaker G (unidentified): decades we never did it. 350 is a joke because we love 300 for decades right it should be [31:04] Speaker C (unidentified): and build that up. Now we're going to get pushback I guarantee you especially when we have there was oh we got 369 sitting there. Well there's nothing wrong with that gives us [31:15] Speaker G (unidentified): started that'll be gone I assume before next June and it would certainly be nice to get out of this [31:22] Hazel: constant cash flow battle with what the roads exactly. All right so the recommendation from the committee at this point is 400 000 and we'll look at it again above [31:35] Speaker D (unidentified): 50. Fine [31:38] Speaker C (unidentified): I cut too low and he cut me another 50, so I'm not going to do that twice. [31:47] Hazel: And do we want to recommend another 50 for Tempe? Keep it going? Tempe is going to be somewhere between 300,000 and a million. We need to keep it going. So it's like a fire truck? Up you're going to start building somewhere it's just like the fire truck okay so then we'll recommend that five off nobody will get 100 grant on not at all okay we'll recommend it especially [32:14] Shannon: with the dot all the funding was a lot of those cut this year and they're not expecting to get that back and so for the grants and things that they give out they're really cut back on [32:24] Hazel: their funding as well so we'll recommend fifty thousand dollars to go on the reserve fund for [32:30] Speaker H (unidentified): 10 people right okay good there were some reserve funds that will come off right [32:38] Speaker C (unidentified): Then we put this year at the town meeting, Henry's took some of our money and put it in a reserve, like, was there were a couple of different things we put money in that weren't like [32:51] Speaker E (unidentified): Maybe going to be long term, like re, like he moved it from capital reserve as operations. [33:05] Hazel: The other thing that they did is they took money out of our out of the town operation funds to put into personnel, okay, so that would never come back to us because the personnel we're still there, all right, so next one, Wayne Dam and North Wayne Dam treated. [33:32] Speaker H (unidentified): All right, so David Baylor and I want to look at both dams, the village dam and North Wayne dam, so each needs significant amount of clearing, so I think we thought too much to put out in one RFP, so we thought we should phase it, and we can start with either bridge, but me, I say village stand first, and so that would be a phase one, and then we would do looking at North Wayne from the road, you would do the left side towards the town building first, second phase two, and then the other side, so which would Be the east side? I thought we're going to combine line two together. Yeah, well, we said three phases. Yeah, well again, it depends on finances, does it [34:23] Speaker C (unidentified): Not, right, yes, okay, so it's just a matter of if we could get bids one, two, and three, or one and two and three, you know what I mean, piece them back together if we, where the numbers came in [34:34] Speaker H (unidentified): Yeah, we'll give us options we can play, yeah, we'll put it out in MRFP but in three phases, and we'll get prices for phase one, phase two, phase three, yeah, and then we can bump depending on funding. [34:43] Speaker C (unidentified): We can either combine or not, they might give us a better deal if we put like one or two together or something though, but if we just made that clear to them when they did it, did you look at certain [34:53] Speaker H (unidentified): Size trees or what size? It's all going to be trees and brush, so I think the easiest way is really to just go out to tag the major trees that need to come, and then everything else is the brush all around it, from here to here, from here to there, so for brush, are they just [35:09] Speaker E (unidentified): Lay it out, cut it off, or are they trying to pull it out? No, cut it, cut it out, yeah, so you don't [35:16] Speaker C (unidentified): Want to disturb this oil in there, you need the soil as much as you can, so I just wanted, so that [35:21] Speaker H (unidentified): Was the approach that we were thinking of taking, so if that's good, I'll put it all together, okay. [35:26] Hazel: So it's it's there are you're talking three phases, yeah, but when we put the RFP out we put the RFP out as phase one, two, and three, correct? Yeah, and then we take the bids on however the people want to give us the bids, whether they give us one or whether they wanted two or one, two, and three, and that the town will look at those. Is that a priority for this year? Well, [35:54] Speaker H (unidentified): timing wise it's not something that we talked about we want to do in the summer when everybody's around, but does it [36:01] Hazel: have to be done in 26, 27? I think if you get the RFP done and then we can get that put out before [36:08] Shannon: April, then we could at least have those put into the budget for about fall, because when the water is dropped down as low as it is now that would be great to get done in the fall timeline. Yes, there's [36:19] Speaker D (unidentified): no running water and no leaves and no people and no peeps. Yeah, all right, so a thought on that [36:27] Speaker B (unidentified): from I know from state perspective in our state contracts there's language that says multiple awards may be, multiple contracts may be awarded as a result of this RFP, so I don't know if you can put something in that might account for your phasing and give you a little flexibility on how you make those awards. Is that something you've seen before, Mark? I'm just thinking if we bundle [36:53] Speaker C (unidentified): They might get a better price if you can do two together instead of okay with this with this with this stage one, stage two, stage [36:59] Speaker G (unidentified): Thank you. Well, it's usually a better person [37:02] Speaker B (unidentified): We can always in there be funny something that says give assumptions. Yes, you guys pricing [37:07] Speaker H (unidentified): Yeah, and in the previous in this current road contract we put in there that the town can choose to use the bid alternates or not? So we have a flexibility to add the extra work or not depending on funding, right? Some of them I'd really like to see in our tree program is [37:28] Speaker G (unidentified): herbicides like we don't touch them but all those brushes and I don't I haven't even looked at these jobs I don't care about these jobs but every time we've got brush and stumps and trees if we're not treating that stuff or that brush stuff it's coming back, it's a very short-term fix. If we can get somebody with a pesticide applicators license to treat the snubs that's it, we're done with that brush and that's not it ain't coming back, we're out doing the dams Taylor mentioned [37:57] Speaker C (unidentified): That the there's a guy that does very environmentally friendly herbicide and direct treats instead of, you know, just do a broad spray. Yeah, directly treats the areas and like across from me, he did that for that weed that's growing everywhere. Right. And Taylor was saying, you know, where they've got Pond Road cleared now, you need to do it now. Yeah. Because it'll come right back again. [38:23] Speaker G (unidentified): I'm only familiar with this one product called Tordone RTU. And it's a stock treatment. It comes in a bottle. You can either squirt it or pour it on the cadmium lead. And that's it. That thing has never come back. But I'm not licensed. I used to be many years ago. This body is. I'll give it its name. Okay. [38:39] Hazel: Okay, it's just a shame to have this stuff put a lot of money into clearing it. Yes. And then is that something that should be included in the RFP? I thought there's my money doing this. Yeah. Does the committee agree that this should be because I don't want to do that in the RFP. [38:57] Speaker G (unidentified): It is my money is one thing that I think is clear. Just to talk to her every time. Well, I know this is a luxury, but top of that. Well, when it's clear, it has to be done in a certain amount of time. If you're gonna do a stump, and I'm not the expertise anymore. [39:17] Shannon: We'll have to check with the DP since it's also in Charlotte. [39:19] Speaker G (unidentified): It's also in Charlotte. But the guy with the applicator's license is going to know what he can do and what he can't do. Right. [39:26] Speaker H (unidentified): I mean, Taylor's position is that it is a safety issue, so permits could be exempted, but I don't know if herbicide treatment is exempted under the same, so that would be [39:39] Speaker G (unidentified): a concern. I don't think that there's a permit for herbicide. You just have to follow the standard that your license gives you and they may say you can't spray within 50 feet of the water this is the dead issue right I don't know but I don't know [39:56] Hazel: So should it would say would somebody from the committee want to explore that so we can talk about it next month to see whether we can put herbicides out or not I'll find out who the guy is okay so Dave will you will put on hold putting it on in the RFP until we get a report back from Dave next month okay I want to thank you three for going out and include Taylor when you do that for going out and looking at those because that's really good okay [Speaker D (unidentified): That's] not what I wanted and that's not what I want to do. [Speaker D (unidentified): I want to] establish a priority for the coming years. [40:46] Speaker C (unidentified): We've covered some of that. I would say one thing, Tom. Brian and I and Taylor looked at that intersection [40:53] Speaker G (unidentified): at Lovejoy, Vaughan Grove, and Walton. [40:56] Speaker C (unidentified): We need to get somebody in this school, go through the culvert and find out where it goes. Which one? There's a large culvert that comes out, but we can't find exactly where it goes in, and that think hole is in between the two. But not in a direct line, it's over here and it's another color that goes a different direction, so it wouldn't hurt to get somebody in with a scope and shoot those colors so we'll see what [41:23] Hazel: we got there's a reason that simple method, yeah, so we've got listed and we've got the, you all have the spreadsheet that says what we look for, what we're looking forward to for paving priorities and where we're going to go at this stage of the game. It's Barry and then yeah, Mills [41:48] Shannon: Road. Did you not want to finish Hard Scrabble in Fairbanks Road, the overlap, that's from ditching [41:54] Hazel: that? No, that's didn't change, it's, it's just, but so this is priorities at this stage of the game we're talking about, then we'll come up with the order. Okay, so if you look at page two of the thing, what I've done is I've just listed them here, not necessarily in any order that we prioritize them, but just things that we had talked about to let at the last meeting. So there's Hot Scrabble, Fairbanks overlay and shoulders, and there's a very Richmond Mills preparation and reclaim and base course application. There's a Dexter Pond rock sandwich. There's the intersection of Lovejoy and Walton Road. There's a Tempe Bridge repair replacement and the Dexter Pond relocation, which we've talked about a lot, but we've never really done anything. And are we really interested in doing that? I know it's a three-year project, but are we interested in starting the engineering hearing on that yet? So these are the, this is a list of ones that I have found. Are there any others that I have not included in here that you can think of? The [43:07] Speaker H (unidentified): Berry Road culvert, I was going to [43:09] Hazel: say, is the culvert included? That's, that's included in, the preparation for recommend for, yeah, because it's exactly like we, when we rec, when we, 're going to do reclamation for Fairbanks. The first thing we did is we went in and we replaced across culverts. I consider that part of the reclamation aspect. [43:33] Speaker C (unidentified): It needs to be done way before the reclamation happened, so I think it should be replaced these culverts six to eight months earlier. Let them settle before we go in and grind and pay it right afterwards. Berryville culvert especially has to be done quite early in advance. [43:48] Hazel: Yes. Okay. So and- I've said that before. [43:51] Speaker C (unidentified): It should be down to four. Yeah. Okay. So then- Fairbanks looks like, did he put the overlay on that? It comes right flush to 133 like it was already at the overlay. [44:01] Speaker G (unidentified): No. Not down again. Well, okay. [44:05] Hazel: All right. So do we want to make then- [44:08] Speaker G (unidentified): The dog has been contracted for the overall, yeah. [44:11] Hazel: Do we want to make then the cross culverts are separate from preparation for [44:19] Speaker C (unidentified): Yeah, except right out to the big culvert and the cross culverts and then reclamation and base course. [44:25] Hazel: Okay, well, that's why I put preparation because when I put preparation in there, that's to me that's doing the cross culverts and all the rest of the stuff that needs to be done. [44:34] Speaker H (unidentified): There's two other cross culverts besides the big one. [44:37] Hazel: Well, and that might be. There's two other big ones. [44:39] Speaker G (unidentified): There should be doing cross culverts, driveway culverts, and ditching, and then they should come in and re-bind. [44:46] Hazel: So you want to do the driveway culverts before you do the, before reclaiming it? [44:52] Speaker G (unidentified): We got into this rot, but we don't belong in the rot of doing driveway culverts after. [44:56] Hazel: Okay. And that's fine. I just need to know that. So then part of the preparation would be all culvert work. [45:02] Speaker G (unidentified): Yeah. And there are no driveway culverts. [45:07] Speaker C (unidentified): There are no driveway culverts. [45:08] Hazel: Well, in this role that they will be, yes, but not a barrier. But they will be coming up so that the preparation will include all covert work. [45:19] Speaker H (unidentified): Yeah. Okay. You can include those 2 cross over. It's on Berry Road with the Berry Road. Oh, yeah. [45:27] Hazel: Whoever's doing that. Well, that's what I'm thinking. [45:30] Speaker G (unidentified): I think both those roads should just go out as an RF one RFP. Yeah, for clothes like you know like the culvert. Yeah, like we did Archery. Let's get the trees done first. Freeze. Yes, freeze first. Okay, and then ditch it, change all the culverts another RFP, then reclaim it and pave it another RFP, and then shoulder work another shoulder added gravel to the shoulder fourth RFP. Okay, then the [45:57] Speaker H (unidentified): project dot project. Okay, there's only two cross covers on Richmond, most three [46:05] Speaker D (unidentified): so oh we saw a [46:07] Shannon: couple of cross covers on Barry when we went out and explored it like this side of the vehicle. Yes. [46:12] Speaker G (unidentified): That's where they are. We have, we're coming down here. We may have missed marking one, but we know we did. It was good. I'm gonna get the table on my phone, probably where they would say. [46:21] Speaker H (unidentified): By this I couldn't do so much out of there. You're doing an incredible job. [46:26] Speaker C (unidentified): Chasing Scott, how many, how many driver with helvets are on Richmond Mills? [46:34] Speaker D (unidentified): One, two, three, do. [46:44] Speaker C (unidentified): We do, we have quite a lot of those in the inventory still. No, well, I mean, we. [46:49] Speaker H (unidentified): Used up, we have a bunch of good things to, yeah, we used all the 18 on Fairbanks. Okay, so five. [46:56] Shannon: Grass pelvards on Richmond Mills? Yeah, 18-ish. Yeah, going to 18-ish. And then how many. [47:05] Speaker D (unidentified): Driveway did you say? Just the one. On Richmond Mills? [47:14] Speaker C (unidentified): And not on Derry? One driveway there. [47:17] Speaker H (unidentified): And no driveways on Derry. Just at 83 Richmond Mill Road we're doing the driveway covered there. [47:27] Shannon: And what did you say for the cross culverts on Barry? Because we had those, there were. [47:31] Speaker D (unidentified): A couple of those too. Two plus the big one. Two plus the big one. [47:36] Shannon: Is that a 36 inch one? [47:37] Speaker H (unidentified): The big one, we recommend the 36. It's 24-ton troy now. It's going to 36. It's not in terrible. [47:46] Speaker G (unidentified): Shape, the culvert itself, but the end slope or the invert is just a mess. [47:54] Speaker C (unidentified): Would it be a situation where we could add to what's there or you should or just so far. [48:01] Speaker H (unidentified): It's the slots are one-to-one straight down to the right so it needs to come out, gotta get and. [48:07] Speaker C (unidentified): Garden and be better, maybe build it up a little bit, that dip out same time, so I think we should. [48:15] Shannon: Price that for next year's budget. I mean, if you're looking at seven 18 inch cross culverts times how much one year old foot and then for the 115 inch driveway plus the 136 inch, you're going to want to put that increase that culvert line on your roads because we currently only have five thousand dollars for culverts on operations if you're looking for getting it done throughout. [48:37] Speaker E (unidentified): The year versus capital. Yeah, they somewhere along the way we switched. [48:46] Speaker G (unidentified): The $5,000 we have in culverts, we only ever purchased culverts, never installed any culverts. It was just what we spent to buy culverts. And then we hadn't for contractors to put in. [49:01] Shannon: I got that. I'm saying that's what you have for the budget line right now. I'm saying this is going to cost more than $5,000. [49:07] Speaker G (unidentified): The culverts, but this year we didn't put culverts, we didn't give them culverts. They carried them in their beds, so $5,000. Oh, the driveway ones. Yeah, everything. Well, they just happened to have the cross culverts, so they used them. But yeah, they bought their own driveway culverts. [49:22] Speaker H (unidentified): Yeah, they just supplied their own material. Right. [49:25] Speaker G (unidentified): So if we're going to keep going that way, then we can get rid of the $5,000 culvert line, if contractors are going to provide the culverts from here on out. [49:34] Shannon: Okay. So we'll do this in the RFP then. [49:36] Hazel: But my recall is that if we, if we, the town buy the culverts, then we'll save a lot of money, save some money. That's what I think, but that's not what we did. So, well, I know, because we didn't have time. Again, we're working, fortunately, six months ahead, so we've got the time to do that. If we recommend to go by some voters, we can do that, because we're that far ahead from what we were [50:03] Speaker H (unidentified): four months ago, five months ago. Big concern, I personally think they should just let the contractor supply them and do it, because you don't want to be in a position where we're, we're short of culverts, and now we're holding up the contractor, and the contractors waiting to get approved for purchase, purchased, ordered, all the whole process that takes time. So just don't, I just don't like to see the town, you know, being accused of holding up the contractor. The kind, let's a contractor just supply whatever he needs to do the job. We're not, what's the price figures [50:37] Speaker G (unidentified): between your contractor price and town place, ballpark. This is what I know. If you go to Paris Farmers Union to buy driveway culvert or any footwork, it's twice as much in the Paris Farmers Union. Fill a visit to our town chat, so let's just say Shannon Falls, Burwell farm, to replace the culvert. I'm going to turn on the block, and I'm going to drive to Paris Farmers Union, I'm going to pay twice as much for the culvert, I'm going to drive back with it, and then I'm going to install it, and I'm going to get paid for all of that. You pay twice as much for the culvert. Now if we have some culverts left, the salt shed time still starts to say, you're saying 50 on the driveway culvert [51:18] Speaker H (unidentified): and I didn't, you didn't pay me to go to wherever to get it, and that's if you're paying time in materials, that's if you're praying. But if you're in a big situation like we have with pipe, just supplies like he's not, now it's included in his linear foot price going together, it's [51:34] Speaker G (unidentified): included, but the thing is he might hang up 20 and top of the 100 already, and he's paying sales tax [51:40] Speaker H (unidentified): it went up, so it's 25 and a half percent. Yeah, they typically are marking it up, depending on how much profit they want to try to make. If they try to, if they really want that job, they're not [51:50] Speaker G (unidentified): Charging you 20 percent did they use our culverts when they just talked about culverts just on which is part of an amendment it wasn't part of the bid did we just didn't have enough to do the driveways as well right we didn't have the right size we didn't have all the driver purpose [52:08] Speaker C (unidentified): But here we have an idea here we're going to have an idea because you measured we have an idea of what we're going to need for culverts so why don't we just buy them and have them and yeah they're area grab and then you know if we if we didn't know what we were going to need would be one thing [52:24] Speaker H (unidentified): Yeah but I look at it but who manages this the barn who manages the stockpile of pipe who stacks it who keeps track of it all this just becomes a lot of work items that we don't have people to do so Mark oversees it a lot just because it's part of what he's there Henry had said he had gone there and counted pipe but the pipe were laying all willy-nilly a little bit you know so it's like who does it all Hazel yeah so that's that's how I look at it what don't get into the stocking business just Get into the industry stay that way let them deal with the handling of the material but that's just me but I come from the land of endless budget right [53:17] Hazel: Lucky dog shaping the budget is there a recommendation on whether we buy culverts or we don't buy culverts or is there a majority consensus and a minority consensus [53:30] Speaker G (unidentified): I think there's going to be a split decision because I think we should buy culverts [53:36] Speaker E (unidentified): Okay and I understand that perspective but I understand this when we come back to the table [53:42] Shannon: To go over line by line on the budget or something you can keep it 'll come back up again because [53:46] Hazel: I would say we still continue to buy it's just a huge difference so you consider buying the covers yeah but the town buys them and supplies them and you consider that the contractor [53:59] Speaker H (unidentified): Characterize them I think it comes as part of the supply yeah you're [54:14] Hazel: Right and at this favor I'm in I'm in favor of the town buying them because we know what we need now which is if it's going to take 500 to go down and straighten out that mess it's down there now and get rid of the garbage is there because they just got stuff put there I think we'll more than cover that [54:33] Speaker H (unidentified): With what we spend what's the 500 who we paying I don't know where are we and what are we getting [54:40] Hazel: Well, that's much, that's my, I go down every day. It's going to cost four or five hundred dollars to clean that place up and the culverts up like they should be and that kind of thing. And it's, it's one of these things that we talked, we put a con now, Shannon can if she wants to can put up, put the out the bid. She doesn't have to even put out the bid because it's only going to be five or six hundred dollars to line that stuff up and clean up the mess that's down there and get rid of the old iron culverts and things, they run away, they, oh, they're gone, great, okay, we're used to that. Yeah. Yeah. Yeah. There's also some concrete culvert down there now. Yeah. Yeah, that we don't need so that can be. Anyway, so, it's three to one. To, buy the culverts between now and when we put the contract out next spring. That's right. Okay. That's all I had for an agenda. Any other items that we haven't brought up that we need to talk about? We've got a lot of thinking down the road. I have a couple items. Okay. Striping. [56:02] Speaker H (unidentified): So now that we're starting to repave our roads, do we ever consider putting a shoulder stripe or a center stripe on Pond Road? able to pull down we're talking about the winthrop road just for savings yeah but are we do we as a town do we think that 's just extra money historically i don't know the reasoning we don't [56:22] Speaker G (unidentified): strike it there's sort of it doesn't strike that's it and those bro they're going to be [56:28] Speaker C (unidentified): here it's going to be challenging where it's dark and there's a dark road but they're going to turn gray here within six months yeah I mean yeah just to country [56:40] Speaker H (unidentified): for my own you know I'm just like going down Pond Road last night and maybe it would be nice to get [56:46] Speaker D (unidentified): out yeah something private I don't know where it goes [56:54] Speaker H (unidentified): okay stripping is the cheap part of road construction right [56:57] Speaker E (unidentified): it's a penny a month it's a penny of whatever no I should be doing the striping right before [57:02] Shannon: Memorial Day so it looked fresh for the parade that came down Main Street with all the sidewalks at everything and going into school I mean that's the end of school year but if you get it all done then like right before school closed out right before Memorial Day is there [57:18] Speaker E (unidentified): anything else that you want me to add to it we should definitely have a school zone some there's [57:23] Hazel: A ton of speeding people going there. Yeah, we've got the school zone ramp it up. Yeah, at this stage we're talking two different, two different areas. What Brian is talking about is to, is to do Old Winter Road the whole length, or he's talking about doing all things. I'm talking about, well, no, but let me get finished. He's talking about doing this six rows that we just paved to one inch the whole length, and whether he does, whether we do a single yellow stripe in the middle or two white stripes on the side. That's what he's talking about. It would be nice to know the cost, and then, and then Shannon just brought up what we already do down in the main part of town, so it's two different items. So should we look at what it would cost to stripe the whole town just to get an idea for it, a whole, don't have to do it. Yeah, probably don't have to do it, Berry Road or Messy Road. Okay, so then what we should do, then what we should do then is come back next month or when we have our next meeting and say these are the roads we think should be either side or middle stripes the whole length. Well, I would imagine that the striper guy could just say it costs this much for a bellow. Well, I know, but we need to, I'm just like them because I don't even want to talk about it if it's 50 grand. Yeah, but we need the list of rows that we would like to have done so we could tell the striper guy this is what we want to do. [58:56] Speaker E (unidentified): We can't get a footprint without telling them. I don't know. Okay, they, I contacted several striper [59:03] Shannon: companies back in the spring, and the ones that we went with have the lowest bid, and they go, yeah, by color, they go by distance, and then what type of like project you're doing. I mean, like for the road they charge different for the school zone, different for that or handicapped zone or parking spaces or sidewalks. Sidewalks are pretty expensive, but the line stripping I could probably get a quote on that if you knew how long it's going to be, like what the feet are for the roads, like if you're looking at the whole portion of a road or just a segment, like Readfield does the Innis Ridge just for that segment and around the corner. [59:43] Speaker E (unidentified): Are you looking at certain portions? Well, that's what we'll come up with next. So they didn't do [59:47] Hazel: next hole in this ridge yeah well that's what we'll come up with that 's what i want to come up with next month do just sections where maybe it's had what newcomb's calling yeah so [59:57] Speaker H (unidentified): Maybe that's what it is. I would just tell you guys figure, let's have one conversation please. Figure five to ten miles, let's say roughly, just so he knows he's not doing 100 feet, he's going to do in mass quantity, and how much per million foot, and then we can apply that number to however many miles of road we think, okay. We pick out the roads, number five or ten, we've got [1:00:24] Hazel: 20, 28 miles of paved road in the town, not if we have seven at third [1:00:34] Speaker E (unidentified): Are you just looking at the white on both sides? I would ask them for the odds and what would it be [1:00:41] Speaker H (unidentified): for yellow down the middle, what would it be for two shoulder stripes with white stripes down the [1:00:47] Speaker E (unidentified): shoulder, down the middle and two white stripes, no, or yeah, either or, yeah, no, he's not made all [1:00:54] Speaker H (unidentified): Yeah, possibly the whole thing. We have people that, like my own family, will come down innocent, they'll go why don't we stripe our road, I'm like well that's a refill, they're more, they're more worried about safety than we don't have strength, yeah, that's how it is, but they didn't do the whole thing, they only do portions, and that's what we would do, we would only do the portions that we feel are our nectar roads that are getting us from a state road to the state, yeah, and I do [1:01:23] Hazel: stand corrected, we have 23.3 miles of paved road according to five miles of straight, well three, yeah, probably maybe ten, so if we did, we paved, yeah, well why don't we get both five and ten [1:01:40] Speaker H (unidentified): Yeah, that's just for him to price it, you know, it's not rocket science to get a price for both. [1:01:47] Speaker B (unidentified): Anyway, so, there was a select board concern that came up around the library specifically, and was speeding on the old Winthrop road. And the recommendation from this committee was to not put every speed bumps in. And the suggestion, the recommendation was striping and other speed deterrent devices around, so that still is the recommendation and [1:02:16] Speaker C (unidentified): what, and I would say we don't do it, that's too late now because we're going to plow it off, let's do it this spring [1:02:23] Speaker D (unidentified): striping, there you go, so [1:02:27] Speaker B (unidentified): I just want to bring that back, right, yeah, that determination whether or not the stripe, don't forget was that conversation about not putting, There's speed bumps in and drilling holes through the pavement, and yeah. [1:02:45] Hazel: And that still is our recommendation, is to stripe it and not speed bump it. [1:02:51] Speaker B (unidentified): And was there some conversation about the school, the speed bump school, or the time zones? [1:02:57] Shannon: Oh, that was the time zone. Yeah, that was from there. [1:02:59] Speaker B (unidentified): So it was just a Spanish thing? Yeah. Yeah, and the parents are the worst, when I used to drive Bond Road. Billy's late. Billy's late. [1:03:08] Speaker H (unidentified): Okay, and then my other one was the dam, so the management of the village dam. So right now the lake is low, but it's where the manual says it should be. Right, there's four boards in the five bays, four boards in each, so it's four boards high. The manual says on October 1st we're to remove two of the boards and leave two in for the winter. So right now we just, what, I took the two boards out in Friday of Philadelphia State weekend and the lake is where it's at. So then I've gotten a few comments about Lake Pocasset gasoline. Okay. Yeah, thank you. Yes, sorry. And then there's issues about the general store in their drinking water supply and that they pull the water out of the mill pond directly. So we're currently, there black water pipe is floating on the surface of the mill pond, which is where it's been the whole summer. But, so there's a concern that I dropped the boards, two boards, that maybe I could put a third board back and that would get their pipe. So it wouldn't freeze. It's all I said, I didn't tell these nice people that bring this to my attention. Just going for four or eight inches. It's just going to float eight inches higher than it's currently floating for the pipe needs to have a concrete block attached to it and brought down low. It doesn't have to be sunk into the mud, but you could just put a rope and tie it to the black pipe and keep the pipe a couple feet off the bottom of the milk bomb where it won't freeze. But it's not the dam keeper's job, and I said I do not, I could go fix it today, but it's not my job to fix their water pipe. Right, I go there crack the pipe and Yeah. And then, so I tell the people that we're going to meet today and Henry is one, Lloyd Erland is another. So there are people that are concerned about the big picture. So I'm concerned about the big picture too. But I said, I don't want to make a decision that's outside the engineered manual for the dam. I don't want to put a third board in where the manual says it's not supposed to be a third. Because then if ever forbid anything should happen, and we're not operating the dam in accordance with the engineered manual. Well, did the manual take into effect that there was drought? I said, the manual took into account all rain history of this town till 2003 when the manual was put together. So yes, but they didn't know what the rain conditions were gonna be in 2026. Well, why not? So I just- [1:05:50] Speaker C (unidentified): Do you feel that the level of the lake is where it typically is? [1:05:54] Speaker H (unidentified): Well, so I talked to Wayne Bryant, who did it for 25 years. So Wayne would leave a third board in just because it makes it easier for him to pull docks and boats and stuff in the fall. But it makes it a lot more difficult to pull the boards because we're supposed to be down to one board in March. Aren't and when the water's high and rushing and freezing cold icy he's slipping and sliding and trying to pop more boards than he needs to whereas currently the manual would have me just have to pop one board out I didn't see what was it from the manual that's my engineering brain but for people's concerns and Hazel if you hear it I that's where I'm coming from so I'm happy to go put a third board in but I don't want to do it unless I'm I would suggest that you came back [1:06:47] Speaker C (unidentified): From this meeting and that the recommendation of the landowner is that they should put a weight on their waterline it's up to them they should sink it very easily done there's no reason why they [1:06:59] Speaker G (unidentified): Couldn't do it but I you know who's going to tell them nobody I don't know nobody should tell them [1:07:05] Shannon: That they can call the town office yeah I've been given a recommendation to sync their line because it's currently floating yeah and I should take a picture [1:07:16] Speaker E (unidentified): And then the recommendation will be to sink it and it's not the town's responsibility right no [1:07:22] Speaker H (unidentified): It's you're at risk why would I want to mess with someone's can you come tell me what to do with my [1:07:27] Speaker G (unidentified): Online that was more hurdle why would you tell these people what to do with their wall I would [1:07:32] Shannon: Recommend it I wouldn't tell them what to do but I would recommend it because obviously when you come back to the policy there was a structural engineering done on that dam if in the spring now we are not following that policy and like Brian said if suddenly there's a damn failure because of all of the spring runoff and we have significant flow then who's liable for that the [1:07:53] Speaker G (unidentified): General store or the town I don't think anybody in the town should be responsible for somebody's private water supply. Or get involved in it. [1:08:02] Speaker C (unidentified): The problem is they're asking. [1:08:06] Speaker B (unidentified): It did come up at the Select Board meeting this week. The concern that last year the pipes froze at the general store and did all kinds of damage. A pipe that's exposed. But I think if you're operating under the standard operating procedures for the dam, regardless as of what the previous dam keeper did then at least you've got i'm not speaking for the select world i'm speaking for myself but at least you've it's backed up by something so i think you should [1:08:38] Speaker H (unidentified): make your recommendation to shannon and so maybe yes thank you so i don't think you shannon you should tell them what to do to fix it i think you should advise them they should get a plumber or a war supply expert to look at their situation and try to ensure that it doesn't freeze it's not [1:08:56] Hazel: but we all know the simple fix is time. We're thinking yeah, but if they do that and there's a problem, then we got then you've taken liability. Just don't tell them what to do, you [1:09:06] Speaker G (unidentified): should do anything. I don't want to do anything with my water supply when it's ice around it. [1:09:13] Speaker H (unidentified): Then he'll figure it out. Okay, I don't want anything to happen, personally I don't want anything to happen to them, right, but I don't want as my if this is my role with the town, I'm not comfortable advising that personally. Yes, all right, I have something in anything else that was my two things. All fed area related, that neighbor there has plus posted signs over where our gravel is to the left. Should we get that line surveyed [1:09:46] Hazel: because yeah, let's just worry about that. I think he's way off where the where the gravel used to [1:09:52] Speaker G (unidentified): be where we stockpile the gravel now. There's a post inside 20 feet this way of the stockpile. [1:09:58] Hazel: We really should know where that line is. You go into the left, yeah, that's where Pike has their [1:10:04] Speaker G (unidentified): equipment, yeah, like when a pipe pack their rollers all the way to the left over the property line. We [1:10:11] Hazel: really shouldn't know where that line is okay so the recommendation of the board is to have that at least that line of the property server that line surveyed don't know why we wouldn't know [1:10:21] Speaker G (unidentified): with that line. Really, and I said maybe it's further this way, but we ought to know. Okay, [1:10:25] Hazel: so the recommendation of the board is to have the town survey. That's not a recommendation here, so it's it's a recommendation. Okay, it's a recommendation, we recommend we'd like to do more but we can't. Okay, all right, so is that our with the board? Yes, okay, so that's our recommendation is to have that at least that line surveyed, if not the whole plot, anything. [1:10:51] Speaker G (unidentified): They build a pothole which road? Yeah, okay, and pothole by that new house I live on Pesca. Yeah. [1:11:03] Hazel: That was going to be my next one of my next questions is when we make this feedback back to the to the road commissioner Shannon to our satisfaction and I'm talking about the whole committee even though I don't make very many recommendations are our recommendations being looked at and completed or not completed or are they not being worked on if we find a bad spot in the road or that kind of thing. [1:11:38] Speaker B (unidentified): Sure can you talk about your process either now or the next meeting on how you keep track of all of these requests whether it's a townsperson who wants a tree removed somewhere or somebody's reporting a pothole or something else and then you know. [1:11:55] Shannon: Lists of contractors and how you go out and get prices yes so I have a list of different things I do understand what Mark's saying as far as the washout and the pothole with the pothole law of making sure that you know if there's anything that could be a cause for defect to personal property, such as vehicles, then it needs to be taken care of within 24 hours. I should put out a notice policy on how to formally submit some requests to the town. Right now, I've been taking by voice. I've been taking phone calls. I've been taking emails, voicemails. I write everything down. And then when I get a substantial number of requests in one category. I try to go out and handle all of that. Perennial farms in the corner of Mount Pisgah are definitely something that do need to be responded to. I did respond to the Mount Pisgah one at one point. It just didn't get done when they went out to do the potholes. And so that's something. And that's also part of the NOS requirements for the state law is it does not necessarily need to be fixed within 24 hours it needs to be addressed within 24 hours and whether that is just sending someone out to take a look at it putting a comb putting a sign putting something out there or acknowledging it in one way or another but yes I do have a list and I'm trying to get down through that list and I have a spreadsheet that I have and you have a. [1:13:35] Speaker B (unidentified): Spreadsheet of people you can call when your list needs dealing with yes and I do have to give some. [1:13:41] Shannon: Follow-ups because I have put in requests for signs to be replaced that has been ongoing with a certain individual for months. I have requested Tempe Bridge and Maxim Road culverts to be addressed with beavers that has not been handled. So I do need to follow up with that individual as well. But it's a matter of following up with the people that I also requested from because it does seem that even though I request it might not get done right away or it might not get done in a week or two weeks and then it just comes down to a timing thing. Brian are you [1:14:16] Speaker C (unidentified): going to be out when plate does the they left like the driveways and stuff to come fill in again. Are you going to be around them like you have been at all they missed when they did the Walton Road side they ground out there's a it's very little but there's a hole and it's going to get bigger that's all right why they love that one little it's like it chipped out yeah it's like a piece [1:14:39] Speaker H (unidentified): of the old road chipped out they sprayed it they sprayed if they could just you know something with that well they because they also left the very roadside so they're going to be in the end [1:14:49] Speaker C (unidentified): yeah when they do that they use that other little piece on just a check about that but yeah I did [1:14:54] Speaker H (unidentified): see that actually okay yeah just but you know yeah Mark does it as well as I'm sorry he's [1:15:02] Speaker G (unidentified): out there so we requested that they fix a couple of spots on Pawn Road and I haven't I drove there [1:15:11] Speaker H (unidentified): yesterday they did so the best the best they could you can see where they sanded applied more stuff you can see where the compactor the plate compactor scraped up the asphalt right it's right near your house across from Trim where the log cabin is right in the middle of the mat yeah [1:15:27] Speaker C (unidentified): the other thing is that a joint wasn't very good down by Newcomb's Corner right after Newcomb's Corner by Mercier's place used to be that was the overnight joint if you're headed northbound down you'll hit it I don't know why they couldn't get the butt joint better though [1:15:48] Speaker H (unidentified): they're very responsive like if you just point out to them if they fix it while they're here right so their intent is they're going to finish paving all the roads and then they're coming back to do all the driveway and the handwork okay it's funny how they did some when they're going by and [1:16:05] Speaker C (unidentified): others they did like why did they do Walton Road but not Berry Road I think it only reaches out [1:16:11] Speaker G (unidentified): The little side thing that only goes out so far, yeah,, yeah. [1:16:15] Hazel: Okay. Anything else? So the next question is, when do we have our next meeting? [1:16:27] Speaker C (unidentified): Can I suggest December 14th? [1:16:29] Speaker D (unidentified): It's the only one to have open. [1:16:32] Speaker C (unidentified): What? December 14th. This is November 1st, basically. [1:16:37] Hazel: Yeah, so six weeks. Yeah. Do we have anything that's critical before then? [1:16:45] Speaker G (unidentified): No shoulder, that's just her getting the beds and doing them, that should be just done, okay. [1:16:56] Hazel: Yeah, because we've requested, we've recommended that it be done, we've recommended it be done with three-quarter minus, and so then that's, that's our recommendation to the, to the, to Shannon, it so that's done really, so there's no, the shoulders aren't, aren't critical on the roads that we've done, I eventually, I hope we're going to talk about shoulders on roads that haven't been done for three years, so but that's not now, that's not today, yeah, right, I'm just really pleased that we're at least three months ahead, looking three months ahead, and now we're looking, working two weeks ahead. Thank you guys for that. And for Shannon, for doing the work. Is that work for you Brian? 14th is tough. [1:17:51] Speaker D (unidentified): Is that a Monday? Yes. I'm supposed to be back in, [1:17:57] Speaker H (unidentified): can we do the 7th after? [1:17:59] Speaker C (unidentified): Not good for you, David? The 14th is the only. [1:18:02] Hazel: Well, it has to be Monday. It's actually the only Monday too. It doesn't matter. [1:18:10] Speaker C (unidentified): Right, I can, December 2nd is a Wednesday, do this man, I could do that, yeah. [1:18:20] Hazel: It's all right with me, okay, so December 7th, second, okay with you Shannon? Yeah, okay, the same second, 8 30. I'll try to get it right in the minutes this time, yeah, it's Wednesday, so just gotta remember it's a Wednesday, okay, so that's, that's our next one, December 2nd, 830 to 830,, 830.