← Back to MaineScanner

Berwick Planning Board Approves Energetics Manufacturing Conditional Use

2026-10-29 · 1h 15m · Source: Planning Board Meeting • October 29, 2026 (Berwick BCTV22 (YouTube))
Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[0:00] Chair (likely Rick Raines or George Clausen): Good evening everybody. Welcome to the Town of Berwick Planning Board meeting. This is a special extra meeting on Thursday, October 29th. If we could all please rise for the Pledge of Allegiance. I pledge allegiance to the flag of the United States of America and to the republic for which [0:21] Board Member (likely Jeff Brooks): it stands, one nation under God, indivisible, with liberty and justice for all. [0:29] Matt Harper (Jensen Hughes): All. [0:33] Chair (likely Rick Raines or George Clausen): Right, and I will introduce my board members. To my left I have Jeff Brooks, you will be a voting member tonight Mr. Brooks. I have George Clausen, vice chair, Rick Raines. To my right I have Niles Shore, Daniel Hook, Terry Wilson. Our code enforcement officer is here, and James Bellissimo, I think he's still just the town planner, is also here. It's the formal title, just the town planner. Moving on to the approval of minutes for October 15th. I do have one thing that I think should be added. It is mentioned in here when I recuse myself, but there was a point when I did resume the chair and I think that should be added in there. So does anybody else have any other amendments? Yes, the [1:22] Board Member (likely Terry Wilson): piece where I thought, you know, we were talking about the third party review, or actually it was James who was talking about the third party review that was requested, and that it kind of makes it sound the way the minutes are now that the board requested it, and the board did not request it. So which one was that [1:44] Chair (likely Rick Raines or George Clausen): under? Sorry, news because we had Megan's Meadow, which was which was approved, so [1:55] Board Member (likely Jeff Brooks): then we had Northland Drive. I can read it to you if you like. Yeah, the board [2:00] Board Member (likely Terry Wilson): The board recommended that no bolding permits be issued after the first six slots until homeowners association documents are provided. A third party review has been requested. Oh, okay. And then it says, James Bellissimo, race pedestrian circulation. So you know, that makes it sound like the board requested this and the board did not request this third party review. So you know, I would say we should replace it with staff reported that a third party review had been requested by staff on October 9th, 2026. No board motion or vote authorized the review. [2:37] Chair (likely Rick Raines or George Clausen): Perfect. Does that sound accurate? I was not on the [2:41] Board Member (likely Niles Shore): board for that. Yeah, it could be another discussion for informational items about what we want to do [2:45] Chair (likely Rick Raines or George Clausen): procedurally. Okay. We should talk about that. In reflection of this, like, yeah, or just in general, I just in terms of procedure I agree, procedure for [2:58] Board Member (likely Jeff Brooks): third-party review. Yeah, yes, I want that on the agenda for a meeting so we can [3:03] Chair (likely Rick Raines or George Clausen): Discuss that. Okay, we can discuss it today. Excellent. Yeah, so we'll, so we'll have that amendment also. So I'm looking for a motion to approve as amended. I [3:16] Board Member (likely Jeff Brooks): I will make that motion. All right. [3:19] Chair (likely Rick Raines or George Clausen): Second. All right. I have a motion and a second. Any further discussion? No. All in favor of approval as amended? Perfect. I'm going to abstain. You're abstaining. Okay. Daniel, abstain. All right. A lot of people are joining, but these are all Jensen Hughes people. [3:42] David Sazansky (ATP/General Biological): I believe they're all. I can't actually see. But they're there. You have questions that he doubts that I can't provide.
Unfinished Business
[3:48] Chair (likely Rick Raines or George Clausen): Okay. I'm just wondering if any of them are here for public comment. That's all. I'm going to open up public comment. I doubt they are. Usually we would get like a heads up. James wouldn't know if somebody was on Zoom for public comment. So we'll just skip this first public comment, actually, because there's nobody here. And these are all engineers. We have no public hearings tonight. And we're going to move on to unfinished business. So unfinished business for the conditional use at 500 Portland Street. Energetics manufacturing, R&D. This is in the industrial zone, the RCI zone. Oh, R&D industrial, RCI zone. MAP R72, Lot 17, General Biological Corporation, DBA, AT Process Technologies. [4:36] David Sazansky (ATP/General Biological): Come on up. So, just to start off, you know, thank you so much for all the time and thought put into this so far. And a special thank you for the extra meeting. It really is appreciated. It. I have a little spiel, but it is in the packet and there's no one here. So would you like me to [4:55] Chair (likely Rick Raines or George Clausen): run through that? So I read it and I thought it was so good. I mean, I don't think you need to read it in its entirety. Did everybody have a chance to read ATP's basically letter to the planning board? I have not. Okay, perfect. Why don't you give us an outline of it? Because I thought it was. Can you just first introduce yourself to the public, please? Thank you. [5:15] David Sazansky (ATP/General Biological): David Sazansky, CTO and co-founder of ATP slash General Biological. Yeah, sure. So high-level things, thank you so much. The big points that I just wanted to bring up front is it's a very highly regulated space. There are many, agencies and departments that oversee us and who we have engaged with at a high level but can't really get into much more detail with until we have confidence that we can occupy the site. I've attached a sort of summary of like all of those agencies that regulate us, what parts they oversee, what enforcement authority they have, what ongoing compliance tasks they add, and at what stage they kick in. The packet second part was that, you know, I just wanted to highlight that this is an RN an R&D site to start, you know, it's manufacturing equipment manufacturing, but early on it will be equipment prototyping development. And so this means two things. One, it means that a lot of the details are not yet firm, which, you know, it's not so great from a planning board perspective, but to it means that a lot of the details are not firm so that they can be changed to accommodate the requirements of the zone and the request of the community. And then the last thing was that since we started this process a few months ago, we've had a lot of really encouraging success both in the lab and in the government, and we have several contract agreements ready to execute with different offices within the Department of War, for which we need a site. And one of the items that it under the means we're under DCMA regulatory framework basically from day one, it means we need that full earth covered magazine, which means we need to get some concrete in the ground soon. So this is why I appreciate the special meeting, and once we come to the set of conditions that we all agree on, Terry will be hearing from me shortly. And yeah, I just hit high level points from things that I felt I didn't do a good job of addressing last time. On noise, I didn't have a clear answer there. I laid out basically to comply with the standard of the zone, assuming that the source of noise is on the test pad and the closest area of the lot line is about 640 feet, the equipment would need to be louder than 131 decibels, which is basically jackhammer or close-range ambulance siren, which I can promise it would be much quieter than that. Although we are in an industrial zone, we do have, we acknowledge we have residential neighbors, and you know, although that standard doesn't apply in this case it's useful guidance. So the from the test pad to the nearest residential abutting lot is about 710 110 feet, which would mean that if direct line of sight, that equipment would need to be emitting about 117 decibels to register 60 decibels at that hotline, which is, according to Google, about as loud as a live rock concert. But between us, the pad, and that abutting line, there is a 19-foot earthen berm, two buildings and a stand of trees. So actually, it would have to be substantially louder than that, and we're only operating in the day, so that nighttime noise standard doesn't apply. On the environmental impact, I attached some notes that Neil had prepared, basically outlining the correspondence that was had with IF&W back in 2020, where they basically said that they did not have any concerns with regards to essential habitats or protected species within the envelope of development, which we're staying in. Highlighted some, basically, statistics around hazmat transportation, not with the goal of saying that this is not dangerous, but with the goal of saying that with the appropriate controls, hazardous materials can be handled safely, routinely, and every day. Can I just interrupt? [9:02] Chair (likely Rick Raines or George Clausen): Was this packet, full packet, made available to the public? Okay. Because I thought it was eye-opening, the research that you put into it, talking about, because a letter that we got was about the transportation of hazardous materials, and when you really broke down like how much hazardous materials are transported in the United States every year how much you know how many incidents there are like over the last ten years there was like it was a very small it was like a handful in ten years out of millions of pounds of energetics transported so I'm glad that the public has an opportunity to see that because it was educational for me so I'm sure it [9:47] David Sazansky (ATP/General Biological): would be educational for them yeah no it's it's it's always i mean i personally really like dot transport regs and hazmat stuff but it's just always eye-opening to see how common hazmat is everywhere even though it's usually not labeled with the actual chemical name you know if you're walking down an aisle in home depot and spotting wow there's a lot of stuff in here and how much is routinely moved around especially under limited quantity exemptions which are those diamonds with the white stripe in the middle the black on the top you might even like if you get an amazon package with that there's hazardous materials in there yeah but what else did i have oh there's a there's an attachment in here about the physical security plan the most important section of that is up front where their standards are listed i then wrote a memo of like this is our current plan as of this moment is possible that a dcma examiner will say change x y and z but the standards that apply will not change And a lot of those in the PDF version of this are viewable, of their public. I included a, the quotes we have for insurance that we intend to bind once we take occupancy of the site, which I acknowledge the quotes are expired, but we, you know, this together a while ago, so we're in the process of renewing those. Wants to call out that those were created with the insurance broker through detailed review of our, you know, intended process, the chemicals we intend to have on site, their quantities, and that. The both policies are through what's called a surplus lines insurer, which is an insurer that specializes in weird stuff, an unusual risk. And the pollution policy specifically kicks in three different situations. One is paying for cleanup, injury, or property damage and legal defense in the case of a release on the property or if it migrates off into the soil, groundwater, or neighboring land. It covers it both if a neighbor, an agency, or any third party makes a claim against us. It also kicks in even if. There is no claim, if we discover our own contamination, which a lot of policies don't, and that creates weird incentives. It covers releases for the company's materials well in transit. If a spill occurs, usually that's the liability of the carrier, but if it can be shown that we improperly packed something or did not declare something in the right way, it kicks in there. And then it also covers pollution that arises from our waste even after it's been sent to a off-site facility, because under RCRA, EPA. Rules, the generator has responsibility from cradle to grave, is what the statute actually says. And then way in the back there is the engagement that we have with Green Side Services for spill response, and whom we're also working with for the spill response plan, stormwater monitoring, groundwater monitoring programs. Those are not complete yet, so they're not in here, but we've engaged with them with that, and they were selected because they have a service center in Dover, and we wanted to find. Basically, the closest possible responders and the external hazard analysis from Jensen Hughes is finalized because I know that was asked about last time and it's in there. And also joining us on the call, our is our team from Jensen Hughes who are have been our advisors and partners and assisted us with basically every aspect of this project. Collectively they bring decades of experience with explosives hazardous material safety and emergency response planning, and I just want to make sure that any and all questions get answered as fully as anybody wants basically, so to the extent that I can't answer they certainly are able to. So I don't know if the Jensen Hughes team wants to introduce themselves. [13:36] Chair (likely Rick Raines or George Clausen): They're all on mute and off camera. Oh, there they are. Hey. I feel like I'm at work. Hey, folks. [13:43] Leonard (Jensen Hughes): Hi. I am, hi. We're all coming on. There you are. If you wanna see our faces, we can totally stay this way. I just wanted to step in and say hello. First of all, thank you guys for the opportunity for letting us join you tonight. We appreciate it. This has been probably the most professional town hall I've ever attended, so kudos to you. Oh, wow. Yeah. Strong work, Berwick. My name is Marissa Dewey. I'm a certified explosive safety officer and system safety engineer. Come from about a decade or so of experience with the Department of Defense. Before that I was a paramedic, so yeah, very community driven person by default, not just an engineer, actually care about the safety of these operations and assuring their safety, so I'll step off and let my colleagues introduce themselves. Elaine, thank [14:36] Matt Harper (Jensen Hughes): you. I'm also the co-lead for the CBR&E group at Jensen Hughes, the chemical biological radiological nuclear and explosive safety. I too did about 20 years as a paramedic and firefighter and has my specialties, so also used to serving the community. I was also the operations lead for a very large army program that safely destroyed chemical weapons stockpile in Kentucky. And of course, I mean, the whole team here would kind of share a lot of experience with DOD. So I'm going to go ahead and let my or we're either one speak. [15:20] Leonard (Jensen Hughes): Hello everyone, Matt Harper, Jensen Hughes, over 30 years as a technology generalist [15:27] David Sazansky (ATP/General Biological): specializing in integrated security platforms for military design-build projects. Thank you for having me. [15:33] Leonard (Jensen Hughes): Better bring up the rear introductory sequence. I'm Leonard, the honorary certified emergency manager with more than 40 years in the fire service, highest ranked fellows, a deputy fire chief over training and operations. I've served in fire departments as small as eight and as big as 1,500. And my specialty is emergency planning, and I'll be doing the emergency plans for the site that meet all state, applicable, local, and even the Department of War requirements for safe operation of a plant. All the emergency planning that will pass through me first and then onto the specialist you see here with the background and seabird and [16:16] Chair (likely Rick Raines or George Clausen): energetics. Thank you for having us tonight. Thank you. Thanks very nice. I'm sure you guys had a chance to review that the Jensen and Hughes study which was awesome, also full of chock full of information that was very helpful. Are you guys looking for me to do something? So were there things in your notes? I was looking at the South Berwick because South Berwick sent that memo at the end of September. It looked like I was looking at there, the South Berwick one. Yeah, oh yeah, I read it. We're have we sent over any more information to them? Are they just relying on us to kind of take care of their concerns here? Yeah, I just didn't know if they got the this updated packet. I think they probably follow along. I think so. I so I had one of the South Berwick town council members reach out and meet with me just to answer questions and whatever, and they she said that they fully supported our decision and thought that we were handling it fine, just they had some proposed conditions I think [17:36] Board Member (likely Niles Shore): a lot of them, if not, I don't know if every single one verbatim was made into the conditions, but I think a lot of it was made into the post [17:44] Chair (likely Rick Raines or George Clausen): conditions. Okay. I thought so, too. There was, I forget what it was, that I had made a note of it, of what didn't make it to the conditions, but was there a reason that we didn't put that in conditions, or? [17:58] Board Member (likely Niles Shore): I guess I'd have to look at what that note was, but I don't recall off the top of my head. [18:04] Chair (likely Rick Raines or George Clausen): they're they wanted to limit the quantity of RDX stored yeah that's in there contaminant of testing operations require all areas where RDX is manufactured handled or tested to utilize impervious surfaces and secondary containment I think you have that right it sound it sounded like the chemical storage and the test pad both have that's that's the skid also has a [18:29] David Sazansky (ATP/General Biological): built-in spill and trace, so technically it's tertiary containment on the pad. [18:34] Chair (likely Rick Raines or George Clausen): All solid and liquid waste associated with RDX production or testing activities be properly characterized, stored, removed from site by licensed contractors at regular intervals. I think that's maybe not necessarily a condition, but part of the plan. Emergency response planning, we have a full professional team on that. Was it stormwater monitoring that didn't get in there? Development and maintenance of a stormwater monitoring program including sampling protocols reporting requirement [19:07] Board Member (likely Niles Shore): That is that is that is a spit as a condition it is in there [19:10] Chair (likely Rick Raines or George Clausen): Okay, and then require the use and maintenance of appropriate track out prevention measures including personnel and equipment to decontamination practices where warranted to minimize the potential migration of RDX containing [19:25] Board Member (likely Niles Shore): any materials that was the one, that was the one, because from my understanding they were, I don't [19:31] David Sazansky (ATP/General Biological): think there'd be RDX being tracked out, right, that would be, yeah, so I mean on the, on the pad itself, the stormwater, the swept, the stormwater pollution prevention plan, basically the way that would work is that whatever it rains, the pad's going to fill up with rain, there will have to actually be testing and logging of the water that's in there before any discharge. If there's ever enough RDX on the ground that people can track it out on their boots, we've, I mean, that's bad. That's like, you have to, we're going to have that cleaned up by a spill responder there. So it's something that we can institute. But I mean, if that's like basically washed down in there, we can do that. And then that water would be covered under the SWEP as well. But yeah, it's kind of, it's like a sort of a, if this was considered manufacturing that was permanently installed, we would be required by state law to have that pollution prevention plan in there anyway. It's a little bit of a gray area because the stuff is not ever permanently there. It's coming out and then being removed. It's not a problem to do. We have one in Louisiana. It's pretty standard practice. [20:37] Chair (likely Rick Raines or George Clausen): So that's fine. Well, if I mean, if it's not a big deal, we can put it in and that would completely satisfy South Berwick Water District, which we have much respect for. And we're within like 500 feet of them, right? We're talking about the personnel and equipment decontamination. So they're going to wash down, do a washout or wash down? Yeah, it says require the use and maintenance of appropriate track-out prevention measures, including personnel and equipment decontamination practices where warranted to minimize the potential migration of RDX-containing materials from production and testing areas. And what are you proposing to do? [21:20] David Sazansky (ATP/General Biological): I don't have a concrete plan there because I'm trying to think of, like, whether that would actually make it not worse, but just generate more water that would have to be discharged. If like that was the condition that was applied, what I would do just standing here right now is everything would get washed down before leaving the pad. And then the pad is not, you know, free discharging. You have to manually discharge that. That water would get tested prior to discharge. Right. The only reason I'm hesitant there is because I think washed down water is treated separately from stormwater under most permitting. I'll have to think about that. [21:51] Chair (likely Rick Raines or George Clausen): But it can. Does Neil have any? It's as far as it seems like they're more. Yeah. [22:01] Neil Reposa (Civil Consultants New England): Neil Reposa, Civil Consultants New England. I think it sounds like South Berwick's more concerned with individual and individual like vehicles like tracking RDX materials, which I don't think is really applicable or appropriate to this one since it's not something that's being manufactured. If it was an RDX manufacturing facility, I could see something like that being applicable. For this one, since it's really the manufacturing of those components and not the RDX itself, I don't think it's significant enough or, you know, prevalent enough on site or in the facilities that it would, it would make sense to have those inside any of the areas like David was saying. The test pad would be the only place for it, and that's, that's kind of already all encompassed with testing and everything. So okay, that's, yeah, that'd be [22:52] Chair (likely Rick Raines or George Clausen): my take on it. I was thinking, and then I mean, is it really, yeah, is it necessary? Well, that's what I'm thinking too, is it necessary, and is it something that the water department themselves would be concerned with also, or is it just a general concern? It's not like, you know, can we [23:12] Board Member (likely Terry Wilson): a potential condition if RDX is found in sufficient quantities in the water beneath the test path [23:21] Chair (likely Rick Raines or George Clausen): I don't think we're testing water beneath the test pad though. This is like the storm water [23:25] David Sazansky (ATP/General Biological): that gets contained. Oh yeah, because that would imply some failure of control [23:30] Board Member (likely Terry Wilson): elsewhere. Yeah, sufficient quantity of RDX is found in the storm water that right, then it's [23:36] David Sazansky (ATP/General Biological): Getting out, yeah, and then the sufficient quantity is a measurable quantity of any kind, just right. [23:41] Board Member (likely Terry Wilson): In that case, a, like, this hazmat response, wash down response would be required to be. That makes sense. [23:49] Chair (likely Rick Raines or George Clausen): That makes sense. Are you writing that down? Are you writing something else down? Construction entrance to prevent track out? [23:57] David Sazansky (ATP/General Biological): I would think it would be washed down before you leave. [23:59] Chair (likely Rick Raines or George Clausen): Okay. And that would take care of the track out as well? Yeah. Okay. Because it would just wash it off, contain it. Will that be in your emergency plan? [24:07] Board Member (likely Jeff Brooks): We can, I was going to say, I did want to jump in. Yeah, no, please do, please. Awesome, one [24:14] Leonard (Jensen Hughes): of the things, so we address that in two ways actually, with the, with the site safety plan, the, and as well as the emergency plan, so both of those kind of approach that potential, like, concern, I guess, in two ways. Part of that is the operational rigor that we attach to the site safety plan by virtue of the fact that these are things that we have to do to keep that safe, and the other part is the emergency plan. The way that we address that is it's required to have clean work procedures, so in other words, housekeeping is required as they work, and that's a normal lab procedure as well, like clean bench, clean work, but that is required of the energetics, that's a step that general biological is taking anyway. The second way that we address that is through personal protective equipment, so typically within these operations, personal protective equipment is worn and it's disposed of properly as opposed to tracking out. So you wouldn't have people working, in other words, with these particular materials that they can get on their person or on their shoes or on their clothing or something. So we have those isolation barriers within those working zones to keep the stuff at the facility, keep the PPE and people separated from those particular risks, but we also keep it within the confines of [25:26] Chair (likely Rick Raines or George Clausen): of the process thank you that's excellent super well that answers our question i don't think we need an extra condition for that 's great that's a simpler answer just taking pd off before [25:41] Board Member (likely Jeff Brooks): you leave the pad is, yeah, that makes so much sense, yeah, thanks for inviting them, yeah, well [25:46] Chair (likely Rick Raines or George Clausen): listen, that's why we have, you know, that's why we have these technical people that make sure that we're in compliance. Elaine, do you have something to say or you just, well, what I was going to say [25:55] Matt Harper (Jensen Hughes): Way too is vehicle in the site plan. We also put that vehicles couldn't be within a certain amount of feet of the area, so the chance of the getting on any vehicles. No personal vehicle should ever be in that area, so ddesb is something that requires standoff, basically distances, so vehicles [26:17] Chair (likely Rick Raines or George Clausen): at that point shouldn't be close enough to track anything. Awesome. Right, so I read the Jensen Hughes report and there was a list of key recommendations at the end that I imagine you're going to follow. Yes, I mean, I can go over them. I don't know if I'll pull that up right now, but I they're in the report. They're very straightforward, easy to understand, and laid out there for us. Does anybody so you want to talk about the third party review [26:52] Board Member (likely Niles Shore): Yeah, I can just make a note that we've reached out to, I think it was four third-party reviewers, and we eventually got a fifth contact who said that there really isn't much to review, that the explosives report is prescriptive in nature. They said it was a good job, and the money would be best spent during the permitting process. [27:18] Chair (likely Rick Raines or George Clausen): Yep, and I think so. So, I mean, there's so much oversight with this through many different agencies that are much more technically aware of these regulations than the Berwick Maine Planning Board is. And I think it's okay to rely on these wonderful people who have expertise in energetics and whatnot in this instance. [27:43] Board Member (likely Niles Shore): Is it routine that you would share any communications from the ABC agencies with Terry [27:52] David Sazansky (ATP/General Biological): Some of them, yeah, some of them probably, others probably not, but which one are like state ones for sure. Yeah, emergency planning of course has to be done with the local responders as well. Yeah, and that's that's that's in here as well, of course. Yeah, those would be worked out with local police and fire before any operation started at the site. I do have a [28:16] Chair (likely Rick Raines or George Clausen): question for James. So if there's a major change, let's say they you know go forth and there's our it's R D to begin with, right, until you find exactly what to do with your skids or how to manufacture what it what it entails. If there's a major change, then they would come back to the yeah, just about any change to the site plan. Okay, you know, if so if a location of something changes, if the size of something changes, that would all flag any of the chemical locker, test pad [28:48] Board Member (likely Jeff Brooks): magazine, new buildings. Okay, your scope obviously. Yeah, we have to file the chemical [28:55] David Sazansky (ATP/General Biological): inventory with the fire department too, so if there's a something that raises eyebrows, we're [29:02] Board Member (likely Niles Shore): To address that also, but would you notify either James or Terry if you do choose to take that option after 10 years on your lease to extend it? Sure. [29:15] Board Member (likely Jeff Brooks): Yeah, you're gonna remember that in 10 years. Yes, I'm gonna, I'm gonna read back. [29:27] Chair (likely Rick Raines or George Clausen): A very intelligent engineer made a note that the chemical storage container should be on a level concrete base. Is that your plan? [29:36] David Sazansky (ATP/General Biological): Yes, there's a patch on there. I [29:41] Board Member (likely Jeff Brooks): don't know if it's a question so much as maybe a clarification. I know that your company and this project has a lot of technical details about it that the average citizen in Berwick may not either know or follow along with. Certainly, I struggle, too, with all of the expert information that you guys need to have to produce your product. but i 'd like to ask if this is a an accurate synopsis of what we're looking at here on this property by your company you are not making bombs on this property by your company you are making machines that mix chemicals that create a substance that's used elsewhere for a lot of different reasons including explosives but you're not making bombs [30:38] David Sazansky (ATP/General Biological): on your site, period. Correct? I mean, I'd say most of the places that get you, it's good, it's getting used, isn't explosives, sure, but yes, otherwise that's reasonable. [30:48] Board Member (likely Jeff Brooks): Because I know it would be easy for people to hear about this project and hear the word explosives and immediately think the entire, you know, York County is going to blow up, which is obviously an exaggeration, but people take things to extreme, and I know that we are paying attention to the technical and safety and permitting and ordinances to make sure that you satisfy what we are, what we want. I just wanted to kind of simplify it in case anybody else had a notion that you're something different than what you really are. That was more of the statement, I guess, one question I had, and correct me if I'm wrong, your original plan was for a thousand pounds maximum of RDX on site, and you have said, I think, repeatedly, you know, we're gonna test our thing and it makes whatever 10 pounds, 20 pounds, and we're going to sell that and we're going to ship it out. I guess my question would be, why a thousand pounds max? [32:02] David Sazansky (ATP/General Biological): It's a number that allows us to stockpile a number of different, I mean, it is sort of, as you can tell, kind of a nice round number. It seemed like a reasonable distance that kept some, a reasonable quantity that kept some of the site outside of the inhabited building distance for site planning purposes. But there wasn't a lot of rigorous analysis that went into that number. Well, it's a condition on here, so that's fine. It's a ceiling. It's a comfortable ceiling, that's fine. Did you tell [32:29] Board Member (likely Niles Shore): me a little point? Good, yeah, go ahead. Did you tell me, or maybe I heard it in some of the conversations, that a thousand pounds was like the smallest number that actually had data behind it [32:40] David Sazansky (ATP/General Biological): for studies? No, I don't know, that's not, I mean, actually we have, we have folks on the call who can comment here a lot about QD sighting, but. [32:51] Leonard (Jensen Hughes): Sure, I'll jump in. There's two ways to do this. Kind of the prescriptive normal way is to address that in pounds of what we call net explosive weight. We've studied the effects of all the way down to the gram scale, all the way up to 30, 40,000 kilotons, right, of the way that those things behave over time. There's about 70 years of studies that go behind the analysis that we're doing, and what David's team has done is taking the extra step of not only analyzing at that particular like ceiling but analyzing it all the way down to the gram scale. So we're able to provide an idea of the effects of that, the distances that are needed to keep everybody safe from that, and by everybody I mean everybody, including the ducks, the trees, the frogs, the people, all of it. So there's a lot of reputable study, a lot of history, and then of course we're able to take that additional step to do actual quantitative analysis and see, okay, what ceiling works for their operation, what do they realistically need, and what can we realistically store that's very safe, that has a margin of safety. So he's built in with that thousand pound limit about 32 times the normal margin of safety over the normal margin of safety to keep everything comfortable and safe and resilient with that. In fact, the magazine that's out there is actually rated for, I think it was 52,000 pounds of stored energetic high energetic materials, so it were very over engineered for what he's actually got [34:22] David Sazansky (ATP/General Biological): Out there, well, yeah, I mean, one driving factor is that eventually we intend to demonstrate continuous production, and you say, okay, let's say it's, you know, making 10 pounds an hour, and we're moving that off of the pad, you know, how long would you want to run it? Would you want to run it more than, you know, wander a few different batches to demonstrate. That's not for just FAT testing for the skids. That would be for demonstrating a capability for a research and development contract. [34:49] Board Member (likely Jeff Brooks): In your studies of blast zone and noise and, you know, the PSI of the blast or whatever at different distances, is always figured on if 1,000 pounds exploded, correct? [35:09] David Sazansky (ATP/General Biological): Yeah, it's always on the worst-case scenario. Okay. [35:15] Chair (likely Rick Raines or George Clausen): So there was also an economic impact and community integration statement, and I thought that was awesome, too, because you can ask James and Terry directly. Like, we don't get a lot of huge businesses coming into Berwick that are creating a lot of high-paying jobs. I mean, how often does that, how often do we see an application in front of the board? That's bringing in real revenue to the town. Very rare, I agree, so you're looking at eventually at full operational capacity. The facility will create 18 to 24 full-time permanent positions, highly skilled technical, operational, and engineering positions, with target average wage, wages between 110, 120,000 annually, and there's a note that says this compensation significantly outpaces the regional median, keeping highly skilled talent and robust disposable income within York County, and I thought that was a good thing to add, because it's something, and we did talk about you [36:24] Board Member (likely Jeff Brooks): guys having lunch at Maggie's. Oh, of course, every day, of course, and Sauce Box also, I guess, absolutely. But is that, can we make that, 's not actually a condition, I don't think you need [36:34] Chair (likely Rick Raines or George Clausen): to make that a recommendation. Does anybody have any questions? Have you guys had a chance to go over the findings of facts and conditions? Everything looks pretty detailed. I just have one [36:47] Board Member (likely Niles Shore): question. Assuming things move along as they have been, when would you begin operations? [36:56] David Sazansky (ATP/General Biological): Basically, as soon as we get through all these conditions by operations here, I'm, you know, saying we have chemicals on site, we're doing stuff with them. So for that to come into place, we need to get a stormwater protection plan written. We need to have the building permits for the both pads and the magazine. I need to actually get the chemical storage lockers installed, get the storage permits from ATF, where we see we kind of started that process but then, you know, paused it because just like Basically say, hey, we're thinking of doing this thing, do you have any major objections, and the state. But basically, as soon as we're hoping to get it up and running by the end of the year, but you know, this [37:38] Board Member (likely Niles Shore): Year 26, yeah, 2026, yeah. So when would you be hiring these 18 to 24 engineers? We're [37:45] David Sazansky (ATP/General Biological): Gonna hire a number of them right now. So, you know, folks to actually run this site, definitely looking for safety people, definitely looking for, I mean, security, it's not really engineers, but we do need that to start. Test engineers, QA, QC people. We have actually, we did just hire a, an automation and controls engineer who's technically commuting to Waltham, but it's from closer to this neck of the woods, and once the site is up and running, we'll be working at that [38:12] Board Member (likely Jeff Brooks): Location. David, could you just, for the sake of simplicity again, explain your [38:21] David Sazansky (ATP/General Biological): Security plan for the site? Sure. So basically what I was told is that we are employing a point security model and not a zone security model. And what that means is we're securing very tightly the sensitive areas within the site. So that includes the magazine, which is quite a substantial barrier. I mean, the door is six inches thick. And the chemical storage lockers, the buildings as well. The site itself has a high-security fence, which the one that's listed here that I'm getting some quotes on right now is this welded wire mesh. It is anti-climb and much harder to cut, so it basically has really small openings. So you can't get your fingers in. You also can't get bolt cutters on it. And because of that, you don't need razor wire on the top. And so I can get that powder coated in a neutral color. And then within the site, there's lighting on the buildings. There's some area lighting around the front of the magazine. That will probably be motion activated. And then camera coverage of the magazine, test pad, exterior of the buildings. We will have likely two security personnel there in the day. At night we're still sort of like deciding what the best path is there, but the plan is to have that being remotely monitored by the same company that monitors the cameras for our lab. [39:46] Board Member (likely Jeff Brooks): And both them as well. Okay, great. Along that vein, do you have any type of security plan for your own employees to make sure that, you know, things are staying on site that should stay on [40:00] David Sazansky (ATP/General Biological): site? Yeah, everybody, so everybody's background checked before joining. The keys for sensitive areas are very tightly controlled, and so it's not like everybody can just like walk in the buildings themselves. As a combination, I mean, this isn't, this is addressing the last question really, but it's a combination of like key card and pin pad access, so if you find someone's badge on the ground, you can't just waltz in. You need a second author, you need a second authorization. Yeah, and then the keys to the magazines themselves are usually kept in a safe that basically the site director has access to. Great. Can I add something? [40:34] Board Member (likely Niles Shore): Just to... Can I add something? Yeah, go ahead. Just to reemphasize lighting, just to make sure it's downward-facing, the correct color temperature, 3,000K, no stadium lights out there. [40:47] David Sazansky (ATP/General Biological): I asked several times, yeah, to make sure that I can get this light that complies with the appropriate standard. [40:52] Board Member (likely Niles Shore): There's some on Portland Street that are good. Most of them are really out of compliance. [40:56] Chair (likely Rick Raines or George Clausen): client because I do not look at the other buildings kind farms kind farms you can you look [41:02] Board Member (likely Niles Shore): at kind farms the idea of sure the showroom building the revolution motor works those are [41:08] David Sazansky (ATP/General Biological): good examples if I missed anything for folks on the zoom please jump in but yes please show your [41:14] Board Member (likely Jeff Brooks): faces go ahead oh no I was go ahead I was simply gonna just make a note that I think the biggest concerns, I don't wanna speak for the public, but what I was hearing from them, the biggest concerns is understanding what you're doing and safety and security. And it sounds like those are very thoroughly addressed. I understand the creating of an emergency plan takes into worst case scenarios, but hopefully thinking outside the box, a plane crash into your site or a fire not related to explosion but a fire or any number of different scenarios, there needs to be an emergency plan for as many general possibilities as possible. Don't trust me, they will make [42:09] Chair (likely Rick Raines or George Clausen): you have that. I mean, those things were actually all noted in that Jensen Hughes. Marissa, I feel like when your face show your faces, when your face, oh, okay, no, know it's fine. I figure when I see a face that usually means you want to talk. I understand how this corporate thing works now. No, it's fine. No, I was really just going to say our emergency [42:32] Leonard (Jensen Hughes): plan does, I think you guys have a copy of the external hazards analysis, the initial one, what we took a look at, including all the plane crashes and floods and trains and cars and all the things that we kind of look at to factor in, yeah, both natural and non-natural. But our emergency plan moving forward, and I'll let Leonard comment more on that, also anticipates those kind of, I don't want to say like day-to-day possibilities, but things that are probably more probable than an explosion, which has an extremely low probability but I know really scary potential to talk about. With that said, also the site explosive safety plan on the, on the matter of security requires really specific things to happen in order for this operation to be within compliance of that plan. And part of those things are dictated, like a two-person rule, for example. You can never have more, you can never have just one person dealing with the energetic material or the precursor materials for the energetics. You don't have anybody unattended within the magazine or the test pad area, in addition to those other layers that David's already discussed. So those things are part of the operational rigor, but they're also part of the requirements of the site plan, and that's, that's a plan that kind of moves forward through those permitting agencies and authority agencies as part of that approval process. So that's something that naturally falls within the operational rigor as well. Yes, go ahead. [43:58] Board Member (likely Terry Wilson): I have a question. So you have some explosive material that's manufactured while you test the machine. That goes into the magazine, that's immediately entered into, that's what you have in stock. So if something was to disappear, you'd figure that out pretty fast, wouldn't you? Oh, absolutely. [44:15] David Sazansky (ATP/General Biological): Absolutely. Yeah,. No, we're required to log anytime anything goes in or out. We are required to conduct an inventory. Well, we're not required to conduct an inventory every week. There is also a periodic inventory requirement as well. And if I'm speaking to ATF, like jurisdiction, but if they show up and your inventory is off, that's a big problem. And if any materials discovered to be missing, you have to notify federal, state, and then local authorities immediately. [44:46] Leonard (Jensen Hughes): Yeah, part of the site plan covers loss theft and prevention, so that assumes both internal and external threats to the particular materials, including their constituent chemicals. So all of that is not only watched, anticipated for, and planned for within the security plan and I'll leave that to Matt, but that's also an element of daily reporting and regular inventory and stuff that's going to be required as well for external contracts. [45:17] Board Member (likely Jeff Brooks): And again just for just for simplicity's sake and I just want to reiterate it so people really understand it, your RDX product is an explosive material but it will not explode without a secondary or primary rather explosion to ignite it, is that correct? [45:38] David Sazansky (ATP/General Biological): Generally, yes. It is considered a secondary explosive and in actual use cases you do need a detonator of some sort. It's not impossible that like, you know, in weird circumstances, arc flash, stuff like that. Sure. [45:56] Board Member (likely Jeff Brooks): But yes. Well, bullets are designed only to be fired in one way, but sometimes they go off if you drop them. So of course there's ways that [46:04] David Sazansky (ATP/General Biological): things can happen. Well, in the bullets case, you have, you know, your propellant and then you have the actual primer. So the RDX would be the propellant in that case. [46:14] Board Member (likely Jeff Brooks): I just wanted to clarify that, you know, people aren't thinking that this is an unstable explosive material that if not, you know, carried from one place to another correctly is gonna accidentally blow up. That's not the case. Correct. [46:30] Leonard (Jensen Hughes): I'm gonna comment on that too if you guys don't mind. RDX, and there's about 60, 70 years or so of research that kind of go behind the way RDX behaves, just as a compound, just as a chemical. RDX tends to be one of those energetic materials that is extremely non-sensitive to external stimuli, and what I mean to that is that it typically isn't static sensitive, it typically isn't sensitive to, it can actually endure quite a bit of thermal influence, in other words a fire would have to be an extremely hot fire for example to get this material to do anything. That's why it needs inspiration if you will in the way that it's put into weapons, it has to have something act upon it fairly violently in order for RDX to react or what we call decompose, which is just a fancy word of saying explode. The additional thing and you'd ask the question about bombs earlier, and obviously no bombs here, we're not assessing it for bombs, they aren't making bombs, it's not what they're doing. Another thing about RDX and this really goes for any base compound energetic materials that you might think of, if you don't confine them, in other words if you don't put them inside of a smaller container or if you don't keep them as they boil or something like that inside of something, there's relatively little to no opportunity for them to actually detonate because there's just not enough there to eat if that makes sense. You don't put wood on a fire, it kind of actually works the same way with energetic materials. And with isn't within this operation there aren't points of consignment of this particular material either, and it's not being exposed to high heat or anything crazy like that. It's also really stable [48:12] Chair (likely Rick Raines or George Clausen): at low temperatures. Thank you. Thank you. Any other questions or comments from the board? I have one security question. I'm just curious, you mentioned that you would have two live security guards on-site during the day, is that right? That's correct. But it's not door not in the evening, is that correct? That's [48:32] David Sazansky (ATP/General Biological): right and the intention there is visitor check-in an escort delivery drivers checking them if any operations are happening at the test bed into the pad to be able to make sure that nobody is wandering over there and there are two because you know two is one and one is none so you got it someone you got to go [48:51] Board Member (likely Jeff Brooks): to Maggie sometimes, so buddy system. That's right. All [48:57] Chair (likely Rick Raines or George Clausen): right i guess i mean should i take the temperature of the board to see if they're i mean i don't hear any questions from my board that are unanswered that we need to that haven't been answered that we need to go get more expert evaluation on so i'm comfortable making a decision and voting on this but i want to make sure that everybody else is i am comfortable what are we voting on the approval of the well the conditions the findings of fact and approval and what about the third party review that you voted [49:30] Board Member (likely Jeff Brooks): on, are we going to rescind that? Yes, so we have to vote on that first. Yes, yep. Are you good, Jeff? Yeah. [49:40] Chair (likely Rick Raines or George Clausen): Daniel, good, you're okay with that? I'm good, okay. So the first order of business is to rescind the requirement for a third party review because we could not get a third party review, but it has been thoroughly reviewed, so I will make a motion to rescind. All right, of motion in a second, all in favor, all right. And then I'm looking for a motion to approve the findings of fact, everything, we don't have any amendments to the findings that I'm hearing, nope, all right, I have a motion, I'm looking for a second, all right, I have a motion and a second, all in favor. I would recommend reading through the condition, I was going to, yeah, sorry, as verbose as they are. I don't have to, we don't have to vote on each one, do we? No, unless there's an objection or a proposal, just findings, so we need to do, we need to do conclusions, but we need to vote on the conclusions. There were no waivers granted, so that's good. So I'm going to read through the conditions, and then we'll vote to, we'll vote. And if there's any amendments that need to happen, it'll be during that motion. Does that sound good? So the conditions are as follows. Prior to the issuance of a building permit, the applicant shall fund an independent fire protection engineer selected by the town to review the final explosives safety analysis, construction drawings, and chemical inventory, and to perform on-site inspections as deemed necessary by the reviewer during construction and prior to operation. Condition 2. Prior to operation, the applicant shall submit a groundwater monitoring plan establishing test wells, baseline sampling, and periodic third-party analytical testing. The plan shall be reviewed by the town's third-party reviewer at the applicant's expense, and no operations shall begin until the plan is approved,. Sampling shall occur quarterly for the first year of operation and at least twice a year thereafter. Sampling results shall be retained and provided to the code enforcement officer upon request. Third condition, this approval is limited to the operation as presented with explosive storage not to exceed 1,000 pounds net explosive weight and test pad synthesis and closure operations not to exceed 10 pounds net explosive weight per event. No intentional detonation, destructive testing, or open burning of explosive material shall occur on site. Any increase in quantity or expansion beyond the previously disturbed footprint shall require amended site plan review. Condition 4. One rapid entry Knox Box system shall be purchased and installed. Condition 5. The storage magazine and test pad barricade shall be constructed in accordance with applicable federal and state explosives safety requirements and are subject to inspection as applicable and approved by the Bureau of Alcohol, Tobacco, Firearms, and Explosives and the Maine Office of State Fire Marshal. The applicant shall provide the code enforcement officer with confirmation of that inspection and approval prior to operation. Condition 6. Prior to operation, the applicant shall file with the code enforcement officer and the Berwick Fire Department the final chemical inventory and quantities, a written spill response plan addressing detection, containment, cleanup, license disposal and notification, and documentation of hazardous waste disposal arrangements. Condition seven. Prior to bringing any chemical on site, the chemical storage lockers shall be installed on an impervious concrete pad designed and certified by a licensed professional engineer. The sealed liquid tight sump integral to each locker shall serve as the primary spill containment. Stamped drawings and copies of inspection reports shall be provided to the code enforcement officer. Condition eight. Prior to operation, the applicant shall confirm with the fire chief the on-site fire water supply, pump access and emergency response provisions. Condition 9. The test pad shall be constructed with an impervious surface and perimeter containment as proposed so that wash down water, spills, and residuals are contained rather than discharged to the ground. Condition 10. General liability and pollution liability insurance shall be bound before operations begin and maintained for the life of the use. A certificate of insurance shall be provided to the code enforcement officer upon request within five business days. Final condition prior to operation, the applicant shall execute a hazmat emergency response retainer agreement and provide a copy of the site specific hazmat emergency response program to the code enforcement officer and to the Berwick Fire Department. The retainer shall be maintained for the life of the use and annual compliance inspection reports shall be retained and provided to the code enforcement officer upon request within five business days. I'm looking for a motion to approve the conditions as written. So move. All right, I have a motion. Do I have a second? All right, I have a motion in the second. Any further discussion or amendments that anybody? I have some grammatical corrections please in [56:10] Board Member (likely Terry Wilson): condition one, the comma following chemical inventory is inappropriate in that sentence, strike the comma. Yep, and then in condition six, the and between license disposal and notification on [56:33] Chair (likely Rick Raines or George Clausen): line three. Oh, yeah. It was repetitive. Yeah, I thought it was repetitive also as I was reading it. [56:39] Board Member (likely Terry Wilson): And causes lacking in clarity. [56:43] Board Member (likely Jeff Brooks): And then I just have a comment, which is there's a lot of conditions here, and it sounds like there's a lot for Terry to follow up on before they start cutting the ribbon on production. And that's something that you are absolutely qualified and prepared to do, correct? [57:04] Chair (likely Rick Raines or George Clausen): It is part of my job, so yes, absolutely. Great. [57:08] Board Member (likely Niles Shore): Awesome. Last one I just want to add. We are, Terry's one person, so part of the conditions and part of the procedure here, we are leaning upon the federal agencies. That's why there are conditions where Terry is permitting these test pads, but she's not going to be responsible for knowing the ins and outs of the test pad or the magazines. That's why we are going to require the federal agencies or the agencies that are in charge of overseeing it to provide us with a certification. And that's also the importance of having the engineer third-party review as well as some SOR third-party reviews as well. [57:56] Chair (likely Rick Raines or George Clausen): Third-party reviews and inspections? [58:00] Board Member (likely Niles Shore): Excellent. Can I ask a question? Do you understand all 11 conditions? Yes. [58:07] Board Member (likely Jeff Brooks): And you're comfortable that you'll be able to comply? [58:10] David Sazansky (ATP/General Biological): Many of them were, it's good to spell them out explicitly but were things we needed to do anyway. I just wanted to clarify just so we all are on the same page that operations in this case can be defined as when chemicals are on the site just [58:24] Board Member (likely Jeff Brooks): to just does that work are you referring [58:26] David Sazansky (ATP/General Biological): To a specific just because everything says prior to operation so I want to make sure that so for stuff like permitting building the pads running right yeah that's not considered permitting [58:35] Chair (likely Rick Raines or George Clausen): And all that the building part of would not be operations it would be yeah when chemicals are [58:39] Board Member (likely Jeff Brooks): On site makes sense yeah all your infrastructure will be taken care of and then you just like all right bring in the stuff good stuff yeah that works does that work for you Terry right yeah I [58:49] Chair (likely Rick Raines or George Clausen): Mean you're talking about the pads being poured yeah fencing being up yeah right or even just like [58:54] David Sazansky (ATP/General Biological): Setting up you know benches and tools and that sort of thing in the buildings that's okay is [59:00] Board Member (likely Niles Shore): The fencing going to be one of the first things that go fencing is going to be one of the first [59:04] David Sazansky (ATP/General Biological): Thing that gets ordered lead time on that is frustrating but yes that's special fencing special fencing it's a lot it's like a half a mile of it too so don't be happy [59:20] Chair (likely Rick Raines or George Clausen): Okay so I have a motion in a second we have some amendments anybody else have any questions or amendments nope so all in favor of the accepting the conditions as amended all right so I will so then I am looking for a motion to approve the conditional use I will make a motion [59:40] Board Member (likely Jeff Brooks): To approve the conditional use second all right I have a motion and a second [59:47] Chair (likely Rick Raines or George Clausen): Any further discussion on this all right all in favor all right oh wow let's get right down to business shall we just keep them away from the microphones because the approved [1:00:03] Neil Reposa (Civil Consultants New England): Findings of facts the individual items will have to go back to the findings of fact okay [1:00:13] Chair (likely Rick Raines or George Clausen): From the findings of fact did I read [1:00:22] David Sazansky (ATP/General Biological): Somewhere that there are code enforcement officer office hours yes she's like don't that would be useful like just to plan out what sequence what you [1:00:32] Chair (likely Rick Raines or George Clausen): Want to see for everything well you can you can yeah they are on the time website so my walk-in hours are from 8 to 11 but you can submit stuff to me [1:00:45] Board Member (likely Niles Shore): Outside of Okay. Perfect. [1:00:48] David Sazansky (ATP/General Biological): I just want to, you know, sit down and whiteboard out everything. [1:00:53] Chair (likely Rick Raines or George Clausen): Oh, I only sign Twice. And then I do on the afternoons my first day, but yeah, that's... [1:00:59] David Sazansky (ATP/General Biological): 8 to 11 every day? I'm trying. [1:01:04] Chair (likely Rick Raines or George Clausen): I heard you have some help though now. Yes. Yes, and she's going to be the enforcer of the walk-in Hours. Oh, good. Hope she's not listening. I can't imagine anybody's watching this for funsies [1:01:22] Board Member (likely Niles Shore): I was going to leave you one copy Okay, sounds good [1:01:30] Board Member (likely Terry Wilson): Oh yeah, thank you The engineers are asleep [1:01:34] David Sazansky (ATP/General Biological): Really appreciate calling in Yeah, thank you [1:01:37] Chair (likely Rick Raines or George Clausen): That was very, helpful and I'm glad we have it on record too. That was good. You're dismissed missed thank you thank you thank you thank you everyone thanks and good luck. We'll just take a brief moment while the rest of the board signs the plans before we move on yes. [1:02:31] Board Member (likely Jeff Brooks): Sir last [1:02:34] Board Member (likely Terry Wilson): guy to sign dates it right. [1:02:35] Board Member (likely Jeff Brooks): Yeah I will say [1:02:49] Chair (likely Rick Raines or George Clausen): while we're taking this moment that we do have an opening on the planning board so if this looks like something that you would be into you don't mind a little public ridicule every once in a while like reading technical papers we've got an opening and it'll be for an alternate position right James that's correct yeah so it gives you a little bit of a buffer time to [1:03:12] Board Member (likely Niles Shore): learn the ropes don't listen I throw you right in there'll be a couple weeks to apply so yeah.
New Business
[1:03:21] Chair (likely Rick Raines or George Clausen): A couple weeks to apply it's an appointed position you don't have to you don't have to gather signatures or run for anything but there is a an attendance requirement and that tends to be what gets people we need we need people that can really commit to physically being here at the meetings and contributing all right thank you guys so moving on we have no new business we have no public comment but we're going to have some who's scott his [Board Member (likely Jeff Brooks): iphone's here is] that scott i don't know it just says scott's iphone oh maybe so we're going to move on to some informational items one was the planning board opening but i think we want to talk about third-party reviews so let's talk [1:04:16] Board Member (likely Niles Shore): about it so from i guess where i stand on third-party reviews for subdivisions as part of the ordinance we take in review escrow so i thought procedurally i'm trying to commission those to align specific timeline horizons so if the board prefers to want to authorize that before [1:04:42] Chair (likely Rick Raines or George Clausen): i do that then just that's just i'll just do that okay so in other words you were just saying it's It's something that they pay for regardless, so you're just automatically requesting that to save time for the applicant so that it couldn't possibly take a couple weeks off of their application process. Right. [1:05:03] Board Member (likely Niles Shore): And generally, when I'm asking for a third-party review, I try to pin it to things that I'm not super comfortable with. So if it's something like I do a cursory overview, but I say, here's the things that I'm not super familiar with, to focus on those and then obviously things I might miss in general like what like what give us an example of something that you would start I mean like in terms of stormwater flows and calculations I mean they're pretty sometimes straightforward but if something's if something's missing or like there was one where I was like one example I was reviewing a subdivision and I notice There is extra flow going off the site and there's a certain number of the flow that's going off and then I do some research and it seems like a significant number. But if I'm going to bring that up to the board, I want to be sure. Like I don't want to bring something up and then lead you guys down a different path. So it's just good to have an engineer's perspective to say, yeah, that is a problem or no. So that's just one example. There's, like, road construction. There's all kinds of examples of, like... [1:06:17] Chair (likely Rick Raines or George Clausen): Crossing wetlands or whatever. Yeah. Yeah. Okay. Things outside our expertise. [1:06:23] Board Member (likely Niles Shore): But I don't know. You tell me. So we have sketch plan. We have no money collected at sketch plan. We go on the sidewalk. They come back. They produce a preliminary plan. It's just one of those things procedurally. I've waited a little longer to generally around the time they come to the board for preliminary plan that's when it kind of triggers in my mind, oh there should be a third party review because in my mind, just like the last one for Northland I'm thinking, I want us to have a third party review done by the public hearing [1:06:58] Chair (likely Rick Raines or George Clausen): Right, so that when the public comes with questions we have the answer [1:07:02] Board Member (likely Niles Shore): But instead of me making that call, if you prefer a preliminary plan and procedurally you can say we want to maybe I can say here are the things I'm not super familiar with does the board want to do a third-party review and whatever and then you can say yes we want a cursory review on everything but focus on yeah but it's also possible or likely even not every project needs a third-party review in terms of a major I would from this is specifically we're talking like subdivision major subdivision okay yeah but do you foresee any and some miners [1:07:37] Chair (likely Rick Raines or George Clausen): minor too but do you foresee any subdivisions that might come before the board that would not [1:07:42] Board Member (likely Niles Shore): need that third party i can't think of anything but the you're thinking that the amount that we collect is proportional to the size of the subdivision so we collect on a per lot of per [1:07:52] Board Member (likely Jeff Brooks): dwelling unit basis okay so and what yeah george was so the amount you collect that pays [1:08:00] Board Member (likely Niles Shore): for the third party review that's correct okay we collected that but i don't mind i don't i think procedurally it probably could still work that i'll think about i think we could work it into it that way you're you're formally signing off on a third-party review and then it could be maybe even more pointed after you're after the it would be at application completeness so we just make it [1:08:25] Board Member (likely Jeff Brooks): part of the part of the procedure at all yeah see that's why I'd be bringing it [1:08:31] Board Member (likely Terry Wilson): up a while because there's actually no policy for Berwick on how the third party reviews are handled there's ordinances that specifically say the board has to approve all third party reviews the ordinance is also state that the cost for the third party review has to be given to the applicant when they have to agree okay we'll buy this course you can't just say it might be a certain amount so I think if we can tighten this all up with a policy and it [1:09:01] Board Member (likely Jeff Brooks): doesn't even have to be very complicated yeah it's yeah so I mean if you if we [1:09:06] Chair (likely Rick Raines or George Clausen): identify it's just the only issue I have is delaying the application if we're waiting if application completeness you say hey listen you know we need whatever a stormwater survey whatever for a third party review and then we go and get a price for that to come back at the next meeting we've already delayed them two weeks or maybe four weeks that's all so it's just adding it's it's adding time to [1:09:36] Board Member (likely Jeff Brooks): their application i understand but i mean when we're trying to like the other night when we [1:09:42] Board Member (likely Terry Wilson): had this discussion about the town ordinance and the planning boards policy that didn't line up and what was said at the end that the ordinance is law and that has to be abided by so are we 're going to just sweep this under the rug now for this. [1:09:55] Chair (likely Rick Raines or George Clausen): Well, I think we do give, I mean, we do give them a price at some point. It's just that when we're sitting here, we don't say it's $10,000. [1:10:01] Board Member (likely Terry Wilson): No, I'm not disputing that. No, I'm not trying to nitpick here. I'm just saying, why don't we just get a clear policy? We can all discuss it and say, you know, this is fair. This works in the name of efficiency. We're going to allow this and this. I'm totally cool with that. I just think we need a policy. And then we can avoid all these other little snafus going down the road. As long as it aligns with the ordinance exactly and that's why it's gonna we can't just do it in this meeting we will have to yeah it'll take several meetings and then we can have the lawyers check it out and say okay good and then we can make a motion and vote on it yeah that [1:10:37] Chair (likely Rick Raines or George Clausen): sounds good yeah because the ordinance isn't changing before next June yeah we want to change the word notes just a policy within our procedures right oh James doesn't look at his face oh no I [1:10:49] Board Member (likely Niles Shore): I have a completely unrelated thing to talk about. That's all. [1:10:53] Board Member (likely Terry Wilson): Oh, good. I can't watch. I wasn't talking about changing the ordinance. [1:10:56] Chair (likely Rick Raines or George Clausen): I was saying to comply to the policy that aligns. [1:11:00] Board Member (likely Terry Wilson): No, but I mean, if we're actually sitting here and discussing that, it's okay for the staff to order third-party reviews. And that is not, that is totally against what the ordinance says. [1:11:11] Chair (likely Rick Raines or George Clausen): That's illegal. Right. Then we would need to change the ordinance. [1:11:14] Board Member (likely Terry Wilson): No. In that case, we have to comply to the ordinance. Right. [1:11:18] Chair (likely Rick Raines or George Clausen): Are we 're gonna comply? Yes. Yes. Yeah, because we can't change it before next June, right? So I wouldn't change that anyway, or I wouldn't want to change that Yeah, so we'll work on that do you want to come up with a I already did you did can you put it on the agenda? [1:11:36] Board Member (likely Jeff Brooks): For us, please. Yeah on a future meeting. Can you put it on the agenda? Yeah. Yeah, fantastic [1:11:41] Chair (likely Rick Raines or George Clausen): Can you send it out in an email so that we can review so that we can do it probably tomorrow [1:11:45] Board Member (likely Terry Wilson): Awesome got a busy day, but otherwise it'll be by Monday. Just ping me if I forget great. I have it. All right, cool [1:11:54] Chair (likely Rick Raines or George Clausen): What else do you have? Oh? for [1:11:59] Board Member (likely Niles Shore): We have our ordinance project all right Phil from Bernstein Shore has gone through the ordinance I've gone through some of the comments and stuff so like there's probably 15 or 20 changes to comply with some of the new laws and there's some just smaller decision points so at some point I'll bring that to the board that we can discuss. We're ramping up already to ordinance amendment season and we have to be done by January-ish to hold a public [1:12:28] Chair (likely Rick Raines or George Clausen): hearing. Which is crazy because we have such a heavy schedule and ordinances are important. [1:12:34] Board Member (likely Niles Shore): So I'll have to sneak that in at some point. [1:12:37] Chair (likely Rick Raines or George Clausen): We'll have to grab a light meeting and make it a combo. Do we have a light meeting coming up? We have a heavy meeting and then it's like Thanksgiving and then it's Christmas and then it's January and then like we're not gonna want to put an [1:12:51] Board Member (likely Terry Wilson): extra meeting in December that never works out what are you talking about [1:12:54] Board Member (likely Niles Shore): George does remember by policy we don't meet on the third week in December and [1:13:04] Chair (likely Rick Raines or George Clausen): the first week in January right first week of July 4th yeah but we can always add matings this one exactly slow down certainly setting that precedent [1:13:20] Board Member (likely Niles Shore): I did receive the preliminary plan for Hansen Road so you'll see that coming. I don't know that one. I can't think of any other projects that are like in the queue so okay. Oh yeah and I received I received the application for the gas station. I heard you yeah and they actually they reduced [1:13:43] Chair (likely Rick Raines or George Clausen): the building to 3 000 square feet. That was the best decision they could have made. Wow where's that Blackberry Hill Road at the end at Route Four and Blackberry Hill not far from where these [1:13:55] Board Member (likely Niles Shore): guys are doing there. When do you think that will be before the next meeting? I think [1:14:01] Chair (likely Rick Raines or George Clausen): November 5th. Oh excuse me November like Thursday November is very November 19th November 19th I'm sorry November 19th. No one can miss a November meeting. You heard a lot of things happening in [1:14:19] Board Member (likely Niles Shore): November yeah because the next meeting is Two Sisters and there's Berg Woodlands for [1:14:24] Board Member (likely Jeff Brooks): application completeness. Oh okay yeah that's good that's the Megan's. Did we get the invoice for the [1:14:29] Board Member (likely Niles Shore): third party review for Two Sisters? We did it's so it's still ongoing but the one invoice we received was for five thousand dollars. Okay so it's a lot less than yeah it's still it's still ongoing so there will be but I think the substance substantive review was a five thousand dollars so now there's a response to the response now the response is there's responses. Oh is that all contained together and yeah it's a good question so far I provided you have that's the response that's That's the applicant's response to the third-party review. Everything else is provided in the digital packet. If you want more, let me know. I thought maybe the more material may end up being confusing because things are being referenced to the previous documents. So let me know if you want the other things printed out. [1:15:23] Chair (likely Rick Raines or George Clausen): Are all the Two Sisters things online for the public? [1:15:27] Board Member (likely Niles Shore): They're on the packet, yep. Everything is in the packet. I'm thinking you're going to cut down my hunting time. [1:15:34] Chair (likely Rick Raines or George Clausen): There's always Sunday, Jeff. Anybody have anything else? Any other information? Alright, I move we adjourn. Second. All in favor? [1:15:44] Board Member (likely Niles Shore): Aye.