Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[6:43] Speaker A (unidentified): Limerick, she lived on Lake Arrowhead. She had beavers coming up and taking down trees on her property. SRC TV made her replace them, or not SRC, Saco River Corridor made her replace those trees.
[6:58] Speaker B (unidentified): Really? That was an act of nature. Mm-hmm. Good
[7:07] Selectman (Chair): evening, welcome to the Limerick Selectmen's meeting. We are holding a public hearing tonight for CIA salvage renewal of a recycler's license. At this point in time, I'm going to ask Stan to come up and tell us what his findings are.
[7:45] Stan Hackett: Stan Hackett, Code Enforcement. Before we get started with the public hearing, I'd like to do the conflict of interest resolution. So what that is, if there's anybody that's on the board that's a voting member, which you all are at this point, that have any conflicts whether it's personal interest or if you've been contacted outside of a public meeting by anyone regarding the public hearing or the status of this meeting if anybody has just disclose it and then what you'll do is say I can continue to either be unbiased to make a good decision or you feel that you need to recuse so has there been any communications outside of a public meeting regarding 366 sokokis avenue and this recycler's license do any of you feel that you're personally unable to make a an unbiased opinion so as a board, you feel comfortable. So that being said, and the reason why we do this, because if there was and there was ever a question of it, then that could be an avenue of overturning whatever decision the board makes. What I want to do now is I want to summarize what the information that you have in front of you, Sean, I sent you emails of all of this stuff today as well. well. So what you have in front of you is a notice of decision. You have the summary of the public hearing and the recycler's license that's unsigned in case what your decision is today. DEP's report from the November 4th site walk. My summary which supports DEP's summary but a little bit more on the local level the plan dated 11 to 2026 which should be your map number one still waters plan for the hazardous waste contingency that's part of the sweat plan that he has and what that map does which is should be number two that labels all of the hazardous materials or liquid fluid storages and areas of storages and the amount of the maximum amount of storage that those containers can hold then you have a site plan which is Dating back to 2009, this was pre before the sweat plan and the retention ponds were required, so it gives you a little bit of a history from 2009 to current. Reviewing the conditions in there, you have the notice of decision, and in this part of tonight's meeting, which is starts on page three of the notice of decision, you will see the conditions of approval. That is what you were going to be basically looking at tonight and forming your decision after you've talked and heard from Sean Gerrard and others of the public, if you so choose. Again, I just said that you need to hear from the applicant in any other testimony that's regarding this subject tonight. You do have the right to put time limits on any rebuttals once the board has heard from the applicant and testimonies from anybody else. THE BOARD WILL NEED TO MAKE A DECISION, WHETHER IT'S A DECISION THAT YOU'RE GOING TO EXTEND THE TEMPORARY RECYCLER'S LICENSE, YOU'RE GOING TO ISSUE A RECYCLER'S LICENSE WITH CONDITIONS, YOU'RE GOING TO OUTRIGHT ISSUE A RECYCLER'S LICENSE, OR YOU FEEL IT'S NECESSARY TO DENY, and I'll explain this in a second for the denial. Then you need to reference, and when we do the final decision, whatever it may be, I will reference where it references either an ordinance or a previous conditional use of approval or a stipulation of the temporary approval that was given in June. If you do if you If you decide to deny, the applicant has a right to an appeal. Our zoning ordinance and statute doesn't allow for the Zoning Board of Appeals to partake in this because it is a select board's decision. So the appeal can be several different ways. The applicant can ask for reconsideration and a new public care. At that point, certain information can be reintroduced, but only by the applicant if it will change or give validity to the applicant or change the mind of the board. The other option is it would have to go to a judicial review, which is Superior Court. Those are the only avenues of recourse there. there. But when you make your decisions, whatever it may be, I will ask each and every one of you to do it solely independently. You need to be satisfied, as I have told you before, whenever you issue a permit or a conditional use or a license by statute under your review you authority you're saying that they're in compliance now compliance with conditions are okay but if you issue it without conditions and they're not compliant you are speaking on behalf of the whole town and accepting liability of any issues that may occur whether they do or not is another subject but if you're saying that they're completely in compliance you are agreeing that there is no issues at hand that potentially could bite the town all right so that being said I am going to turn it over to the board and again you can reference page three which is the conditions of approval those are the things the main criteria was the plot plan which there is a revised one I received tonight it is not wholly completed but he has made some revisions again to try and accommodate some of the requirements of that if you have questions you can ask Sean again and Sean should be able to speak after anyone else but again with a time constraint but and I'm here to answer any other questions you have as well anything else before you get started I
[15:25] Sean Gerard: think a lot of this is a little ridiculous. Again, Sean Gerard, CIA Salvage. I was asked to give you a site map. That's what I gave you. Waited this afternoon. I was told I have to have measurements from here to there. Stan actually did a good job on getting some of the stuff that Oak had. Had so it shows the 100 year 100 year footprint it shows what my tank bombs are where my concrete pads are situated the hundred year 100 foot from the flood is here this heavy black mark but this is supposed to be a simple when I gave this when this piece of paper here from Oak was done in April of 2008 it didn't give accurate measurements on this end of the yard and that's what I thought we were having this site map done I didn't realize we were going into a site map that's you know designed For nuclear waste sites and all of that I disagree with Stan's facts of saying that if something happens at my facility that this board of this town is responsible because you're not the first person they come after is me and they come after my assets so it's not anybody's job here as we know when there's other sites in town they haven't gone after anybody there they go after the owner of the property I just received Stan's paperwork for the select board it would have been nice to have that a little earlier I had a chat with Stan about last week's meeting when he said that you know the site map wasn't completed I asked what he wanted I didn't get any answers for that until just recently today pretty much So we scribbled some stuff in on one of the site maps that a stand has if there's something you want You got to come out and spit it out We can't come into the board and say well I don't really have everything I want and then when Sean goes in Sean can't get the answers he wants Because Stan doesn't know what?
[17:25] Selectman (Chair): Everybody wants. Excuse me, Sean, which late information did you get from Stan?
[17:32] Sean Gerard: I didn't get the notice of decision what we're gonna be going through until just now, and this young lady handed it to me.
[17:38] Selectman (Chair): Because I don't see that.
[17:42] Sean Gerard: I mean, there's a whole array of stuff here that we're going through. That you asked me for a simple site plan into conditional use. You asked me for a site plan. This is going into, I see storage on here in for the facility, the public testimony raising concerns about tire storage screen and visibility. I do all of this with the plan with the planning board. I don't usually do it with the select, whether it's like board. I come in, I give them my recyclers license for the last 35 years, you've signed off on it, and away I go. Now all of a sudden I gotta have special site maps, I gotta get measurement sites. Nobody else in town, you got gas stations in town, do they have to go through this and take and say, okay, Sean, you're 26 feet from here, you know, you're 900 feet from here, you're 400 feet from here. I understand some of it can be useful, but this is a little ridiculous. I spent tens of thousands of dollars on these three different sheets you got here. This one shows all the, all the contours over there, and today I was told that we want, we want measurements. Well, these here, these are all the scale, they should be able to be measured. This one here was just done by Mike with on. That's got all the buildings on it. Next one shows you where the gas and everything is stored, all of that stuff, and this one, this one's all done scale. How much, I mean, what are we, industrial facility here? You know, we're trying to, and then the notice of decision, you know, going through that, we're gonna have the findings of fact. I got this here just 10 minutes ago. I haven't had a chance to sit down and answer it. You know, the conditions of approval, I say, I was asked to give you a simple site plan. That was what I was asked, that's what I gave you. I didn't realize we were going into depth this far, and I don't know where either the stand, and get along with Stan, don't get me wrong. Some days he's an asshole, some days he's not. But I don't know where he's fishing to get all of this. And I mean, there's stuff in here that is ridiculous. Required site plan contents, minimum at a property, boundaries, operation areas, vehicle storage, dismantle and shear and prep, tire storage, barriers. We're gonna go through all of this? I go through all of this with the planning board. This isn't this board's job, I don't believe. You guys can take whatever job you want. I'm here for a recycler's license. That's all, I'm not here to redo my whole conditional use permit, I'm gonna do that with the retires down the street in six months. But I don't think I'm here to redo my whole conditional use permit with this board.
[20:26] Selectman (Chair): Based on what you just said, that you just got that information this afternoon, would you?
[20:32] Sean Gerard: The planning board don't ask for this stuff, or they haven't, it's up today.
[20:35] Selectman (Chair): Wait a minute, would you prefer to have some time to look this over?
[20:49] Sean Gerard: Well, I just don't understand where we're going. I'm here for a simple recycling license. It allows me to sell parts, not go through a whole spiel of everything that Stan's got in this book.
[21:00] Selectman (Chair): All we can do is look at those conditions of approval, whether they've been met or not.
[21:04] Sean Gerard: Well, what was your condition? When you granted me an extension, you asked me to get what? Do we have those minutes?
[21:12] Speaker A (unidentified): Minutes. These are from that last hearing, correct? And what does it say? Well, it said
[21:20] Speaker F (unidentified): that it was the date of approval that we signed it on June 23rd, 2020. Yeah, you wanted a site map. And required site plan contacts. There's a whole bunch. You didn't get a copy of this? Well, I mean, it's all right here in black and white, everything we wanted. I
[21:43] Sean Gerard: don't believe I had that.
[21:46] Stan Hackett: You should have it. It was hand-delivered by CZU.
[21:53] Sean Gerard: Can we go through that and see what it says I
[21:59] Speaker A (unidentified): mean it's exactly what you're looking at now is the same thing as this that was from June 23rd. All right, this is what was requested of you.
[22:07] Sean Gerard: So if we deny the permit today, I have to go to court, I have to go superior court. I don't believe that, I don't believe it's right. I think what we're trying to maybe get to, I've never done this in 35 years that I've been here, guys. So we got a new code enforcement officer, we're going to change. I'm here for a simple recycling license that allows me to sell used auto parts.
[22:42] Speaker F (unidentified): It has nothing to do with the code enforcement officer.
[22:45] Sean Gerard: I understand, well obviously it does
[22:47] Speaker F (unidentified): because we've got everything in there. You signed this on June 23rd, you got the copy of it, we all voted on it and you signed it and there was all the conditions in there and it was given to you, it had to be done in 90 days and if you didn't read it.
[23:05] Selectman (Chair): trouble getting a survey to come in and do what he had to do well it says right on here that
[23:10] Speaker F (unidentified): everything has to be marked the
[23:16] Stan Hackett: answer is Sean's concern is you didn't get a, you didn't get a copy of the notice of decision that was signed after the load sign, okay, the email and the delivery, but also with the recycler's license is stuff that the board covered on June 23rd. Those are of the criteria is you've already been through those, Sean. So that was added to the findings of fact and the conclusion and the conditions of approval. All right, the biggest thing that was missing at the time was a plot plan, which is defined under state statute. So what the board is doing, when it renews your recycling license, or any other license that comes up, there's one that's due every five years, one is due annually, the board has to verify that you're in compliance or whether it's the plan was conditional use which if you remember in 2025 the board said it wasn't for communication with the planning board they didn't have specific information all right so now they do have the information they will be provided at once you go to another review which is separate in the planning board but they have to ensure when they renew your recycling license by statute that you're in compliance or they've set regulations to ensure that you'll be in compliance all right so if I know you haven't had anybody bring this up but if the town fails and it isn't that they don't go after you. But if you got hit by a Mack truck, the town is the one that is liable for holding the Mack, okay? And the town is...
[25:02] Sean Gerard: We have several sites in town standing, nobody's holding the bag for them.
[25:05] Stan Hackett: But unfortunately, Sean, when accountability can't be held accountable, the town holds the bag, right? And they've learned that from past history, where they've inherited other things, regardless of whom, when it was done, the town learned that it is liable for the other contamination and any results of cleanup. So this is why the town needs to do its due diligence. It doesn't mean that they can't work with you and make accommodations or conditions, but you've got to be held consistently, and the board needs to ensure that's all.
[25:43] Sean Gerard: Consistent? This town hasn't been consistent in 35 years, Sam.
[25:46] Stan Hackett: Well, I can't answer toward the past, Sam. I am certified and trained and my responsibility to the board in this town is to do my job. And that is what I'm doing. And I try to communicate that with you. And as you brought up today, I was willing to say that after a week that I miscommunicated on the park plan and I was going to tell the board that was my fault. But then, because of all the questions raised today and your visit today, I revisited the notice of decision, and in that notice of decision, it clearly defines what is required. So this is why, again, I've been very insistent on I want to talk to you, I want to work with you, I want to get this result, okay? I don't want you to come to these meetings with no answers at all. I help both sides. Okay. And the goal is not to shut you down. I mean, the goal is to make you as compliant as possible.
[26:53] Sean Gerard: It's just a shock that I'm coming in and we're going through all of this. You know, notice of decision, findings of facts, and everything else down through.
[27:03] Speaker A (unidentified): My question is, I mean, and it's a pretty basic one because it was agreed to. Has the concrete pad been replaced or repaired? No.
[27:15] Sean Gerard: DEP has allowed us. There is a concrete pad there. DEP has allowed us to go to June. because we couldn't get any so qualified contractors to put the bag down you
[27:27] Selectman (Chair): couldn't get that done in 90 days well in 60 because we heard this in anything
[27:36] Sean Gerard: removed that doesn't need shouldn't be there it would be contaminated if there was contamination then you have to they have to come in they sniff test it and they do that and that's like three week process Phil Rock was scheduled to do it but with everybody being sick and covet and all of that we couldn't get them to come in so dep has given us an extension to the end of june i mean but this has been a six month with
[28:00] Speaker A (unidentified): with us and it's yes i'm going to get it done yes i'm going to get it done yes i'm going to
[28:04] Sean Gerard: Get it done now. We're looking at another six months. If you can't find a contractor that's qualified to do it, I can't just, I can get down there tomorrow and pull concrete for you. It's
[28:17] Selectman (Chair): is supposed to be done, Sean. We can't control your contractors. You're the one that's in the driver's seat on that one.
[28:25] Sean Gerard: You just deny it, we'll go to court.
[28:27] Selectman (Chair): No, we're not looking for that, okay? I think that's where we're going. But I'll tell you, another issue I see, and I saw it just a minute, Stan put this plan down. It's not accurate. What's not accurate? Your pawns, you just.
[28:43] Sean Gerard: Well, if you look at this one, Howard, I didn't know you needed that till three o'clock today when Stan, but you look at this one. This one's accurate, right down to the pinpoint. This one here's accurate of everything that might be on there. And then this one here fills in where the ponds are and everything else. That's all been done by OAK.
[29:02] Selectman (Chair): But why isn't it on this master plan?
[29:04] Sean Gerard: Because we didn't know we had to do it. I asked Stan that last week and Stan says- I got news for you.
[29:11] Selectman (Chair): It says required site plan. This is on the conditions of the approval.
[29:16] Sean Gerard: Yeah, well obviously I didn't read all of that very well because I didn't.
[29:20] Selectman (Chair): Unfortunately, if you don't have it, we can't approve it.
[29:26] Sean Gerard: You have it right here on this, Howard. You have it on this back here, which is part of the site plan. You have it on this one here.
[29:33] Selectman (Chair): This is your master plan right here.
[29:34] Sean Gerard: That master plan's gonna go to shit in two days. Why? Because obviously we have to send it back to Mike and have all of this stuff put on it. You have to have all of this, which Stan gave you.
[29:47] Selectman (Chair): Why wasn't it put on when he did this?
[29:49] Sean Gerard: Because we didn't know we had to have it. We said we were having a boundary, a site plan. I didn't know you wanted a full, I misunderstood.
[30:02] Stan Hackett: So what I think the board has offered us, they asked you if you needed more time. So within reason, and again, the board can give you an amount of time inside that, but it would be preferable if you would say to the board, I need a little more time because I didn't thoroughly read the notice of decision or again, there was other things going on and Sean does have a very active business with multiple businesses on that property. So I'm not making justification, but if you need more time for an answer, it would be better to ask the board for that time.
[30:42] Sean Gerard: So I guess Dan would like me to ask the board if I could get more time to incorporate everything on there and every measurement, topos and everything that you have on the other three pages into one piece. And now that I know that what you're looking for is these three pages of material, I go through and make sure.
[31:04] Selectman (Chair): It I'm reluctant on that one for one reason, one reason only, and I'll read it. Under conditions of approvals as required site plan contents, the site plan shall identify at a minimum the property boundaries, operational areas, vehicle storage, processing, dismantling, sharing of preparations areas, tire storage areas, hazardous fluid storage areas, used car sales areas, stormwater and retention features, screening, fencing, barriers, and gates, waterways, highway and publicways, residential areas, and known public and private water supplies or wells to the extent reasonably available. This plan does not show that, then how do you expect us to make a ruling on how do
[32:06] Sean Gerard: you expect these other two maps? Okay, but if we look at the old maps, this one says
[32:12] Speaker A (unidentified): you have three pads. Yeah, that's not correct. Exactly, that's kind of the point.
[32:19] Sean Gerard: We need, we need an actual talk with Mike and try to get this straightened out and get all of this on one map. Are
[32:28] Speaker A (unidentified): we willing to extend it 30 days and schedule a new public hearing? But I mean it still doesn't, I mean there's still other conditions that haven't been met which
[32:41] Sean Gerard: What are the conditions that haven't been met?
[32:43] Selectman (Chair): You've got them. I'm sorry? You received them. They're right here writing. I've met every one of them conditions.
[32:51] Speaker A (unidentified): I mean the concrete pad hasn't been done, which is a major one.
[32:55] Sean Gerard: Spring, no matter what we do, I
[32:59] Speaker A (unidentified): mean at what point do we just say just take it down, just take it? What man, just take the concrete pad out because if it's, if there's cracks, if there's things that
[33:12] Sean Gerard: it could be leaking in there's nothing leaking in there's been a pad there i am one of the only two people in the state of maine to put a pad underneath the processing area and it doesn't
[33:23] Speaker A (unidentified): mean that every requirement and it and it's been a requirement for the last six months is my concern. And now we're looking at even if we go with what DEP says and it's another six months by the time June gets here, well you can't get it done beforehand because it's too cold, so now you're going to try to schedule, so we're looking at another six months, so now we're a year and a half out and if it doesn't get done then doing
[33:49] Sean Gerard: Everything we can, man, we've done everything we've, we've got the stuff for Range E Road done. We've got the stuff for this done.
[33:55] Selectman (Chair): Hold it, you can't talk about Range E Road.
[33:58] Sean Gerard: I understand, but you know, getting surveyors and storm water engineers and everybody on board, not everybody's sitting home waiting for Sean Gerard or CIA salvage having tea and crumpets and saying, okay, let me help you do this, Mr. Gerard. You want a concrete pad down there tomorrow? I'll pour concrete tomorrow.
[34:16] Stan Hackett: John, before you just go and throw a concrete pad, explained to them there was another issue as well as it's not all the townsfolk this has been requested this has been at the select woods meeting in 2023 and it was also mentioned in the 2021 plan board okay but the biggest problem lately is everybody's schedule is busy, because of lack of communication, which is not the town's fault, still one of his prior engagements, as well as Mike Malone. So if they cannot meet the time constraints that are required, then we need to be up front and open. And then, preferably, you set the realistic dates, because the Boards do, and we meet that date.
[35:08] Sean Gerard: this is where this stuff is going to start buying so i'd have to make a phone call to mike and find out what mike's schedule is i'm putting this all on one map and the other piece is red still water so which is the pad the water has agreed to the june deadline on chopping up whatever's left of the pad they want cut out and there is a pad there 's three quarters of a pad there now so not all processing has to be on a pad you know we have aluminum piles we have tire piles and not everything has To be on the pad why not because it doesn't have to be the town's dump is not on a pad Howard the town's metal is not on a dump and again the processing is where we do where we cut up the cars once we process it we make piles of material different material you don't have everything on a concrete pad but you have a transfer station as a separate thing and it is
[36:04] Stan Hackett: Okay where the transfer station is because they actually had to dig to prove there was x amount I'm just using it as an example so it's a separate issue yours has been a concrete pad for the metals
[36:19] Sean Gerard: I have not had to have a concrete pad for all the metals. We have an aluminum that's not on the concrete pad. We have number one that's not on a concrete pad. It's the processing pad. It's a pad to process material. You bring the cars over there, you rip up a pie, so if there's anything that happens, it stays on that pad. The
[36:39] Stan Hackett: DEP agreement and the town's agreement, and the reason why the transfer station doesn't have to have a pad underneath the mess because she has sufficient amount of gravel, all right. But yours has always required, or it was proposed, which is the same as making a requirement. If you say you're going to do something, you need to do it, or you need to go back to the boards before the deadlines and make a change in plans, and that has not been done. Again, it's not all your fault. It's a lot of lack of communications and follow up.
[37:20] Sean Gerard: We went from three pads down to one pad, and we got approval for it. Again, there is reference
[37:27] Stan Hackett: in 2008 and 2009 for three pads. I showed you that, all right. The DEP reference in theirs says three pads, but the boards are only asking for one to be replaced, yeah, because of the damages done to that back, all right. So you need still waters in port and you need micro loans back. When we said
[37:52] Sean Gerard: we wanted three pads, we said we'd have one for light iron, one for number one, and one for irony aluminum. But when a customer comes in, they don't have, they don't separate their material. They dump it in one pile and they're done. I
[38:16] Selectman (Chair): read in these, all these notices we got of, there was, I believe, four different ways that we can deal with this for voting, right, and I don't see it on here. That's why I don't know which, I don't know which sheet is on what, information's on which seed here. What do you mean there's four different ways to deal with it? No, as far as how we vote, how we, what we can state that you can do, it's in the one that I
[38:47] Stan Hackett: used for myself from my notes. So it should have been your very first date.
[38:51] Selectman (Chair): Sight walk up summary? Yes. I'll be carrying the CIS
[38:55] Stan Hackett: outage renewal. Can
[39:00] Sean Gerard: I get a copy of that stand? That
[39:05] Selectman (Chair): looks like it.
[39:18] Stan Hackett: So, if it starts at A, B, C, and D, then the board may ask for additional information.
[39:49] Sean Gerard: The other thing is I turned the paperwork in the stand as soon as we got it from Mike was on, and he didn't say, oh no, Sean, this is not acceptable, this isn't even close, because he didn't know what he wanted either. He may have known what he wanted, but he certainly didn't say anything. I've worked with a lot of
[40:09] Selectman (Chair): Engineers, a lot of surveyors, and if you have them go in and say you document everything that's in that piece of property, it's got to be there, whether it's a pond, where it's a tire. I thought
[40:21] Sean Gerard: we were getting a simple boundary survey, show where the boundaries were, because we couldn't, I couldn't tell how far we were on the boundary from the palm where we owned and we didn't own. Mike didn't understand either that when I gave him the paperwork that you wanted every nook, cranny, topo mat under the front. Did you give him the sheet? You say I did, but I don't believe I did.
[40:41] Selectman (Chair): I'm saying if you received this, did you give him that sheet?
[40:46] Sean Gerard: I did not give it to Mike, no. Okay. And I don't believe I got it, Howard. You wouldn't have had it typed up that night that we were here and we talked about everything you gave me in extension in June. You wouldn't have had that sheet then, would you? Or would you have had that sheet that night?
[41:13] Stan Hackett: You did have it the following week
[41:15] Selectman (Chair): because the board had to sign it.
[41:17] Sean Gerard: Yes, but that doesn't mean I got it. I mean, I get 10,000 emails and 5,000 scam mails, so I mean, it doesn't say that, you know.
[41:24] Selectman (Chair): No, you get this one.
[41:27] Stan Hackett: Anyway, and when it came to miscommunication, Stan didn't know what he wanted, okay?
[41:32] Sean Gerard: Well, you didn't tell me that when I gave you the map, you didn't say, Sean, this is nowhere near closed, this is not what I want.
[41:40] Stan Hackett: Exactly, and I'm not going to make any excuses, Sean, all right? There are a lot of details that go on and on and on. I don't remember exactly, but that is why we started to put everything in writing, very detailed, including I can get all of that on there, I just need time to go
[42:06] Sean Gerard: bring it back to Mike and have all of that put on there, and then the only thing we'll have to discuss is the pad, because obviously we're coming into the winter, we want to do it right, we don't want to take in. I can go dig you out a pad and I can put concrete down there tomorrow, but it's not going to be right. It has to, the dirt has to be tested, if there's any dirt that said it's a problem. We take it out. There's no dirt that's been tested. How far they tested it when we did the detention bomb, we went down 24 feet. They found no contamination that, yeah, it's been there since 1969 and they found no contamination down 24 feet though. And Stan has that. They did grid testing and everything.
[42:59] Speaker A (unidentified): I mean my concern is this has been going on, you know, since the 2023, March 2023 renewal. Agreeing to replace the concrete pad within two years. We're now three years, three and a half years out, still not done.
[43:17] Speaker F (unidentified): Soon to be four is, yeah, according to the state, the
[43:26] Sean Gerard: concrete pad was something we agreed to do above and beyond. The state didn't require us to put in a pad, but it was agreed to do, but when I
[43:38] Selectman (Chair): can I remember from that hearing, because I know I specifically asked you or told you, make sure that's in by November.
[43:48] Sean Gerard: I go put it in if you want it in today. Why isn't it in now? Because you can't get somebody to test the goddamn dirt, Howard. There's no sense of taking, putting the pad in unless you get somebody to test the dirt to make sure that it's clean. If you can't do the whole thing in this right steps
[44:02] Selectman (Chair): there's no sense of doing it. You've got an existing pad in there right now, right? Yes, and that has to be replaced. Part of it does, yes. Half of it does, so if that was, that has been tested
[44:15] Sean Gerard: before you put it in, right? Yes, but then you process cards on it, you break up stuff, you get a leak. You want to make sure that when you take and you redo it, you're putting everything right and you're doing it correct. You don't want to just cap over a dirty landfill. If that's, I mean, if I throw that out there, you're going to make sure that the test people come in and test to make sure that when you put the new concrete in, there's nothing there on the ground
[44:39] Selectman (Chair): and you're not capping it off. It would seem to me that the whole thing would not have to be totally tested. It's just where you've got cracks or whatever the situation is, something that would the engineers can deal this with, is they come in with us, they come
[44:57] Sean Gerard: in with baggies and sniff test it. Take a piece of dirt, they put it in there, they weave it in there, zip for so many seconds, and bring over a meter, they test it. If there's nothing there, then you don't have to dig there no more. If there is something in above a certain decimal, then you have to re-dig it. This is what
[45:12] Selectman (Chair): I'm saying, if you've got a pad already poured there, let's say you've got a crack and it's opened up, you can take that area out, test it. You wouldn't have to test it before if the other one was already pre-tested before you poured the concrete. It doesn't work that way. You have to, they test
[45:31] Sean Gerard: they test the whole area. The
[45:37] Selectman (Chair): fact of the matter is you haven't done it. I understand, I understand.
[45:42] Speaker B (unidentified): That, you know, it's hard to get the people into test. I get it, but it's been three and a half years, Sean. [Sean Gerard: I understand that.] You haven't, nobody's had any availability for CIA limit main in three and a half years?
[46:04] Sean Gerard: Well, it's, I don't know. Well, we've called, when we call, nobody has availability. I can't even get rid of waste oil, because everybody's so busy. Nobody has time to do it. We call 10 people the DP sent us and we can't even get rid of oil and gasoline, you know, the world is right now and I hate to tell you, tell you that, but getting people to come out and do that is, you know, they're a niche. There's certain people and they're doing these big jobs and it's just hard to get everybody. Well, I would think if you, if you
[46:36] Selectman (Chair): hired these people to do all these tests and whether it be Route Five or if it's been over on Range E Road, you have a rapport with them.
[46:46] Sean Gerard: Yes, we've used Oak Engineers before.
[46:49] Selectman (Chair): And I would hope, because of that rapport, that they would be able to come right down and say,
[46:53] Sean Gerard: if you call them up. But they're still short-handed, Howard. It's not that I don't wanna do the patent, I just wanna do it right.
[46:59] Selectman (Chair): But, Sean, it doesn't take 90 days. Sure it does.
[47:03] Sean Gerard: It doesn't take 90 days. It takes longer than that. No. These guys are out years, Howard. You're lucky, I'm lucky that I know the surveyor. That's why I do have that map in front of us. Phil Rock was, is fit me in because we've done millions of dollars and thousands of dollars with him. But Phil Rock is, he's a year out. He's not even taking any new clients because they can't find the help.
[47:30] Speaker A (unidentified): I mean, if they're scheduling years out, when are you scheduled to have it done?
[47:35] Sean Gerard: Right now we've got confirmation that we can get people to work with us by June of 27, which is only six months away.
[48:00] Speaker B (unidentified): When did you contact them for them to give you that June date? How long ago did you?
[48:05] Sean Gerard: Eight, nine months ago we've been after everybody. So they're trying to get everybody, we've told them we haven't did it.
[48:10] Speaker B (unidentified): That was eight or nine months ago. What about two years ago? Was there a credit?
[48:16] Sean Gerard: Yes, well, Phil Rock was doing all of that back then and he doesn't have the manpower to do it now.
[48:23] Speaker B (unidentified): The company we had. But when you found out that accredited lab didn't have the manpower, did you make any effort?
[48:30] Sean Gerard: Yes we did, yes we did, yes we did. We made effort to talk to people and nobody would touch us. Phil Rock used to do it, he doesn't do it anymore. Oak engineers, which is on this paper here, they don't do it anymore. They do just heavy environmental places and that's it. They don't have time to do all of it anymore. more oak engineers you figure they did this plan for us back in 2008 they don't have time for us anymore there's no money in coming here and sniffing a little bit of dirt and telling you yes or no dig deeper don't dig deeper oh
[49:09] Speaker F (unidentified): there's all kinds of money i'm sure there is i'm sure
[49:12] Sean Gerard: there is plenty of money it's roughly three to five thousand dollars for them to come through the sniff test but you got to have somebody that's qualified i can't buy the machine i can't do my own sniff test because they don't have, I'm not qualified.
[49:25] Speaker B (unidentified): You're not accredited.
[49:29] Speaker A (unidentified): I mean, is it outside of the realm of possibility to do a 30-day extension to have a completed site plan done per the requirements and confirmation from a company that it is date set to have that concrete pad replaced?
[49:52] Sean Gerard: What are you asking again?
[49:54] Selectman (Chair): You can't pull the confirmation.
[49:56] Speaker A (unidentified): No, I'm saying confirmation from the company that it's scheduled. It's going to happen. Here's when it's going to happen.
[50:02] Speaker F (unidentified): Yeah, but that's in the springtime. That's after all the spring rain and all the snow melt and everything else. Yep, you're right.
[50:09] Sean Gerard: That's right. And we've had 20 years of water testing. We have never had our water tested right where they are every month. Every month? You're
[50:29] Selectman (Chair): dealing with, just a minute, Merrill. I'll recognize you when time comes here. My big concern, Shawn, and I've done this many times, is I don't like that plan.
[50:44] Sean Gerard: I can update that plan, and I apologize for that.
[50:47] Selectman (Chair): I'm sorry for that. How can I get that done in 30 days?
[50:51] Sean Gerard: I can go out right now, if you give me five minutes, I can go out and ask Mike how soon it would take to update it to everything you guys want. I know he's busy as well, and he squeezed me in to get that and we may have got that in email but i don't see every email that comes through
[51:12] Selectman (Chair): when i apologize for that 's my fault but this is a copy yeah of the approval for the 90 days extension so you got it and there's conditions on that approval there are 15 conditions i don't remember seeing it now i really don't stand
[51:34] Speaker A (unidentified): it was hand-delivered to you
[51:40] Sean Gerard: said this was hand-delivered to me and my sign that I received it I may have received that I may know I'm not calling Stanley you guys a liar I'm just saying I don't remember seeing this notice of decision and it's the first time I've seen it today in months when is the last time you did water testing we didn't do last quarter because there's no water in the brook because dp was at this facility do you have dps paperwork there was no water running there's no water you can't get in the water you can't get a water sample and give you a dirt sample so when
[52:24] Speaker A (unidentified): was the last time you did water testing it was june of 2014 quarters okay june of 2016 quarter
[52:31] Sean Gerard: and then they may give it to you and they give you results 30 days later so
[52:41] Speaker A (unidentified): you said you did to do monthly testing, where?
[52:43] Sean Gerard: We have, fill rock comes out every quarter. We don't test the water every month. Every quarter we do it.
[52:51] Speaker A (unidentified): Okay, so quarterly not monthly.
[52:53] Sean Gerard: We do a quarterly water test, yes. Okay. This is quarterly test done that they do the samples on. In the last 15 years, 20 years, every sample has been the same. We have not had any spikes or anything that the DEP is worried about. So
[53:11] Speaker F (unidentified): was he all up to date on his on the water test?
[53:16] Stan Hackett: No, there was no water test done in the third quarter. We're now in the fourth quarter. The, again, the earlier communications you got from me was saying that we understand due to weather conditions that the water sample was unable to be taken. it but please provide the town as soon as weather is allowed there are stipulations with the water sample it's got to be done within two hours of the rainfall event ending and it would be ideal considering we've been through a drought to get the next water sample we
[53:54] Sean Gerard: have everything there to take the sample but if there's no water on a dep even put it in that report there was no water
[53:59] Speaker A (unidentified): running out of the pipe but it has rained since june i'm we've got quite a bit of rain that
[54:05] Sean Gerard: pond is eight and a half feet deep that pond has to fill up the water has to flow out the overflow
[54:12] Selectman (Chair): and go out into that and but you don't have to have that flowing out to get a water test at the
[54:17] Sean Gerard: Bottom of it, yes I do. I also test the brook. We test the brook upstream, downstream, where the water has to come out of the culvert. We test right there. We test downstream 25 feet. We test upstream 25 feet. We go up there a quarter of a mile and we test the outfall up there a quarter of a mile or whatever the measurement is. And we test upstream and downstream from there as well. So the brook has to have sufficient run and the water has to run out of the pond. We don't go in the pond itself and test the water.
[54:53] Selectman (Chair): I would think that's where you'd want to be testing that. I'm not the engineer, Howard.
[54:58] Sean Gerard: I'm not either. I'm just, we tested the outfall pipe and I believe if we look at one of these maps it would show it, Stan.
[55:09] Stan Hackett: What were you going to say? You don't want to test out of the retention ponds or in that vicinity. There's a absorbing sock that is to prevent any contaminations from going any further than the ponds. So the testing is done at the outcrops beyond the ponds and up here prior to the property. If there's any contaminations found then the retention ponds are not doing their job. Would it require eight feet of rain? I'm sorry? Would it require eight feet of rain to get the test? Well again we've had an abnormal dry drought, so it's going to take an abnormal rain event to saturate the ground enough to
[55:55] Speaker A (unidentified): run off. Okay, so this is not necessarily by choice.
[55:58] Stan Hackett: In one case there was a significant rain storm, I think the beginning of August. The problem was they didn't have any testing jars to take samples with, and apparently, from my understanding is, there was none available, but we need to plan ahead that's been communicated.
[56:19] Sean Gerard: We are planning ahead, and if there's no water coming out, I can't take it, whether I have a bucket or I don't.
[56:24] Speaker A (unidentified): So you have test kits available?
[56:26] Sean Gerard: We have buckets available. They're in the office, yeah. Okay. And we've been told that they're good for up to 18 months. Buckets? They're not buckets. There's four coolers, and they have bottles, and they're all labeled. They got certain chemicals in them that last so long and you have to fill it to this depth and then you got upstream downstream benchmark you got benchmark for the other one and then upstream and downstream if there's no water we can't test it and if you look at the results of the last 18 20 years that we've done testing water's always the same you may get a little higher in the spring melt but that's about all you get and trust me if the plan aboard if there was
[57:09] Selectman (Chair): Any contaminants they would already be on me. Sean, who's the company that you guarantee that said that they would do this in June? Chris Bullock Jr., as you know, Chris was out for back surgery. He's
[57:24] Sean Gerard: going to do the concrete. Phil Rock is going to set up for the testing and the soil. With everybody being sick and all of that, Phil Rock was also out, was supposed to be out today for his quarterly visit, and he didn't show up today because he was sick. I'm
[57:59] Speaker B (unidentified): bothered by the fact that you run a business. I'm sorry? I'm bothered by the fact that you run a business. Yeah. You was before us on the 23rd and you wasn't concerned enough about our concerns to inquire. Did I ever get the requirements that the board
[58:22] Sean Gerard: You didn't, I didn't believe there was any. When I came here, my honest, and I can swear to God on the Bible, I was asked for a site plan to show my boundaries. That's all I was asked. And then I turned around and then I said to Stan, I said, Stan, I says, if you want all of this, I can pencil it in. I said, but I was not anywhere thought that I had to have all of this on the map, on this site map. I don't believe I received the paperwork that you said. These are your terms and conditions, Sean, and this is what you have to have. Because I obviously went and spent the money and went to Ford to have Mike LeDon do the map. If I had to do more, I would have asked Mike to do more. So I don't believe I received that paper. Stan might have handed it to me or handed it to the office or emailed it, but I don't believe I had it. I did not sign for it, I know that. Today is the first day I've seen the 16 conditions and all of that in this paperwork. I do not know how it, to be truthful, I have no reason to lie to you.
[59:39] Selectman (Chair): No, but did it go through your attorney?
[59:42] Sean Gerard: I don't know, I don't believe it went through my attorney because I didn't bring this part of the, if I went through my attorney, he'd be sitting here tonight. I did not bring this to my attorney's attention.
[59:50] Speaker A (unidentified): When we do a conditional, there's conditions attached.
[59:55] Sean Gerard: The only condition I believe there was that I had to have a site map showing the boundaries because Stan wanted to know where the property lines ended. And that's what we hired Mike to do. I did not hire Mike to do any of the other stuff in this map. On
[1:00:12] Selectman (Chair): the site plan, on any site plan, it...
[1:00:17] Sean Gerard: It doesn't show measurements, it doesn't show spillways, it doesn't show all of that.
[1:00:21] Selectman (Chair): It's the scale, which is your measurement. However, there are other places you have to put figures in.
[1:00:29] Sean Gerard: That is the scale and we thought we were doing
[1:00:31] Selectman (Chair): a site map but I don't see anything here where the tire stuff is. Yeah, natural pawns aren't made with a pen, Sean. I understand that but I did write in this stuff today with Stan but
[1:00:48] Sean Gerard: there's a tire pile right there and that's surveyed by mine and then we wrote this other stuff in because Stan said he wanted it and we were going to pencil it in. We were under the assumption we were doing a boundary survey so that you guys knew how far we owned behind the other houses. That's what I was under the assumption of. I apologize if I'm wrong. And I don't believe I ever received this paperwork that states what I had to have on that. I did not receive that. And I don't believe you have one with my signature.
[1:01:35] Speaker A (unidentified): Well, we've already ascertained that we did not make you sign to receive a copy. It was emailed to you, it was hand delivered to you, whether you read it or not is not a question. I mean it's, we sat here and discussed, and I'm going to go back to the concrete pad because that was a major one. It was. And it was, yep, I can have it done by this day. I can have a site map, yes, and I have I have a sitemap. No, not a sitemap. Not a sitemap. The pad.
[1:02:11] Sean Gerard: Oh, the pad, I agree that you wanted the pad done. I remember hearing about the pad.
[1:02:15] Speaker A (unidentified): But you keep saying the only thing that we wanted was this boundary plan.
[1:02:19] Sean Gerard: No, there was a lot more. You wanted the boundary survey, which I gave you the boundary survey there, and now the boundary survey is not good enough.
[1:02:31] Selectman (Chair): Because it doesn't contain all the information that was asked.
[1:02:36] Sean Gerard: The three pieces of paper you have here, Howard, I agree with you that it doesn't show all that, but it does not show everything on one piece of paper.
[1:02:44] Speaker A (unidentified): I mean, the screening and maintenance. Applicant shall maintain screening, fencing, concrete, block barriers, vegetation, gates, and related features so that required screening maintains effective and acceptable to its town. That's all there. Has the screening or offense been put in?
[1:03:06] Sean Gerard: It has, okay. All your boundaries. The only thing you don't have, ma'am, is this concrete pad. Okay. And an updated site pad. Listed everything under the sun. But
[1:03:25] Speaker B (unidentified): you must recall the discussion that we had about that concrete pad. I mean, that was-
[1:03:29] Sean Gerard: Yes, but if I can't get something to come out, do it right. Time out.
[1:03:33] Speaker B (unidentified): Now, when you made effort to get someone to sample, I really think that you should have reached out to us prior to that to explain.
[1:03:48] Sean Gerard: The concrete patch was never something the town required for me. It was DEP, and I made the deal on the concrete patch. We just told the board what we were doing and we said we would get it done, but it was never something back in the day that this board required me to put in for me. was something I agreed with the DEP. And the negotiations I've had in the past have always been with the DEP on the back. They have not been with this board or the planning board.
[1:04:15] Speaker A (unidentified): But it was part of the March 2023 agreement which I can't go back 20 years I can't go back 30 years but I can go back three and a half years and it was in there. We're now three and a half years later it is part of the part of the conditions has been part of the conditions for three and a half years and I mean it's hard when you just get no I haven't been able to get anybody sorry you know maybe by this day well maybe by this day has come and gone several times with 90 day hearings. water testing we know wasn't that isn't an issue just because of weather can't control weather site plan concrete pad those are the two main ones that i could see on there at least that i mean the dep report was pretty good
[1:05:25] Sean Gerard: I have 60 days. I can go to Mike and create one master plan with the topples on it, the spillways, the swaleways, everything you see on all three of these maps on the one print. And I would have to ask for an extension on concrete pad. Just definitely can't do that. Can't do a half-assed job and not do it right.
[1:05:47] Stan Hackett: DEP has also stipulated and given Sean no longer than June 30th. They have actually come down and stood in on a bridge line and said that pad needs to be replaced no later than the end.
[1:06:08] Speaker A (unidentified): Completely replaced or just the half of it? The
[1:06:29] Sean Gerard: pad is still there today.
[1:06:32] Speaker F (unidentified): You just said we had to replace it. You had to replace the whole pad. Yeah. yeah well we asked you if you could do half of it and you said no they got to do the whole thing you said that ruck is the one that's going to do the work and I might be missing no I'm sure that I'm no brulots will do it they'll do the concrete work they'll do an awesome job but you said that ruck was going to do the testing but a little while ago I thought you said ruck went out of business because he can't find any help Phil Rock is still Phil Rock was supposed to be here
[1:07:02] Sean Gerard: Today to do a cycle, he comes every quarter to do a cycle. So you want to borrow my hearing, but Phil Robert's supposed to be here today. He is still in business. They do it every day. They do bigger projects, three times big, quite fast. The sawmill was burned up north. That was one of his sites. What's
[1:07:25] Selectman (Chair): his company, Sean? Still
[1:07:30] Sean Gerard: water environment again.
[1:07:34] Stan Hackett: I, as far as half the bed or the whole pad, I will always understand it to be the entire pad. I would have to get clarity and clarification on whether it's half the pad or the whole pad. In my experience, again, if you do half the pad, it's got to be married together, and I'm not quite so sure if the existing pad is stained enough to be drilled and spiked. I don't know those answers. I'm not an engineer. That wouldn't qualify under filled up or restored.
[1:08:09] Sean Gerard: Even if you put it in a concrete pad, it's going to crack. I don't care if you put it in your driveway, it cracks. You put it in your garage, it cracks. You put your foundation, it cracks. So you get cracks in the foundation. You get cracks in the concrete.
[1:08:24] Selectman (Chair): You get hairline cracks if you get
[1:08:28] Sean Gerard: it all reinforced properly. What you do with this is you're taking your saw cut, the pad, you pin the pads together, but as long as there's no contamination or anything in there, you pin the pad together and you use what concrete is there. You don't want to say you're taking up a whole concrete pad that's 80 by 200 or whatever the measurement is, but
[1:08:49] Speaker A (unidentified): you don't want to have a gap in there either. No, and you will, you don't want to have a gap between, no, the two halves. So they've got to get it
[1:09:28] Stan Hackett: was an inlay or the wire meshing was an inlay is usually a cause for a crack or the thickness of the concrete pad wasn't appropriate. Or if the mix was wrong. Correctly in the mixture. So now they have fiberglass to go in with it. But the ones I built in Massachusetts, the concrete was actually a minimum of 60 to accommodate the vibrations on the machine.
[1:09:58] Selectman (Chair): There are definitely... Did you just say six feet?
[1:10:01] Stan Hackett: It was six feet, yes. These were the ones I dealt with German machines. This machine cost over $49. So, if it cracked, that machine wouldn't make corrugated boxes very well, because the machine
[1:10:17] Selectman (Chair): would... What kind of money? I didn't want it to talk to me.
[1:10:21] Stan Hackett: That's, again, if it's poured lightly and designed right, you shouldn't have the issues with cracking. Cracking is usually stress of some sort.
[1:10:30] Speaker B (unidentified): And I would have to agree, because there are industrial sites all over Maine, all over America, that operate with cranes as heavy as 50 ton that operate day in and day out. My experience at the Portsmouth Naval Shipyard, I've had porthole cranes ran for over 30 years on sections of pier that never cracked. I mean, to say concrete is gonna crack, it depends on how it's poured, how it's sat, and there's a lot of variances there. So that's, to me, it's not a viable.
[1:11:08] Selectman (Chair): Well, if it's engineered properly, you won't have a problem.
[1:11:11] Speaker F (unidentified): You're gonna run excavators and stuff on it, and it should be more than 10 inches thick. Right. Yeah, well. We
[1:11:29] Sean Gerard: have three things. I don't believe I received your letter of recommendation or your terms and conditions. I don't believe I received that for today. One, I can't get it back until June of this coming year, which is six months away. And my site map, my boundary survey, which I was under the assumption was a boundary survey, I can't get completed until I go see Mike to bring it up to what you want. Within 60 days, I come back to you with the site map, 100% done, so with every boundary, every building, every spot of everything, he has everything there, he just has to overlay them and get them done. Concrete that, I would ask for extensions of June. Would
[1:12:18] Stan Hackett: you be able to, within the 60 days, be able to get still water to provide you the information for the pad, whether it's half a pad, a whole pad, whatever it is?
[1:12:28] Speaker A (unidentified): And a date certain and a date certain on one I mean, and if we can assume, okay, that it's going to be the full thing, okay? When can they guarantee they'll have it done?
[1:13:16] Stan Hackett: That's... Well, regardless, he has committed to no able. Once that is put in ink, if June or July 1st comes around, that is a violation, and we've been through this with the plan board recently, the boards, both boards, when there's a use of permit involving these properties, both boards have to be notified. There is a time frame for an appeal and the right to a cure. If that time frame goes unanswered or unmitigated, then the boards have a due process that they must by statute, or should by statute, have no public hearing for disciplinary action in mediation of the issue, which could include evoking a public hearing.
[1:14:17] Selectman (Chair): Mayor, you've had your hand up for a long time. A long time here. Is there something to add? Mayor
[1:14:36] Speaker G (unidentified): Farrand, I've had comments that because I wasn't recognized until now, I am going to probably be talking about the things that should have been talked about when you were relevant in the moment. But the water testing stan did tell him in August, with the rainstorm coming, to be prepared and to do it. He didn't have the kits. Boy, something that I had to do every quarter. I would think that you would have a kit available, just saying. The processing pad, I'm going to go back to a legal document from the DEP dated 2014, solid waste license. This is specific to CIA. Section 17, process design information. Subsection B, processing operations. Subsection Section 2, material processing. Last paragraph reads, metal will only be stored on paved pads or inside buildings. Sub 3, material storage. Ferris scrap metal is stored in outdoor piles on concrete pads along the west side of the facility waste handling area. Vehicles are generally processed within 24 hours of delivery. If more vehicles are received and can be processed in this time, they may be temporarily stored in the stripping area. I don't see stripping area anywhere on that particular site map until they are processed and crushed. If the stripping area becomes full, no additional vehicles are accepted until adequate space in the area is cleared. Non-ferrous metals may be stored in the main building in the non-ferrous processing and storage area or outside on concrete pads until shipped to destination facilities. This is 2014 DEP license specific to CIA. The pad size for the shearing area, processing area, I've heard so many different names for that particular area. I don't want to say I know what you folks all feel that is, but it's that big pile that has lots of metal and I see tires and lots of other things in it. You have received, and I want to remind you of an email from the DEP. It was an exchange between myself and Eric Hamlin that went on for several back and forths. On the email that was dated, October 6th, 2026, this stated the pad size to be 75 by 110 feet in the amendment order that corresponded with and was driven by our 2021 agreement, enforcement action, I'm sorry, an administrative consent decree with monetary penalty. So in 2021, the size of the pad approved was 75 feet by 110 feet. Go back to your pictures and images that you have of that area and see how big it is. Remember that you have a report, if you had time to read it, that came from Derek De Castro on November 4th when he and Stan did an inspection that said he could not find the pad when he walked around that pile. He said it's the end of his email said this is a public hearing not a, if you want to turn me off they can turn me off, the last part or of that email said it is important that metal processing occur on that pad. No one can see the pad, no one knows exactly how big that pad is, it's not referenced in anything Mr. Lalonde didn't reference that area at all on his plan and I will go back and say that I appreciate that somehow Mr. Gerard stated he didn't find or feel he got this material, but he was at the same meeting I was on June 23rd, and sometimes you have to go back and listen to things again, but when I listened in quickness, I wrote down that the site plan that you folks mentioned required operations areas storage area definition tires fluids distance from waterways residential areas private wells and highways and that was just me trying to keep up with writing down what I heard Mr Gerard had that ability it seems like people are being hired and not given the task that they should be given on step one so things are repeating for you folks over and over again. The pad was to be completed for many years, but no one had a consent decree from the DEP. The town had the expectation from planning board meetings because I've been attending meetings for seven years. So I know that people think that I'm just being a nuisance, but all I'm doing is saying follow the law and for seven years, well four or five of the seven years, I've heard about this pad that was going to be completed at least when I converse would stand recently he said that still water never heard about having to do this concrete pad thing in the soil underneath until just recently and I can't say exactly what they just recently was because they didn't do that and it's I'm an anecdote to tell you what Stan said with to me but in early October is when that decision by the DEP extending until next June came so it must have been shortly before that theoretically they heard as you had said it's been three and a half years at least that you've seen in paperwork where an organization could have been contacted and everything could have been done easily. Water is tested, but you want to know what? The town's only required testing, or the DEP actually, and the town is supporting it, and surface water. There's no deep water testing. Anything that's below that pad is not going to be in that surface water that's coming out of the detention pond. It's going to be in subsurface well testing if it was ever done. So there is contamination probable, highly likely. I think Eric Hamlin has said in that area of the soils we just keep extending the amount of time that it gets to leach down. I know you folks had to listen and deal with and are still dealing with that TCE issue. We're smarter now. We know a few more things, but we still are going to have surprises in life. This shouldn't be a surprise. This should be simple. Black and white should have been fixed. Defiance isn't a good excuse. And I will say that Mr. Girard answered when Mr. Burnham asked them last time around about the size of the shearing area, so I'm going to call that processing pad, et cetera, et cetera, and Mr. Jarred answered 120 by 140 feet. It's pretty big. So again, he doesn't know the size of this pad that he's supposed to be limiting his time, his operations to, and if he's to exceed it, then he needs to be doing something about it. I don't know why DEP doesn't, but I'm just telling you what's in black and white, what's been permitted, and expect that it is the right thing to do to follow the law, follow the ordinances we have. I'm going to bring up something that I was a little disturbed by, and it's Selectman O'Connor's had said at the end of last meeting at two hours and seven minutes we hammer at on CIA Salvage. Since I moved to town in 2022, that's the only real planning board meeting where it takes 15 minute meetings to get something accomplished. I think it's ridiculous. It's a business in town that employs a lot of people, brings in tax revenue. And sadly, you agreed with that statement. I want to read to you how the state sees junkyards and graveyards. This is state statute. It's under Title 30A, Municipalities and Counties, Part 2, Municipalities, Chapter 183, Economic Regulations, Subchapter 1. So the state looks at a junkyard and automobile graveyard and has very specific laws and rules, just like you have an ordinance saying he has to come back every two years for renewal of his license or conditional use permits. So it says that junkyards and so-called auto graveyards have been steadily expanding and frequently encroach upon highways. These junkyards and graveyards have been a nuisance and a menace to safe travel on public ways, often distracting the attention of drivers of motor vehicles because it appears cars are parked on the highway and that an accident has occurred. It is declared that such junkyards and automobile graveyards are a nuisance and are properly subject to regulation and control. It is recognized that recycling of automobiles is a business enterprise that when conducted in accordance with certain standards differs from the enterprise of an automobile graveyard, and that adoption of uniform state standards for this type of business enterprise would assist in development and regulation of that business. Junkyards, automobile graveyards, and automobile recycling businesses pose potential risks to the environment, particularly to groundwater and surface water quality if gasoline, oil, or other fluids are not managed and disposed of properly. Proper location and operation of these facilities are critical to ensure protection of groundwater and surface water quality, other natural resources, and the health and welfare of Maine citizens. These facilities may create nuisance conditions potentially affecting abutting landowners and others if not located and operated properly. For those reasons it is declared that the facilities are appropriately subject to certain environmental and operational standards and to appropriate municipal and state regulations. Now I didn't want to really cite two of you for any kind of agreement with this process having looked like it wasn't proper, but I know you wear many hats and it's hard to know everything, and I've been doing this for seven years, so I've particularly read a lot of the stuff in regards to this stuff, and that's why I wanted to read what I just read. I want to educate you so that you can make those good decisions. I appreciate your listening. Have a good night. As
[1:27:57] Sean Gerard: You know, and Stan can vouch for it, we get rid of all our gas, oil, antifreeze, everything we have in our cars. We do it environmentally safe. They all go, everything goes to proper facilities. We recycle our gas, we recycle our oil, we use waste oil furnaces. You know, if you don't have a junkyard, or a salvage yard, or an auto parts store, where you gonna buy a used part, or where you gonna get rid of the stuff that comes in the dam? You know we may not be a white piece of piece of property you know for an has me in his love book but it's a necessity that has to have you have to have a place to get rid of the material we process over 5,000 cars a year. We did all our stormwater testing, we've done every all the stormwater testing the DEP has told us. We missed one test which was my mess up. Every other test has been either no water. I think we've only missed three tests but for no water. One of them was my fault, I didn't get it done in that quarter and obviously if I miss that day I can't go back. That was years ago. We try to stay on top of it, make sure that everybody's done, we're doing what we're doing. You know we're not to there isn't everybody that comes out to say hey I approve what Mr. Gerard is doing but we have Mr. Ferran which disapproves. I would like 60 days to redo the permit, redo the site map because I didn't get all of this. I honestly do not believe I had this. If I had this I would have given it to Mike and said Mike this is what I need, whether he could have got it done bestow be get my ass chewed or not I don't know. I would like an extension on the pad to work with DEP and to work with Stillwater. Two years ago we tried to buy a tester, the sniff tester. We couldn't buy it, we can buy it but I can't use it because I'm not certified. Stillwater lost one of his guys, the guy that he, matter of fact I think there's a little dent up there in the wall up there, he moved to New Hampshire because Aaron upset him so much. He was a veteran, he still is a veteran. He works in New Hampshire. He lost half his crew, went over to Vermont. He was supposed to be the one to do the sniff test. We've tested our dirt where the ponds are. When we dug all the ponds, that whole area was tested. That was where the old global salvage started back in 1969 with Jim Geary. We dug down 26 feet and they tested everything in grids. Somewhere in my paperwork, Stan must have it in his paperwork, they found no contamination nation in the 26 feet of direct that they put in. Mr Faram would like me to spend another twenty thousand dollars on test wells, and then I don't know where that would go. I mean, we have one of the any you, I can show you pictures, I can bring up my phone right now and show you pictures of the odds. It don't matter because they're not in town, but we are one of the cleanest in the state. We do everything we're supposed to do. We take care of our materials, we get rid of the gas the way we're supposed to. Gas cost me five six dollars a gallon to dispose of. I could just turn on the faucet and dump it in there as well, but I don't. And I haven't dumped it anywhere else in town. If there's something that we need to get rid of, we pay to get rid of it. Do I always like it? No, but we do it. We do what we're supposed to do with it, and we get rid of it. We dispose of everything the environmentally way. If I die today somebody's going to step forward, and someone's going to be in my footprint. So I don't think that you know somebody's, somebody's going to be here to run that yacht for the next 50 years or 100 years or whatever it is until you know salvage out is no longer needed. I apologize to the board for not having this piece of paper knowing what we wanted on this site map. I thought it was just a boundary survey again, and that's what I got.
[1:31:56] Selectman (Chair): Sean, I've got a question for you. I'm just looking on this oak engineering plan. It says proposed transfer station slab. Is that the same slab that you're talking about?
[1:32:13] Sean Gerard: Originally, we proposed three slabs with DEP. That transfer station pad, this one here, of the big one is there. That pad is there. We have approval from dep to use it temporarily for scrap when we change out the other pad or we change cut the other pad into pieces to use what
[1:32:40] Selectman (Chair): we can or we can't, but that's what's existing. That's going to come out. That
[1:32:46] Stan Hackett: big pad is already there, Howard, and that's not the one. The one that needs replaced is this one right here, vehicle
[1:32:59] Sean Gerard: prep area no that 's right behind the main building this pad does not need to be replaced you're looking at this site there's three of them here these two are not available this one is the one that's going to be replaced all
[1:33:15] Speaker A (unidentified): right, which one is the one that dep could not see when they did this, when they did the walk? Okay,
[1:33:24] Sean Gerard: because there's metal stacked all over it. Okay, Stan, what
[1:33:50] Speaker F (unidentified): is the C U P and capital letters, the C D er? No, it's a C-U-P, cup.
[1:34:00] Selectman (Chair): Conditional use permit. Okay, sorry about that. Based on everything that's been said here tonight. I'm sorry? Based on everything that's been said here tonight.
[1:34:33] Sean Gerard: I also have a question, Howard. It says here that this is something that I just received as well. It says here on this, here for CIA severance recyclers, It's on March 20th, 2023, that I had not completed the fence along the scale. Well, Stan did say to me that he went back and that there is not supposed to be a fence next to the scale.
[1:35:01] Speaker A (unidentified): Right. Well, Stan, I actually asked about that, and Stan said that is the way it's done. It's complete. It's not in violation. That one is good. It has not.
[1:35:11] Sean Gerard: There hasn't been anything this board has asked that we have not completed.
[1:35:15] Speaker A (unidentified): Right. He confirmed that one's fine.
[1:35:17] Sean Gerard: Well, I know but it does it's just reading it says it's not complete right if you listened earlier
[1:35:24] Stan Hackett: That was the discussion and the things that was asked on June 23rd
[1:35:28] Speaker F (unidentified): I had asked that he had I'm not even sure what the day was. It was like 30 days and then or two months and then John had brought up and they extended it but my original motion that I made was that it went from the gate all the way across the scale area to cover everything, but I didn't get a chance to go back and look through those
[1:35:57] Sean Gerard: minutes. Dan said he found it in the minutes. Is that correct, Stan?
[1:36:00] Stan Hackett: And that was discussed at your renewal with the select board in 2023. And it went back and forth and one of the board members had mentioned that because of the poor communications and lack of the communication with the planning board they really were left in a awkward position on knowing what needed to be done and what didn't need to be done
[1:36:31] Sean Gerard: well again day one that you need you need to be on this side of that scale and any of you were welcome to come down at any time you want you need to be on this side of the scale to see the car that's coming down that road there to make that corner and safely pull in because i mean everybody's doing 50 60 miles an hour if it was requiring me to put that in where the scale is i would have done it i would have had to do it well you did
[1:36:54] Stan Hackett: Object at the time, Sean, but the original conversation started with trees, all right, because some of the trees that are existing, because of the salt and stuff from the road, have started to show. Was you would be able to, if you're going slow enough, you could see up into your junkyard, okay, so you did object to it because of visual issues, you want it, so it was decided at the time, and I'd have to go back to the minutes, but my memory recalls that from the scales north, so from the end of the scale north. And what you did, because tried planting trees and it was not working, as they've decided to is you put up the rock, granite stones or whatever they are, which is between six and seven feet, which also gives it between 15 and 18, possibly even 20 feet from the road height, so that did satisfy that condition, I'm.
[1:38:19] Speaker H (unidentified): Not an expert, but I did in my 20s work eight years doing foundations, and a lot of it was commercial, and if only half of the pad needs to be replaced, I know Lori had mentioned that the two pieces butted together, not only what they do is they do a vertical cut, then they do a horizontal cut, then they epoxy at least one or multiple rubber keyways to seal the two slabs together, that's how they did it down here in the middle of the hill with the new water tank, they those got multiple rubber keyways. Between the footing, the wall, and the floor to keep the water inside of the tank, so hopefully correct, yes, and that's where, okay, in I know junior Brulock very well, he would make all of that happen, but it has to be done correctly, so any contaminants doesn't run between the two slabs, right, yeah, does that help, Sean, how about.
[1:39:56] Selectman (Chair): The rest of the board, I'll put my two cents in here, based on everything we're seeing and things not being done, I would recommend that we deny the recycler's license and have him reapply and put everything on plans the way they're supposed to be, instead of giving all these extensions, Sean, are you talking suspension.
[1:40:32] Speaker A (unidentified): Until we have that, I mean, then he wouldn't necessarily have to reapply, correct, Stan, I mean, I if we did that, I would also want something from the engineer for the concrete pad to say yes, this is when it's going to be done, no if answer buts, because something in stone, yes, something in writing from whoever's going to do it, because when you hear it so many times that it's going to be done, it's going to be done, it's going to be done, I'm at the end of the it's going to be done.
[1:41:11] Sean Gerard: It's got to be done. If we deny my recyclers license, you're closing my door. I need the recyclers license to sell parts and do that. If you give me an extension on it, I can work on the extension. I can work on getting somebody, Phil Rock, and then to talk about the concrete pad. But if you denied the recycler's license and you shut it off today.
[1:41:32] Speaker A (unidentified): Can you get it in 30 days? I'm sorry?
[1:41:39] Sean Gerard: I don't know if I can get Phil Ruck to commit with everything he's got going in the holidays and everything on the concrete pad. I can talk to Mike, I can call Mike if you want to give me five minutes to talk with Mike and see if we can get everything for the recycler's license on this piece of paper, because as I said, I didn't get that other piece of paper. I certainly wouldn't bring you in a half-assed print and then tell you that here's everything you wanted. You give it to Stan and say here's everything you wanted and then try to pencil in whatever else.
[1:42:10] Selectman (Chair): That's my concern, Sean, is everything should be on paper.
[1:42:15] Sean Gerard: It should be on paper. But everything you want is on all three of these papers. So you're not being denied that it's not on the paper.
[1:42:24] Speaker A (unidentified): They're all different and not one is accurate. So you can't, out with what's not accurate.
[1:42:31] Selectman (Chair): That information you have, Shawn, all of this should be incorporated in that plan.
[1:42:36] Sean Gerard: I agree, now that I know that 's what you want.
[1:42:38] Stan Hackett: And that's what an updated plot plan is and that is specified in the statute. When there's any other changes, an updated plot plan needs to be done.
[1:42:49] Sean Gerard: Why did I pay somebody to do a boundary survey, Stan? But if you wanted a site map, well, you again, you needed the boundary survey to begin with, because that should be, well, we've been telling me I need a boundary survey and that's what I paid
[1:43:02] Stan Hackett: Mike to do and I admitted that is my own fault, okay? But again, it is all inviting and that is why we put it in writing and you get a complete version of the findings of fact and the conclusion
[1:43:17] Sean Gerard: I believe that I can work with Mike for Mike to get all three overlays of all everything in here on to a complete site map showing you every P, every building, every building is on that map. It just doesn't show you where the detention ponds on it. It doesn't name them, but I have, I have what you're looking for now. To say this is, this is this, if you give me 60 days continuance on the recycling license. I will come back and I will check with Stan to see if we can get it done quicker. We'll have it all drawn out on that site map so you have all three versions on one map with everything there. Then the only thing we have to deal with is the, and I do, I do know the survey is all straight out.
[1:44:05] Stan Hackett: we have one that the planning board is going to have to deny the application because they have dragged out over three months and they still don't have any idea when they're to complete the rest of it i have heard from michael lawn because i'm waiting for one other thing with the property where the fire bond is he is still behind but he's working on it so in still water between his vacations and prior obligations he's behind and now he's probably got the cold and flu that every single one of us have already had. So 60 days I think is reasonable. And if you don't have the things, and I'm not going to tell the board how to vote, but then at that point you may put in a stipulation that if you do not have those items within 60 days that it would most likely result in a denial.
[1:44:59] Speaker F (unidentified): Okay. And how long would it take for him to reapply?
[1:45:03] Stan Hackett: Reapply again is between 60 and 90 days. Can
[1:45:11] Speaker F (unidentified): I take the microphone? So we let him go back to, and it's got nothing to do with anything, Sean, I don't want to put you out of business. I don't want people to lose their jobs and not work. But he needs to do it. He's had three and a half, four years to do it. He's had, you know, he had this piece of paper. He knew what it was. It's not our fault that he didn't read it. He had all the conditions. And then we'll give him another 30, 40 days, 60 days, and then the
[1:45:46] Stan Hackett: lack of information, it isn't because of lack of information, all right. And this is why the town is taking the approach of the full disclosed notice of decision, conclusion of law, exactly the way it would be written if we were presenting it to a judge in court, all right. So the information is there. The problem has been it's always been delayed,. Nobody's ever asked for definitive timeframes and specific deadlines or criteria. The boards are now doing that. It isn't Shawn's fault again. It is because you didn't have the advising people that you have now working for you to show you the direction of where we need to go. So it does put you in a really bad position. But you're getting the time frames and the criteria is met. I wouldn't go another six months. I would not go another two years. But again, it's because of bad habits. You've heard me say this, have been ongoing and ongoing and ongoing, and it's time to break the
[1:47:01] Speaker A (unidentified): bad habits. So let me ask you this. Is it possible to do a, we will have this information no later than 60 days? If we don't have it, 's automatically suspended? Well, it's not
[1:47:17] Stan Hackett: suspended. You still will have to. I have another hearing. When you vote, you can vote. You need to have this in 60 days. Okay. You can say that the potential outcome will be you're revoking it, but you have to have a public hearing in order to do that. 's what I was
[1:47:35] Speaker A (unidentified): asking is if we have to go through another public hearing. Thank you, Mike. But again, I think it's
[1:47:41] Stan Hackett: reasonable, but I, there's been a lot of lack of communication here and there and a lack of information to the boards as well as Sean and the proper way to do things. You can have the floor. What'd you find out?
[1:48:01] Sean Gerard: Mike says we get it done within 60 days, so can we just push forward? He says he did not have a list of everything that you're asking, the 16 conditions and all of that. He did not have any of that. He said he was gonna call tomorrow morning, speak with me, speak with Stan. He says some of the stuff from Oak needs to be overlaid and changed. He'd get down there and survey the ponds where they are and put all the ponds on there so we could bring it right up to date. He said, I've been asking him for a...
[1:48:34] Selectman (Chair): Every bit of information you've got right there is gonna be on there.
[1:48:38] Sean Gerard: And I agree, and we didn't know we had to have that. I don't know where the miscommunication come from. I am deaf, I'll agree to that, but I did not get that. The 15 pieces that you have here, I did not get this. I didn't hear you on that. It got mailed to me personally at CIA Salvage or to Sean Gerrard because like I said, yeah, so I don't get every email. Diane, the office administrator, goes through the emails, and I apologize for that. 's nobody's fault but my own, but I thought I had to have a boundary survey
[1:49:31] Speaker A (unidentified): so I don't want to hear I didn't get it anymore, because at some point, you know, if your office staff is getting it and not giving it to you, are still getting it, you're just not, it's not on the town, because when you say well I
[1:49:52] Sean Gerard: Didn't get this right, but Sean, when you keep saying, well, I never got this, you puts it on the town that we never provided it. If it's something that is this important, then you guys have to have her do it, and they should sign it. Maybe my email was down that month. Who knows? You can't guarantee that something that's holding up my livelihood and 26 other guys' livelihoods came through an email, and you can't assume that it got read. But Stan also hand-delivered it. [Speaker B (unidentified): At some point,] You have to take accountability for it. Stan should have said to me, Sean, this isn't within a row of roses that this is what they want, but at some point you have to, I can take me accountable for my mistakes, but the board should be accountable that if I didn't get an email, I didn't get an email, but Stan hand delivered it, so that negates even the email. Now we, I still don't know when Stan hand to women it, but also that night that we
[1:50:58] Speaker B (unidentified): went over these, you talked to us, John, about not getting extension, you'd have to, you'd have to close on temporary basis. That would to me as a business owner, if I was looking at closing my doors, I'd be very concerned. I am very concerned, and if I hadn't heard from the select board within 10 or 14 days of what my requirements
[1:51:25] Sean Gerard: were, if you look into violations that Stan wrote me up for, okay, let's, let's dig, let's dig a little deeper, let's find the Stan baby. I don't know if I got it all
[1:51:39] Stan Hackett: of the notice, the decision findings is a fact and conclusion of law is based on the minutes that was transcribed of that man, so you were present when all of this was discussed as well, regardless again who's to blame, whether you received it, whether you noticed it, Sean, I've already said you've got a revolving business
[1:52:02] Sean Gerard: over there, and I have repeated responsibility 100. We just got to figure out how to fix it.
[1:52:09] Stan Hackett: One of the things I've repeated to you since June, if not even longer, is I want to focus on Route 5 so that you don't have to deal with this over and over, but you have answers that you can supply, and we can get through this without this back and forth, all right, and I understand that there is
[1:52:29] Sean Gerard: no blame, okay, so I'm not blaming anybody, I'm just saying I did not get that page again, maybe
[1:52:38] Stan Hackett: maybe you didn't, all right, it's irrelevant at this point. You're asking for 60 days, it is up to the select board to now make a decision. If they don't have any other questions, I wouldn't go with defending this anymore. We already realized there's a glitch somewhere, so we'll just own it. I would
[1:52:56] Sean Gerard: ask the board to please give me 60 days on the recycling license I spoke with Mike the survey there he would get you everything on that print is the day i have it just like the day i had it today or the other day i gave it to stand immediately and if there's something on there that's not there that we don't have we'd be happy to get it so
[1:53:19] Speaker B (unidentified): Can we get a standing commitment, a written commitment from a from a lab that they're going to come out and sample prior to June 30th?
[1:53:29] Speaker F (unidentified): For that within that 60 days before the end of the year, we'll make it 60 days.
[1:53:39] Sean Gerard: That I got to come back here, you know what I mean, put it down that I got to work with Mike. I asked Mike if you can get it done within the 30 to 60 day period, he said yes. What set a date did I come back here and we start over, what if.
[1:53:55] Speaker A (unidentified): we do it that all of the information documentation needs to be to stand no later than December 31st and then December well December 29th and then this way we can set the new hearing on the next hearing on December 29th that only gives me 30 days correct 45
[1:54:26] Selectman (Chair): What we're talking about, Shawn, you don't have to go out and do surveying or anything else, can I help you?
[1:54:30] Sean Gerard: No, he has to overlay all of that, but what you guys have to understand is he has to also get part of it from Oak Engineering, which I no longer do business with, and he also has to get part of it from Stillwater Environmental.
[1:54:43] Selectman (Chair): This is all done on computer.
[1:54:45] Sean Gerard: I understand now, and that's what Mike says. He says he can get it done. All right, so. So we plan on being back here in 60 days?
[1:54:55] Speaker B (unidentified): No, you just said, the gentleman said he could get it done, and we're saying 45 days. You're saying the guy can get it done, why do we need an extra 15 days?
[1:55:05] Sean Gerard: As soon as it's done, I'll give it to Stan, just like I think that...
[1:55:08] Speaker F (unidentified): If he called, I would imagine in a few days, if he called and they could email it over to him, he would have it in a day or two, anything, and then all he'd have to do is put it in the...
[1:55:15] Speaker A (unidentified): Or even four weeks, because they are busy, so, you know, but I think, because... Because the majority of it is done. It just has to be put together. It's not like it's starting from scratch. It's not a start from scratch plot plan. It's not. But the concrete pad, we need something in writing saying that it's set.
[1:55:52] Speaker F (unidentified): Set guaranteed that it's going to be done at a certain time, yeah, well.
[1:55:59] Speaker B (unidentified): The sampling and the contractor and the pad right for the concrete pad. We can't have sampling, you know, in writing. A lab is going to come out and sample on June 1, but I neglected to talk to Mr. Brulott and he's not going to be able to pencil me in until October 31st. I mean, we need writing stating things are going to fall into place.
[1:56:28] Speaker A (unidentified): This is going to be set up by the deadlines.
[1:56:32] Stan Hackett: We do have it in writing where Sean has committed to have the pad done. However, the engineer has designed it or the requirements of it by June 30th of 2020.
[1:56:44] Speaker A (unidentified): But I want it from the engineer. I want it from...
[1:56:47] Stan Hackett: The engineer needs to get us the design standards and expectations. Yes.
[1:56:53] Speaker F (unidentified): And what happens if we just let it slide and it got to June and then he didn't have it done and then the state said I will give you another six months or we'll give you another year, we'll give you this, we'll give you that, which has been going on since.
[1:57:08] Sean Gerard: You guys shouldn't even be involved in the concrete. That was something we had between us and D&D.
[1:57:13] Speaker A (unidentified): But it became part of the agreement and therefore it's part of it.
[1:57:16] Stan Hackett: So whatever is agreed on at this point, the board agrees, whatever the dates are, when you make your decision, it is all recorded. I will transcribe it or download it as it is recorded, and the findings of fact and conclusion of law and the conditions of approval will be written just as you see them there. If these deadlines are met then he's gets a notice of violation and then he has 30 days to appeal if it's an appealable violation and if it doesn't mitigate or rectify the violation then the board has to by statute have another public hearing for any potential discipline, action, or up to revocation or revocation of licenses. So, again, Sean doesn't want to go that far. It isn't a matter of it anymore. It was just, again, a lot of bad habits in the previous ways we did it, and now we're going to do it the right way. That notice the decision, conclusion along findings of that with the conditions of approval of a binding thing that can uphold in court. So that's why we're doing it that way now.
[1:58:46] Speaker F (unidentified): So if he's not done, if he's not done by the end of December, 45 days, then that means he's done. Do we still, we have to have a public hearing after that? We have to keep continue it going?
[1:59:20] Stan Hackett: I mean I
[1:59:26] Speaker A (unidentified): could live with I could live with extending it to December 31st provided we get the required information by that by that time I mean it's
[1:59:41] Sean Gerard: When will we have the next hearing if you extend it to December 31st? When is the hearing going to be signed, the first of January, or that's, that's the question I have. I mean, I would like, if you're going to extend it, extend it to the next meeting, first meeting in January. I know you want 45 days.
[1:59:58] Selectman (Chair): But why don't we extend it so that it goes right? What's 45 days from right now, the 31st, the
[2:00:06] Speaker F (unidentified): 31st, when
[2:00:09] Sean Gerard: yes, on the 31st it's going to expire, and then you're going to have a meeting in what
[2:00:16] Selectman (Chair): what's the first meeting in January? I can get into what's the, what is wrong with setting this up and saying we're going to have another hearing on the 31st of December, and all this material has
[2:00:29] Speaker A (unidentified): to be, because that's a Thursday, and the budget committee is going to be crunching, Jesus Christ
[2:00:34] Selectman (Chair): I'm not even thinking about holidays, pardon me, so the, but
[2:00:46] Speaker F (unidentified): I said I'm gonna be here
[2:00:51] Speaker A (unidentified): yeah, so what if we did, what if we did the fourth, are
[2:01:04] Selectman (Chair): you going to be available? So do we want to set a hearing for that date? It's a Monday. Yes. Does it have to be another, a public hearing, or can it be just be another public hearing like we have tonight, and all of this material, including what was asked for, and this has to be here by that night, if not it's over
[2:01:38] Speaker F (unidentified): okay, and that includes the engineering, everything guaranteed that they're going to do it the time
[2:01:44] Sean Gerard: I can't give you the engineering because we have to go back and they're still going to be working
[2:01:48] Speaker A (unidentified): on that. Right, but confirmation, from the engineer that they can get it done.
[2:01:54] Sean Gerard: They're going to work on site, not the blueprint. They're going to be working on site.
[2:01:57] Speaker A (unidentified): Right, but we want confirmation that they will be able to complete it by the deadline of June 30th.
[2:02:06] Sean Gerard: I want a letter from Stillwater stating that they'll be working with us on site
[2:02:09] Speaker A (unidentified): and that we can finish by June 30th of 27.
[2:02:16] Selectman (Chair): I don't feel we need that because if we're setting a date, this has to be done, I could
[2:02:23] Speaker A (unidentified): care less. Well, he can't get the concrete pad in by December 31st.
[2:02:26] Speaker F (unidentified): No, but we need to put it in there and it needs to be in writing and we need to make
[2:02:31] Speaker B (unidentified): sure that he gets the confirmation from the engineer, confirmation from the lab that the soil will be tested by June 31st. [Speaker A (unidentified): By June 30th.] By June 30th, brother. That these professional people on their letterhead will give you and us a commitment date.
[2:02:55] Speaker A (unidentified): For completion.
[2:02:58] Selectman (Chair): What are we doing with these plans?
[2:03:00] Speaker A (unidentified): That has to be done before the 31st. That has to be done by the 31st of December.
[2:03:08] Selectman (Chair): But we're sitting June 4th.
[2:03:11] Speaker A (unidentified): Yeah, January 4th.
[2:03:14] Speaker B (unidentified): for Sean to present us the material.
[2:03:16] Sean Gerard: Site plan all has to be combined by January 4th. Right. Before January 4th's meeting. Yes.
[2:03:28] Stan Hackett: Meryl. Okay, what time is the public hearing? Six o'clock. Six o'clock, okay.
[2:03:36] Speaker G (unidentified): My request is that you get the material before that meeting on the 4th, so you have time to review it. And the entire packet of all this material has been distributed to all interested parties or available to all interested parties because tonight part of the problems are that you were looking at this last minute. It was only provided to the code enforcement officers today with the details of some locations of operations but. It wasn't just today. No, the operations were put on there today. But isn't it fair to have it to stand by the 31st? Isn't it fair that you guys have your material at the end of December and gives you a four or five six days to look at it? Yeah. So have it to stand no later than
[2:04:28] Speaker A (unidentified): close of business on December 31st. That gives you the 45 days to get your material together
[2:04:35] Speaker B (unidentified): for us to review it and then five days off from there we'll have that public have that public hearing and work together.
[2:04:46] Stan Hackett: Agreed. Yes, Stan. Awesome. So clarify the motion. You're asking for the plan to be completed by December 31st along with a still water engineering regarding that be completed along the road of
[2:05:14] Selectman (Chair): 2027. Make sure you guys close the public hearing
[2:05:19] Speaker B (unidentified): so you can vote on that well I mean
[2:05:29] Speaker A (unidentified): DEP has already given the has given the extension they're not going to be able to do it in the winter in the middle of winter so they're going to have to get it scheduled but if we can get a commitment from the engineer that it will be done once that time comes it's not done game over
[2:05:57] Stan Hackett: On January, your final decision, one of the conditions of approval should be approved will be that the pad and the soil testing will be completed by the conditions of approval on January 4th. If it's approved, will be that all of the pad and any testing of the soils will be completed by June 30th.
[2:06:28] Speaker A (unidentified): 2027. Yes. 2026. Fully completed. Completed to commission is the best way to put it.
[2:06:36] Stan Hackett: So he can't use it until it's completed.
[2:06:40] Speaker A (unidentified): Yes. He
[2:06:50] Selectman (Chair): can't well as it is right now he's going to be able to use the pad that he's got until that time. Is that what you're saying? Yes. Until that time
[2:07:05] Stan Hackett: The other thing, the reason, another reason to consider June 30th is when Shawn is in the process of replacing and testing this soil, the area is going to be restricted from his normal everyday business. So he needs to plan a little bit around that and be able to still operate at some minimal efficiency. So that gives the town a commitment date that's part of a conditional use, which is in writing, and it's binding. And it will also allow Sean to get with his people and communicate to make sure that he doesn't completely stall his business or create another issue with his business.
[2:07:51] Speaker A (unidentified): So December 31st, oh, sorry.
[2:07:53] Selectman (Chair): In that time frame that you're talking on that pad, he's basically not going to be able to use, once he takes that other one out, he's not going to be able to use that pad for a month, not while
[2:08:05] Stan Hackett: it's under construction, it's not well and surely well, and that's going to be part of your engineer's report, what's the time frame to commission, but it has to be installed and completed by June 30th. So if he plans on using it July 1st, then whatever the carrying time is or the setting up time, it will have to be done prior to that. But June 30th is the deadline to commission, which means to be able to be used.
[2:08:40] Selectman (Chair): Basically anything, I'll say, after, from Easter on, things
[2:08:47] Stan Hackett: are going to be moving. That allows Sean and the engineers to plan accordingly. As long as they commit and they get it done by June 30th, however they do it is their issue, not the town's. Yep. Yep.
[2:09:07] Speaker A (unidentified): So plot plan with all of the required information no later than December 31st. And then the testing and confirmation by the 31st, by the engineers for the soil testing pad completion and pad actual pad completion to commission no later than June 30th. You want to close out the meeting and we can vote on that? Close out the hearing and then we can vote? So 804. I would make a motion that we grant an extension on the conditional use permit pending.
[2:10:24] Sean Gerard: Do you want a cycle license?
[2:10:26] Speaker A (unidentified): That's what I mean, not the, yes, there is. [Speaker B (unidentified): Long day.] On the recycling permit. Until December 31st, or should we do January 4th? January 4th. Until January 4th, 2027, pending all of the items in the previous conditional use, the conditions, we need to have the confirmation. No. Oh it's a long night. I did say conditional use. Somebody else has to do this because my brain has turned mush at this point.
[2:11:19] Stan Hackett: You want a completed plan by December 31st to allow all the conditions and along with all of the conditions that are existing as well as a written commitment from the engineers that the prep pad, or the pad that's used for processing, is completed to commissionable by June 30th of 2020. Yes.
[2:11:54] Speaker A (unidentified): What's the answer? So moved. Does that count? That's long-winded. Okay, hang on.
[2:12:12] Selectman (Chair): Okay, I'll make it. Okay, thank you. I'll make a motion that all drawings, all conditions of approval as stated in the June 23rd, 2026 approval and the notice of decision have to be met by December 31st. And we will hold a public hearing January 4th to determine whether or not there will be a renewal in the concrete well.
[2:13:10] Speaker B (unidentified): I'd like to amend that to cover the engineers' and labs' written agreement to facilitate to rehabilitate the concrete pad by June 30th. Second. All in favor? You
[2:13:40] Speaker A (unidentified): all set? Set. Sure. Motion to adjourn? Second.
[2:13:53] Selectman (Chair): All in favor? Good night. Have a good night.
[2:13:57] Speaker A (unidentified): Stan, do you want to use your program to transcribe?