Harpswell Select Board Reviews Solar Feasibility and Next Steps

2026-10-22 · 38m · Source: Select Board Workshop with Energy Technology (10.22.26) (Town of Harpswell (YouTube))
Speakers labeled via automated voice-based diarization + AI name-matching against the city's official roster. Automated transcription can still mis-hear a name during fast speech (e.g. a rapid roll-call vote) -- clear near-misses are auto-corrected, but this is not manually verified line-by-line. Treat names as a strong best guess, not an official record. Home addresses that residents give are left out of this page.
[0:00] Speaker A (unidentified): Start off how he looks like he's ready to go so. [0:04] Howie Marshall: I'm Howie Marshall I'm the chair of the Energy and Technology Committee Jack Roland is another member of the committee and Jeff Wooten is a town resident who's done some work for us on the on the possibility of installing solar for the town's the town infrastructure use. I always worry I say the town's electricity that people are thinking we're gonna get 10,000 people's worth of electricity. Now this is the goal is to save the town the money of buying electricity from CMP. So the Jeff put together this feasibility report a while back, and it covers the you know, what the town could do to cover the town's electric bill. It's mostly this building, the recycling center street lights are a major portion of that and then a number of other smaller meters jeff i think has a revised spreadsheet on the on the projected cost we ran the ran his report by a couple of outside people jeff sparrow is an energy Consultant that the town has been using, and I spoke to some people at revision. They both said that they thought that the price that Jeff had estimated was low. The difference is in how much it's going to cost. It's not that they're saying, oh, God, you wouldn't want to do that. It's going to cost too much. It won't be worth it. it. It's just that it's not quite as good as Jeff's original report. The idea is to build a solar array that we would then get credits from CMP for it. The original report was to build it up on the covered landfill up here, which is a popular place to do that sort of thing it makes it more expensive to build it but it tends to be land that's not good for anything else and no one complains you're ruining my view so that makes it attractive and makes up for you know can make up for the fact that it costs somewhat more christy was a little concerned initially because she thought we were really rushing into this and the rush was more that there were incentives that we could get that could cover possibly half the cost of it but it has to be operating by December 31st 2027 and that was another thing that revision said that the permitting involved especially for a landfill with the through the DEP just made that seem really impossible to get that done by the end of next year so also [3:19] Speaker C (unidentified): I just want to say I think I agreed with the process piece that Jeff Sparrow laid out, that if the town wants to do a project it should issue an RFP, it should go through that whole process. And there was a sense that everybody wanted to move super quickly, and I just felt like we needed to have a thorough process and do our due diligence and exploring the issue. [3:41] Howie Marshall: I think we were on the same page on that. I think that this was not that Jeff was proposing to go call a contractor and start digging. This was a plan that showed that the town could save a lot of money over the years by doing this. The big advantage is we're currently signed up with a couple of solar farms. It was one. Jeff Sparrow reorganized that so that the different meters are being fed by two different solar farms. It's just the way all the complicated details work that turned out to be better. Those get us a discount off of the CMP price, 15% or so. But as the CMP price goes up, those solar farms just get to collect more money from us per kilowatt. So, you know, the advantage of owning the system is that as the price goes up, it just shortens the payback period because, you know, we're just generating our own power and shipping it off to CMP and getting it back from them. But basically, we own the power that it generates, and that then saves the town money. money. The difference in how much it's going to cost makes the difference between does it take eight years or 10 years or 15 years to recoup the price of it. But it's good for 25, 30, 40 years. And Jeff pointed out to me a little while ago, if you get to 25 years, maybe some of the panels are bad. You replace those panels and you keep going. So the ongoing insurance and maintenance on it is not very much, you know, so but we should get [5:37] Speaker D (unidentified): going on it because we have them. Okay, sorry that we this last meeting took long, that's all right, I'm done. But we've got 35 minutes to go to do this, okay. [5:46] Howie Marshall: So let's let's let Jeff give us a quick description of what he thinks we [5:50] Jeff Sparrow: need to do. Thank you all, just as a quick background, I got into the solar industry in 1975. So I've been around this industry for a fairly long time. I was on President Carter's Energy Advisory Board. I was on Governor Jerry Brown when he was dating Linda Ronsted at the time. [6:11] Speaker A (unidentified): That's it. I hated him for that. [6:15] Jeff Sparrow: Well, it turned out I worked with Ronsted's Hardware, so I talked to her brother to get to Jerry Brown, so I helped get the first tax cuts established in California. Very successful career in Massachusetts, which is becoming the solar capital of the United States because of the incentives that we started down there. It was really incredibly good. I was hoping Maine would continue doing the same thing up here, but I understand the Congress has sort of pinched it a bit. The key thing here is having been on the contracting side of the business, it was always better to own the system. So we as solar contractors always push solar power purchase agreements, which is basically what you have here in this town, where we're going to lease the land from you for practically pennies, but we're going to give you a 15% discount on electricity. And that's because we'll make our money back in six years. With the tax credits, the incentives, and the makers' depreciation, we could pay for that system in less than six years as a contractor. So anything after six years and you've got a 25-year contract somewhere, I think Harpswell Community School just signed a 25-year contract. That's 25 years of just getting a 15% discount. Now, electricity rates are rising rapidly now, and we all know why. The fuel costs are going up, pure and simple. Green Mountain Power just announced a 22% increase to their customers, and they're going nuts. You were going to say something, Dave? [7:46] Speaker D (unidentified): Oh, I'm just like 22%. Yeah. [7:48] Jeff Sparrow: So my forecast is I took 20 years of CMPs rates and found that they averaged 3.4% per year, which is pretty minor, but it still amounts to a fair amount of money increasing every year. So as we look at this report, I looked at enough power to power, enough for all the buildings and all the electricity it's used in Harpswell that does not count the new building that's going up, so what I would apply for here would be instead of a hundred and fifty kilowatt system is probably a 200 kilowatt system with CMP just to cover my bases. It would produce in this case 204 make what's what hours per year. Based on my economic analysis is gonna pay for itself in 8.8 years and after a 30-year return to the town of approximately $1.75 million. Why does this report matter now? One side of the land, rates are always rising. Anybody's electric bill ever gone down? Nah, didn't think so. Positive from year one, and how is that happening? Because we're basically locking in and we're starting to pay back the system. And we're locking in today's pricing. So as CMP's rates go up, their payback to the town also goes up. So if they're going up to $0.18, $0.19, $0.20 next year, we just keep getting those increases back. Why we should act now, rising volatile utility rates. I see the volatility lasting at least another year. When utility rates raise pricing, they very rarely apply to decreased pricing. They will on occasion to look good and face value, But right now, the grid requires so much infrastructure work that the grid itself is like train tracks right now. They need to be upgraded, and they haven't done that for quite some time. Last year, the solar industry installed 96% of all new power that was established in the United States. So solar is outpacing utility companies right and left. It's a financial return and it's a productive use of otherwise a useless asset is how we said. Energy independence, resiliency, and environmental leadership. One of the things I always like to do since we do have the school in town is to put up a display inside the school. It teaches the kids this is how solar energy works and they get to see it happening and they see how much is producing, etc. But it also teaches kids what solar energy is about. So it becomes a learning site for them also. Site was already built for solar. Now I had picked this originally, which everybody knows where this is. Why? Because it's plenty big enough. I need about an acre of land and that's it. When I went up to the transfer station last weekend, I think it was, I talked to Uncle Pete and he was pointing out the land that was just across the weigh station that's also part of the landfill. That Why is it nicer? Because it got closer to the three-phase power that's running down Mountain Road. So this can be oriented, again, right across the street or across where the office is. This was just the initial layout. It was a 30-degree tilt pointing directly due south. No trees at all, so we don't have to cut anything. It was just five-road panels. Now, these were 660-watt panels. We don't know what's going to be on sale next year, but we want to buy American made panels because we get an extra 10% return from the IRS. So just by using American made panels would get us another 10% discount. Core system specifications, I'm not going to go into the details in this, what I use, chint power inverters, etc. Balance of system wiring, course system class, this is how we came up with the pricing for the system. Basically the PV modules, the string inverters, the installed landfill racking is the most expensive part of this at about 70 cents a watt. DC electrical, the balancer system, which is what BOS stands for. Monitoring communications metering, this is what allows us to monitor the system and make sure it's working properly all the time. Site preparation and access. Mechanical installation labor, actually the cost of labor to install the system. Electrical installation labor, you have to have an electrician. Engineering design, landfill specific evaluations, so we have to get a civil engineer to actually look at the property and tell us what cap weight we can afford. But most of the cap weights are well within the bounds of putting ballasted systems, so they're ballasted concrete systems that hold the racking systems of which hold the panels. Permitting environmental compliance, utility interconnection. I had boosted that because I wasn't aware of what the costs were for CMP, what the utilities require. I balanced it based on Massachusetts, which was about 35 grand. Here it's going to be about two grand, so there's about a thirty thousand plus dollar savings already. Mobilization equipment management, and of course commissioning and testing and closeout. That brought the total price to about five hundred and thirty two. By the time we apply the 30% IRS and the 10%, the price should be somewhere around the 320. I forecast 350 000. Questions? I [13:58] Speaker A (unidentified): don't know enough about it to ask any questions, be honest with you. This is my third time sitting through this presentation. [14:05] Speaker D (unidentified): Oh well, let you ask questions then. Yeah, so what do you think of the two folks that howie has spoken with? I mean and the cost difference. Well if you look we're at about [14:20] Jeff Sparrow: $5.54, $4.84, $4.50, which is totally in reason. And the total cost being $5.32, but what they didn't take into account was the fact that there's a 30% and a 10% discount. [14:40] Speaker D (unidentified): And the rear landfill, the one up back, is further from the three-phase. Yes. So that's complication or extra cost? [14:48] Jeff Sparrow: It's an extra cost. Yeah. [14:51] Speaker D (unidentified): What else did I want to ask? I don't [14:57] Jeff Sparrow: Know. Keep going. Okay. How long a life this is going to have? I did a system in Beverly, Massachusetts, with the Beverly High School, 1983, still operational. So 25 and 30 years is a highly reasonable aspect for length of time of running. So it's it's just time just keeping the system [15:22] Howie Marshall: Producing solar. If I can just clarify one thing that Jeff said, and probably went right over everybody's head, and that is the question about the ballasted mounting, and that is because it's a capped landfill, you can't drive anything into it, can't dig any holes. So basically you make a big bunch of concrete on top of it and mount the stuff in that to just sit on top of it, and that's what he was talking about. The you have to get the loading factor of how much that's all gonna weigh, and it's got a Way enough that it doesn't blow away, but not too much that it hurts it. So that's and then that can make the construction more [15:58] Jeff Sparrow: Expensive than well, plus this cap landfill is more than 20 years capped. [16:03] Howie Marshall: Right, I believe so, a long time. That matters as to what I think it is, yeah. [16:10] Jeff Sparrow: Yeah, that's what I think I saw was 93. You know what, I question what's in that [16:14] Speaker D (unidentified): Landfill, because we for a long time, not much now, for a long time we didn't have market for tin cans, and we were crushing them up into cubes and just burying them up back, and I think that's mostly what's in there in cans. One is to say [16:28] Jeff Sparrow: It's settled significantly that when a civil engineer guy comes in, he's gonna say you can pack a truck on top. Now the option was, I know this came through, and I feel for residents because I did put a lot of systems on landfills around Mass, and by the way, I did go to town meetings, and a person came down and said, but I picnic there, that dump, to which I comment, so you can just leave your trash [16:59] Speaker D (unidentified): Behind now, picnic up there. 's so many ticks in that field. Take into [17:11] Speaker F (unidentified): Account like stormwater runoff and stuff from water, then when it rains hits the panels and runs off, like that's there's a lot more impervious surface up there, no, and solar panels. So I guess what happens to the soil underneath it of it being a landfill, is there any concern? No, none whatsoever. Well, it's an [17:33] Jeff Sparrow: Impermeable cap that's on that. First of all, it's a hill, it's a hill already to begin with, and they've already got rain coming down on it. So and one panel, because there are gaps between panels, so you're only gonna get one panel size of rained onto one spot. [17:48] Speaker F (unidentified): So you're not worried about erosion underneath that one panel. Right. [17:52] Speaker A (unidentified): What happens to the panels when they've outlived their life? How are they recycled? Good idea. [17:58] Jeff Sparrow: Most of them right now are getting sold off to people who can't afford them much because they still operate. So right now they're getting reused. [18:08] Speaker A (unidentified): That didn't really answer my question. That's what I'm saying. [18:11] Jeff Sparrow: They don't go anywhere. They just keep reselling them. Well, eventually [18:16] Speaker F (unidentified): like it's got to stop working. What happens then? What happens then is that [18:22] Jeff Sparrow: quite frequently we've requested contractors to put in costs for decommissioning a system, so at the end of the life of the system they've already put the money in to come in and take it out. Do they recycle them? I don't know. I know it's been a big question. I just, I'm more concerned about batteries. I'm more concerned about batteries being recycled right now. [18:48] Speaker F (unidentified): Does this require battery storage in order for the battery storage bank in order for us to be able to store the power when we're not using it? No, we're using the grid. [18:59] Speaker G (unidentified): Just feed it into the grid. Yes. Yeah, explaining how it works, I think, is helpful. It's, I can, it's a, you send it all to the grid and then we use it back and then we have to use it all within a year. [19:16] Howie Marshall: I think it's pretty much the same for a commercial setup. We qualify as a commercial customer. But basically, to generate the power, you use some of it locally, although it could just be that all of it is just dumped into the grid through a meter. They measure how much energy we put out. We have meters that meter the streetlights and the buildings and everything, and you get to use the credits from what's been sent out onto the grid against the usage. Yes, there's a, at least on residential arrangements, there's a 12-month expiration on that, although I did find out recently that it doesn't just go to CMP, it actually goes into some low-income heating plan or something. But typically what you do is, you know, the size, the size of the system, what you want to do is size it so that you don't generate extra. You generate a lot during the summer and not very much during the winter, and then you, but you get to use those credits that you generated in July and August, in November and January and the like. I think that answers your question. [20:45] Speaker D (unidentified): So we could put in a battery system, but it would be a lot more expensive. So we'd totally be off the grid. [20:50] Howie Marshall: So you could. You could do that. [20:53] Jeff Sparrow: But you're talking a four or eight-hour storage system. Yeah. Not days. Right. [21:00] Howie Marshall: Right. But now, you know, over the course of the year, you end up, like, on my house, I've got solar panels. And in the, you know, in July and August, we're just cranking out electricity onto the grid. And then it gets to end of December, beginning of January, we've run out of credits. We pay an electric bill in January, February. Then they start generating just enough to cover our bill. And then during the summer, we build up the credits again. again. And we're not using a battery at all. I talked to them when I put in that system and they said, right now, because you get credit for everything you put out under the grid, might as well just do that and not spend the money on the batteries. They said in 15 years, we're going to have our agreement on the solar panels is for 15 years. And when that time is up, we're going to have to renegotiate. And there's all sorts of talk about not giving you one for one reimbursement. You put one kilowatt hour out, you get half a kilowatt hour of credit or something like that. They said in that case, you get a battery during the night, you run off your batteries, you know, and by 15 years the batteries will be better. I went and saw Newcastle has a fire station where they covered the roof with solar panels and they put 24 batteries that are about this big, four stacks of six, down in the basement. This is the building can run for three or four days on those batteries. So if the power goes out from a storm and they're not using the, so there's not enough Sun to get a lot of power out of the solar panels, they can run off those batteries. But the [22:43] Speaker D (unidentified): problem with batteries is though, it would only cover the buildings on this campus. That's great, the meeting house, middle field, right, all of the other [22:51] Howie Marshall: the town-owned property, right, that's the stuff that goes out onto the grid. The credits are used to pay for those meters. I mean, another thing to consider is, do we want to incorporate this into the emergency services building as an alternative, you know, is, you know, and include a battery plan on that, like the Newcastle fire station, which they're using as a warming center. If they lose power, they've got a place that's got lights and power. That would be another thing to consider, is something like that. Having the solar panels closer down here might mean that it could directly power the recycling center in this building, where if it's up at the landfill, you're going to have to run it through a transformer up to street voltage, which is 15,000 or 19,000 volts, down here and then back through a transformer, essentially feed it onto the grid and just pull the power in off the grid. And so, you know, you wouldn't be able to do a warming center kind of thing off of that. The systems that have batteries in them have fancier inverters that take the DC power from the panels and create the 240 volts or 19,000 volts or whatever. They're fancier because they can operate without any connection to the grid. They can charge the batteries, you run off the batteries and so on. It's, it's a more complex system. But again, you know, you get what you pay for. You could have, you could have something where you could power the building when the power was out. I'm on my house, I have the basic type of inverter that the only thing you can do is create 240 volts, and whatever's extra beyond what my lights and refrigerator are using goes out onto the grid, and if the grid isn't there it just shuts off, because it'll just blow up if you don't have someplace to dump that other 8,000 [24:47] Jeff Sparrow: watts. So the way I would do this, if you want to consider that building, it's still added to this system, the solar, and you can put batteries into that building at any time you want to, and you can basically charge your batteries from the grid, so instead of a backup generator. Yeah, I [25:13] Speaker F (unidentified): guess the only other question I have is you have far more knowledge than I could ever dream to have on this. [25:23] Jeff Sparrow: You know more about Love Stream than I do. [25:26] Speaker F (unidentified): I'll try to stay in my lane. What, I guess, are your thoughts on what our energy consultant said on how much more expensive he thought this was going to be to build versus what you've projected out? Because I'm hearing from two people that both know more than I do saying two different things. [25:48] Jeff Sparrow: We're all in the same ballpark. They're just not counting the 40%. [25:51] Speaker F (unidentified): And then with that 30% where we would have to complete construction by December 2027, right? [25:59] Jeff Sparrow: Complete. The construction part of this project isn't the issue. Right, it's the permitting. It could be done in three to four months at the most. Right, it's the permitting. It's the permitting. And primarily it's the DEP and interconnection, which I propose starting [26:12] Speaker F (unidentified): To work on it now, but then I mean I think you know even if we wanted to do this, we do it correctly, you'd have to send it out as an RFP, which also elongates the process and get it approved to town meeting, right, which us into March. Yeah, and then year, I mean that's that's why that seems like that's not it's not feasible really, I don't, right now, because even if we, if we didn't submit an RFP and we just decided a sole source, we'd still have to get a vote. [26:41] Speaker C (unidentified): Yeah. And the thing is, do you really have enough information to go forward and ask the voters for, I think your figure's 385,000. Did I see that up there? Yeah, somewhere around there. So, I mean, there seems to be a lot of questions about, is that estimate low? I know you're talking about the percentage differential, but we really- [27:00] Speaker F (unidentified): What happens when they allot 380,000 and then we don't get the permitting in time and all of a sudden, we lose that 30%. [27:06] Speaker C (unidentified): Do you have enough information to ask for that amount of money? I don't know. Margaret's been working with the Island Institute and potentially bringing in somebody with energy expertise. Do you want to talk a little bit about how they evaluate the town and what benefits we might get from that in terms of being able to make well-informed decisions? [27:28] Speaker G (unidentified): we're working on what's called an e tip energy technology energy technology innovation partnership project so we were approached by the island Institute to apply for this federal program where they basically do a deep dive into our community it takes four to eight months so it would be done by the end of 2027 ideally and it would give us kind of it would it 's like a sustainability plan or a resiliency plan for energy but it looks at distribution and access and works gives us a better working relationship with the utility. I think it would cover resiliency projects like you know solar or whatever we were interested in, but that's something that we're looking for next year and the end of that, the end product would be kind of like a list, kind of like the comp plan is for land use, but it would be this list that we could kind of pick our topics that we would want to take a deeper dive on in future years, and like an energy resiliency kind of work plan. [28:42] Speaker D (unidentified): You know, covering a grant that covers 50% of our cost is very attractive. I would like to know the possibility of that grant continuing beyond the end of 2027. I'd like to know, I know maybe no one has that answer. I don't know. Can I jump in as public? Please do, yeah. [29:02] Speaker H (unidentified): I just wanted to chime in and say, let's say, like, let's not get hung up on, like, is it going to be free after eight years or 15 years? It is going to pay for itself, for sure. We're already paying an electrical bill. We're just gonna switch to paying this stuff and, like, I don't know. Yeah, it's real money, but we should have done this 15 years ago. It would already be paid off. Let's do it today so it can be paid off in 15 years. Let's get the ball rolling and not study this to death and not move. And maybe we'll lose another 10%, whatever. Yeah, the panels don't really go. Yeah, it's just we're already paying the electrical bill. We're just going to switch over to what we're spending that money on. Instead of just throwing it away. We're gonna own a thing at the end. It seems like a no-brainer to me. I just wanted to chime in with that. Thanks. [29:57] Speaker D (unidentified): Good point. [30:01] Speaker A (unidentified): Anybody else? David? Matt? [30:06] Speaker D (unidentified): I don't know. Next steps going forward would be going up for an RFP, I would think. [30:17] Speaker F (unidentified): Who, I think next steps would be asking the public if this is something that [30:24] Speaker D (unidentified): Well, that's the thing. We need public buy-in. An RFP would give us the costs, the probabilities, all of that things to bring to the public. [30:32] Speaker A (unidentified): I'm trying to think if the public would go along with it. Right. [30:38] Speaker F (unidentified): And I know it was Mitchell Field, and that was much different. That's a much different place. This is far more feasible and appealing than putting them at Mitchell Field. I think we all agree with that. [30:48] Speaker A (unidentified): No, it's a good spot for them. Yeah. [30:50] Jeff Sparrow: Yeah, it's this RFP is for the [30:55] Speaker D (unidentified): civil engineering? No, the RFP for the project [30:58] Jeff Sparrow: to do this, but so we have to go through town meeting first, right? No, you would [31:04] Speaker D (unidentified): find, you would get all the answers, get it, you would get at someone who would do this for a certain amount of money, a contractor, and then you would take this to town meeting and say, do we want to go forward with it? Right, that we'd have to [31:16] Speaker C (unidentified): budget for the consultant, right, for the RFP. Yeah, we don't have the expertise to put a RFP [31:24] Speaker G (unidentified): together for, no, the art, the person that we hired through the RFP to like do this feasibility [31:31] Speaker D (unidentified): study, I think is what you're saying. No, I think he's not saying the feasibility study has been done, but we would go for an RFP to get some proposals for doing this and how, what would it cost, how long is it going to take, blah, take that to town meeting. So you're [31:49] Speaker C (unidentified): talking about an RFP construction, a proposal could validate these prices that are being proposed. [31:55] Speaker D (unidentified): Yes, and that doesn't cost anything in RFP. Nope. No, but people are going to lay their cards on [32:03] Speaker C (unidentified): The table unless they know kind of specifically what we're asking for exactly, and that we would be willing to move forward with a subject to a town meeting approval, because companies are going to have to lay out information and figures. Well, this is what we're asking for, and it costs them [32:18] Speaker G (unidentified): money right now, because our us money, we haven't validated that, right? That's my issue too, the RFP [32:25] Speaker F (unidentified): would validate that but i see what i agree with what christy and margaret are saying that a company's not going to spend money to submit to our rfp without the guarantee that they even have a chance of getting it say they spend even a couple thousand dollars to submit an rfp we accept that as a board bring it to the voters and then the voters voted down like we've just right i'm i'm going to say we've cut our face off the spider nose going forward too you know because then we put a bad taste in any developer's mouth. I mean, normally we could say subject to, you know, [33:00] Speaker D (unidentified): town meeting, normally the funding. I understand that normally we do it the other way around. We develop the funds, and then we go out for a proposal to get it done. And I don't know if that's the way to do it. I don't know. [33:14] Speaker C (unidentified): But how much would you ask the voter for right now based on this one feasibility? [33:19] Speaker D (unidentified): I would ask the voters for the funds that the proposal has asked for. [33:26] Speaker C (unidentified): So $400,000, $380,000? [33:28] Speaker F (unidentified): I think you'd have to ask them for without that 30% discount, whatever they gave on the high side, and hope it came in low. Yeah, 532. It's easier to ask, I'll figure it out in my very short tenure here. It's easier to ask for more and return some of it than to come back and ask a second time. You better not, long enough, and it would probably be a bond [33:52] Speaker C (unidentified): so you know, you've just got to be able, if you want to go that route, you got to be able to [33:56] Jeff Sparrow: support my suggestion. I don't know which way you think you can go about this. Again, doing an RFP, you can have an RFP ready and issue it right after the town meeting, expect results back in two weeks, to get to work within a month, you would have finished by the end of 2027. But beforehand, now that's what I'm saying, it's the end of October to get a civil engineer to do a DEP study, basically it's called an environmental study assessment, ESA, on the dump, but we don't [34:37] Speaker D (unidentified): have the funds for that. We don't have, without going to town meeting and getting the money to do that. [34:43] Speaker A (unidentified): DAVID BURRAGE- We have to wrap this up. DAVID BURRAGE- We, Mary Ann, might have. [34:45] Speaker C (unidentified): MARY ANN BORGESON- Do you have a figure for that, Jeff? [34:47] Speaker A (unidentified): DAVID BURRAGE- We can wrap this up. DAVID BURRAGE- About $18,000. [34:49] Speaker C (unidentified): MARY ANN BORGESON- Oh, yeah, we do. DAVID BURRAGE- $100,000 or $18,000? MARY ANN BORGESON- We're running out of time. MARY ANN BORGESON- I don't know if you heard that. DAVID BURRAGE- Jeff is suggesting that would probably be an $18,000 civil engineering study. [35:01] Speaker F (unidentified): DAVID BURRAGE- There we go. DAVID BURRAGE- Mary Ann might have something to add. [35:03] Speaker I (unidentified): I just want, because I'm on the Resiliency Committee, we have the SPHERA fund that we could go for right now if it's not too much. [35:15] Speaker C (unidentified): That's a question for... [35:17] Speaker I (unidentified): So anyhow, and that's what we're just working on the new budget, but right now what we have in there, we could push out to get this done. [35:26] Speaker D (unidentified): I think the R&S and the E&T Committee need to speak to each other. [35:30] Howie Marshall: We do. We do. We've been having joint meetings. [35:33] Speaker D (unidentified): I think you need to speak to each other more and hone this a little bit. [35:38] Speaker C (unidentified): And is that for both of the landfill areas? When you're talking about exploring, having a civil engineer explore that, are you talking about both landfills? [35:47] Jeff Sparrow: I would like to go back and look at that other area where I really liked, right across from the weigh station. [35:54] Speaker D (unidentified): Do you think that one's big enough? I don't think it's as large. You do? [35:57] Jeff Sparrow: Okay. If it's an acre, which I'm pretty sure it is. It's a lot smaller. It's a lot smaller. But I only need about an acre of land. And it faces south. And it faces south, yeah. It's up on the hill. [36:09] Speaker A (unidentified): I remember when they took the stumps out of there. Beautiful soil. [36:12] Speaker C (unidentified): So that's a potential funding source, what Mary Ann raised, for the civil engineering if the board is available. [36:19] Jeff Sparrow: And the other thing is to submit your interconnection to C&P immediately. [36:27] Speaker C (unidentified): Is there a cost associated with that? [36:30] Jeff Sparrow: Probably about $2,000. [36:32] Speaker G (unidentified): Would we be able to use our solar consultant to help us develop to help us develop these ideas [36:42] Speaker C (unidentified): better? Is that something that you know I was our solar consultant who recommended the RFP approach, so I mean we could ask him what he thinks about you know investing 20,000 and exploring [36:54] Speaker F (unidentified): right? Because I mean that's my only fear is to invest that money and then it does get the town bow and for some reason the town votes it down, we've just [37:04] Speaker I (unidentified): wasted $20,000. We didn't waste it. We did upfront checking first to make sure we were giving them a good idea what it was going to cost. Another thing I would just mention, it would be great if you could get that on your next town. That's what [37:22] Speaker A (unidentified): I'm going to recommend that we bring it up. Put it on the agenda in two weeks. [37:26] Speaker C (unidentified): Time to look at it. And your committees will have met and discussed it. [37:30] Speaker I (unidentified): So we're going to meet on the 5th? Yeah. [37:33] Howie Marshall: 6th? No. Well, no, the 5th, I think, is two weeks from now. [37:36] Speaker I (unidentified): Is that right? But we're going to meet next week. [37:39] Howie Marshall: Next week on the 27th. [37:40] Speaker I (unidentified): And the committee has to vote on us doing this. We can do it if we work together really quickly, I think, so that you can get it to them. [37:50] Speaker A (unidentified): If not, then we'll kick it down. A month then. Of course. Yeah. Either two weeks or four weeks. One or the other. Yeah. In the meantime, I've got to put an end to this. He has to. No. We have to reset out. We can have the meeting in five minutes. [38:06] Speaker D (unidentified): We've got to change our brains around. [38:07] Jeff Sparrow: The chances of the town people not approving this. Thank you for coming.