← Back to MaineScanner

Castine Planning Board defers site plan amid boundary dispute, pond questions

2026-10-21 · 1h 7m · Source: Town of Castine Planning Board 10/21/2026 (Town of Castine (YouTube))
Speaker identification was not available for this meeting (plain auto-generated captions only) -- this transcript is not broken out by speaker. Home addresses that residents give are left out of this page.
[1:59] Mhm. [3:54] Mhm. [11:34] Yeah. [13:10] But, you know, filling in a an old pond, probably not. You know. [13:18] So, if we do an approval, again we would have to it would be dependent on being paid first. [13:25] Completely dependent on the EPA. But we can approve the one grade at the end and put the pond where it is in a second. So, it would be 250. [13:36] I'm like, where is that kind of property? [13:38] What's that? We can We can approve the grade up by this house. [13:44] [laughter] [13:46] Has the world gone mad? [13:47] That's how That's how they do it in YouTube. What is where I'm like [13:51] All right, I heard him. anyway, Yeah, so DEP, I'm trying to arrange a site visit for DEP to come down with their shoreland zoning specialist and our regional land use rep to come down and take a look at this. cuz frankly, I don't know what we're going to do there other than [14:15] we can't allow it until DEP says it's okay. [14:18] Yeah. [14:19] But I'm not The question I have is we can approve the upper one. [14:22] The upper one? Absolutely. That's outside of the 250. [14:25] Yeah. [14:26] that could be that could be anywhere in town. [14:30] Mhm. [14:30] there are no There are no state restrictions on that. So, it's really just if you guys are comfortable with the grade change there, then you can do [clears throat] that and you could actually approve the pond contin- contingent upon DEP yeah, that thing is probably only [14:51] 3 and 1/2 ft deep at its deepest spot. it probably used to be deeper, but the flow going down that hill has deposited sediment in the bottom of that pond over the however long it's been there. I don't know. but it's been there a long time. [15:08] Sean, when they push when they do the thing behind the house [15:12] going down to the lower level, the two going into the 250 area, what kind of drop is that? Or is that going to be a [15:21] About 48 in. Just 48 in top? No. [15:24] Okay. So, it's probably going to be steps in there to go down to the lower part. [15:29] Yeah, probably. [15:33] Chris, got anything? [15:35] no, I'm just trying to figure out cuz when I look at this, of course, there's this table which seems to be operating in and of itself again. So, there's dredging and filling operations which this planning board would have asked search for filling, I find no actual substance of information in the ordinance whatsoever. [15:55] and then earth moving which I guess this would have qualified other than it qualified certainly and maybe both of them. And it's got, you know, less than 60 cubic yards, greater than 60 cubic yards but less than 120 cubic yards, and then more than 120 cubic yards. [16:12] I'm sure both of these probably fall well under [16:14] Yeah, granted so you're probably talking about 1,500 cubic yards [16:18] Yeah. [16:18] of earth moving. [16:22] And that says planning board again, but of course there's really no [16:26] We only get involved with anything over 120. [16:29] Yeah, but there's no like substance of information other than if it were incidental to it does have one incidental to the construction which is then if it's a site plan approval then you can do it all times. [16:44] Yeah, if this if this was them digging out a foundation and doing 500 cubic yards to dig out that foundation, you guys wouldn't see this because it's incidental to the construction. But because it's landscaping and they're changing the grade by as much as they are, that's why it comes to the planning board. [17:04] And the only other thing it says and again, this is not a direct thing, it says something about altering the surface or subsurface surface drainage patterns. And I'm not sure that at the one next to the house would be [17:17] Well, and if you look at the only grade change which is the close is just is right here. Most of it is all in the same [17:28] Yeah. [17:28] in the same grade. So [17:31] And there's no It's not like there's a house 150 ft away that would 500 ft away that would still be affected by it. [17:37] And the the down the downhill pond is basically the catcher's mitt. So you're not changing any sort of drainage patterns there because that's where all the water ends up. [17:49] Yeah. [17:52] And that does not look like it's If it's only you said 3 ft it doesn't look like it would change [17:58] drainage [17:59] drainage very much. [18:00] Yeah, other than it would not collect there anymore, but it's going to drain to the basin. [18:03] It is so overgrown in there that I walked around the periphery, but I was not going to dive in and go go jumping through the bomb up as we used to say in the business to get into the middle of that thing. [18:19] I mean what constitutes a wetland in terms of [18:25] Three things. Three things. Water, proper soil types, and proper vegetation. [18:33] So it's largely subjective from my perspective because I am not I can recognize okay, there's skunk cabbage there, 's there's cedar trees there. Okay, it's probably a wetland. Alders are a a sign that it's probably a wetland. I'm not qualified to test the soil or you know, figure out that portion of it. [18:59] Man-made impoundments generally wouldn't count unless they are naturalized. And that's a ruling that only the D Beacon did that they become a wetland. And if it was less than a quarter of an acre, you are with Yeah, but it's more than a quarter of an acre. [19:22] How large is this piece of property? [19:24] That, the property is [19:29] 40 acres, I believe. [19:31] Is it Yeah, I'm looking at this phone. [19:36] It's got other buildings on it. [19:38] Yeah, this is only one bit of a much larger project for this and for this property. Right now though, the [19:51] the property owner has applied for and received a building permit for me to basically do a massive renovation of the house. Okay? But it's all internal. Okay? The road they are also going to reconstitute a road that went up, which is going to be roughly 500 to 700 cubic of earth moving. [20:12] But roads are my purview. You guys didn't see that ease. Road earth driveways. Driveways are our CEO purview. that's what's going on there right now. But then they came in and said, "Hey, we'd like to fill in this pond and we'd like to do this earth moving." Really what they're doing is they want to find someplace else to put the moving earth that they're moving around in the driveway construction. [20:39] Okay? And so they said, "Hey, this would be a great idea. Let's just flatten this space off behind the house." But then that's it not incidental anymore. [20:49] No. And originally that pond was just dug out. It didn't It wasn't lined to make it retain, you know, [20:56] I have no earthly idea if any [20:59] or something. [21:00] Maybe it was 100 years ago. [21:02] That would preclude some wetland. I mean, that would make it harder for it to become a wetland. [21:09] But all over the time that thing has been there, too, you've had enough sediment run down that hill that whatever was there is now been filled in. And I mean, the trees are only about 15 ft tall. So, it's not like it's really fertile soil. [21:31] but I again, I went out and measured it and I said, "Okay, there's no way I can touch this without one, land owner view, and two, it'd be biggest in the world and all that." [21:45] Was there any water in there then? Visible? [21:49] The workers out there had they tromped through it and they did not come out wet. So. [22:00] Yeah, exactly. [22:02] But I couldn't see them after they went in by about 4 ft. So, I saw them on the other side. [22:07] [laughter] [22:09] It's really more of a depression than a pond. [22:11] It really is now. [22:17] But again, if DEP rules it's a naturalized coastal wetland. [22:24] Now, if they wanted to dig that out and have a continuous pond. [22:33] They could have maintained it however long before it started filling in. But once it's went wild [22:42] that's where you get into you know, state statutes on shoreland zoning. There's supposed to be a robust and I'm not I'm not I'm paraphrasing here. Robust standard trees in the first 75 ft coming off the high water mark. and if you can't clear cut. [23:05] So, in order to do this, they'd have to clear cut. And then if you can clear cut with an approved replanting plan. But, if this is designated as a wetland by DEP then [23:19] they can selectively cut over the course of time and replant, but I don't know. I'm sure there's a way that we can get this done for them. But, it To me, it's got to be DEP telling us what to do. [23:35] Not a responsibility that it Is the guest house have they been taken down? So, have they taken down? [23:42] I haven't been out there in a few two weeks. it had not been taken down yet. [23:51] But, it's Yeah. Right now, it's being used as the office for the construction company. And I believe they told me their timeline was probably 24 months total out there. So, I doubt if it'll be taken down anytime soon. [24:09] Is that where the last residents lived? [24:12] Who? [24:13] The last residents on that property. Did they live in the in the guest house or I think I think they will not live in the big [24:22] Did they have the auction with the auction? [24:24] They had the auction, yeah. I think when they came to visit, they used both I don't know how often they I've only spoken to the previous owners once or twice. [24:39] Well, the builders are going to be out there for a couple years. I'll go visit them. They're my former students. [24:46] Are they? Nate and Julio are kids. Yeah, he's big time now. He does it He's not out there. He's got a project manager out there. His name is Derek. [24:59] So, is it if the pond and part of it is it next to or in the shoreline? Oh, that dotted Sorry. [25:07] That dotted line, exactly. [25:10] So, we would have to theoretically look at the shoreline. It might have something in there. [25:16] Yeah, that pond, I would say is probably the leading edge towards the water of that depression area is probably 9 ft off of the highway. [25:27] No. [25:29] Yeah, based on the lines in that thing, I would say yes, obviously, because it's saying there's potentially water coming at it from the bay. [25:43] I'm asking several questions on the pond because I'm going to become very nervous coming up. You're digging where you dig. You're digging lots. I'm going to show you. [25:55] Okay. [25:57] So, I'm just curious, that's why I asked you the question. [26:00] It's already there. Then Yeah. [26:06] Yeah, we're just trying to get the stuff, like you said, the slope is coming into it. [26:09] When did you put it in? [26:10] 35 years ago. [26:13] Now, we just got a text from the Cherries, and they haven't been letting them in the room. [26:18] I think [26:23] It looks like we can't let anybody [26:25] anybody in because Gabe's got another meeting going on downstairs, and so nobody is seeing this. [26:31] That was the thing that [26:31] Wait. Wait. Wait. Wait. Wait. Wait. Got them. [26:39] So, it's working now. [26:41] Well, I think that's what Derek said is it we actually opened it under a different [26:47] Yep. [26:52] Apparently, we got to look at our spell house. I don't know if it's going to show you. [27:04] I must have given them a miracle watch. [27:07] No. That is still Oh my god. [27:13] It's some project show. Some projects are like they do them structural issues. This looks we're going to be a lot of money. [27:21] No, I think it's [27:23] Did you go? [27:24] Okay. I am very well. I am [27:27] Okay. [27:28] I am good. [27:29] Have you been to this property? [27:30] I didn't go down to the auction. [27:32] Yeah. It's amazing. [27:36] Yeah, it's Eleanor Roosevelt, I guess used to visit there. [27:40] Yeah, she did. I think he must [27:42] Yeah. [27:44] There's some There's some [27:45] I don't know. [27:47] Great outbuildings, too. [27:48] Yeah. [27:52] barns I am trying to think. Trying to think. I think I can Yeah, I can I can get it get there from my property. [28:01] And then and I think they're so I know during the sale of I think it's this. So, maybe they're all eliminating cuz there were two Probably they are. But, the sale you only had one is out of the [28:20] I think it's possible. [28:23] Yeah. [28:24] Yeah, because [28:25] Now they have [28:26] Now they're They're going to change it to [28:29] the theories [28:32] If you If you choose any year you could just There's a sign out here. [28:37] Yeah. [28:40] two road So [28:47] Okay, I'll do that. [28:50] All right. Let me just see. [29:03] You know why? Because I think you got this set up that they can only [29:11] join audio again by phone. The way to kill it would be to take it all down and restart it because you won't be the fault. There's no way [29:30] So [29:32] there being settings in place and I think you just started this wrong, not [29:41] So he created [29:45] in the last 60 months and years. Because I'm not [29:50] seeing that. Cuz I'm literally I can't get them to unmute and it says they don't have sound or anything else. So ask the video. Unmute. They can't. [30:12] Just see. So that's you. Just see. [30:17] Hey guys, I'm unmuted now. [30:19] Okay, good. Good. Good. That was good. And then Laura [30:24] Laura 's sitting next to me so she can say yeah. Yeah, that's fine. [30:29] Just didn't want it to echo. [30:31] Oh, so she's Is she not the one that [30:37] I'm here. [30:38] Just sent the thing to her? [30:41] Yeah, we did and then we forwarded around so we've got both Laura and I logged in our computers next to each other. But we just don't want to [30:47] So you get that Stephanie hasn't got on there. So then let me [30:50] Do you have any of that? [30:51] I don't probably I'm going to have to type it in because I need the email. Yeah, wait. I got to get out of here and get into Gmail. [31:02] Yep. [31:02] Oh, gosh. Where did it go? YouTube. [31:20] What screen? Hold. And then I'll go to the email. [31:29] Remove. Let's see. [31:32] I sent this one. Now they will trust everything in it. I will forward that to [31:45] Now it's just let her know it's going to send to this Aaron Gasteen character which is made up. Gmail or [31:53] Yep. [32:12] Muted. All right. So we will send that to her. Hopefully [32:18] Yeah, as best as I can [32:19] I'm operating in the two [32:21] one through seven and most of it doesn't apply. Section seven. [32:24] Okay. [32:24] What's that? [32:25] The grading might expire because they're in the shipping or [32:30] They might require an erosion and sediment control plan. [32:35] Can we just put it out? [32:37] Oh, yeah. [32:38] Yeah. [32:38] Yeah. [32:39] Yeah. [32:39] No, that's not a question. [32:40] Yeah. Yeah. Yeah. Yeah. [32:42] Well, the only thing I can find that even remotely [32:44] I can see [32:47] Anytime we do that We could put it up for tonight. Yeah, it's already up. Yes, it's already up. [32:54] They got a self-tender. It runs roughly around there. 370 ft all the way around is probably right now, right here. [33:07] [clears throat] [33:07] This is actually [33:09] We have to have an emergency set up. [33:10] We should have [33:11] And there's [33:12] All right. [33:13] And we're in the haircut in the shoreline zone. [33:16] And which are the [33:17] Which is what that would be. The job is complete without the EPA [33:22] Yeah, okay. Let's [33:24] There you go. This is good. [33:26] Get what we are planning to do. [33:29] Oh. [33:29] This is what I was saying today. [33:31] No, we got to get it going with this. [33:32] Not the first time. [33:34] Yeah, now I can [33:35] So [33:35] Why shouldn't we [33:37] the [33:38] Never the same. [33:38] No, my God. [33:39] Yes, you've got it. [33:41] Yes, I am. [33:42] Yes, sir. [33:43] Yeah. [33:43] Tell us. [33:44] I know. [33:44] There was something [33:45] There is some curveball. [33:47] If I set it up usually, I know what I did. [33:49] Okay. [33:52] All right. [33:52] Yeah, I mean, I think he's probably just asleep. [33:55] Yeah. [33:56] You know. So [34:01] The orders are maybe 12 to 15 behind. [34:04] [34:05] That's all. [34:07] The main size [34:10] Yeah. [34:15] I don't have any questions on [34:16] Any other questions? [34:17] the most interesting paper profit LLC for the If you move on, share young. [34:34] S C [34:36] [laughter] [34:36] Is this a new apartment? [34:40] That was my attempt at being creative. [34:44] You have to be careful what you wish for. [34:46] Yes. [34:50] Are we Are we still in the same position we been in? [34:54] Yeah, that's why I was curious because I thought it went into litigation. [35:00] Yes. [35:00] And I mean, Chip, is that true? [35:05] Yes, we are a we are going to a mediation on December 10th. [35:12] Okay. [35:14] So, the way that the I thought we left it last time was that basically that what we proposed [35:26] you know, we're a non-conforming building on a very small lot that, you know, in terms of lot coverage area and setback we feel that we you know, we put something forth that is moving more towards conforming is not more non-conforming than the existing condition. [35:52] Therefore, you know however the boundary line gets resolved, whether it's here or 5 ft, you know, to either side it should technically not have any bearing on the site plan proposal. So, that's kind of that's [36:13] and I and I thought that was sort of agreed to be the case by some of the other members. I think the one thing that we were sort of looking for any sort of clarification on is, you know, based on the definition of the way the ordinance is written, specifically I think the definition of [36:37] increase in nonconformity. [36:42] whether the principal the primary structure, the principal structure, you know, which as we're showing it, moves slightly towards this various property, but doesn't move any closer than the current edge of the existing shed and [37:04] retaining wall that holds the shed. So, if it comes down to that, then, you know, we you know, that seems to be a decision before the planning board to and I thought that Bruce sort of said that, you know, they were going to look sort of closely at the ordinance as written. [37:25] I just I didn't see but in terms of just moving things forward, you know, our feeling was that where wherever the line ends up, you know, it doesn't really change anything about anything else about the proposal. [37:46] Now, Chip, have you done a survey? [37:49] no. we've done a survey that of where the lot line has historically been. I would disagree with Devin's characterization that it the different two lot lines you know, impact the the lot coverage in particular [38:11] because it does. But you know, it's up to you guys. the whole claim is an adverse possession one. that these surveys, as we saw on the other side of their lot, these surveys are all a little bit squirrely. so rather than spending another few thousand dollars to have another survey that's going to conflict with theirs, you know, [38:36] 50 years of our family living with this, maintaining this, having everybody agree that 's the line, is more than enough for any lawsuit, as Stephanie said in the last meeting. so we we could we were happy to you know, we've invested [38:56] more time and money than we want to in this point in this whole process, but you know, that is where we are at. [39:03] Okay. Thank you. Stephanie. [39:06] I'd say where we are actually is Tripp and Laura's attorney sent you a letter on September 8th with all kinds of issues, and Devin, who's in the room with you, responded to each of those items on September 9th, and if I'm hoping at this time, by the last meeting you had not read those two documents, [39:30] but at this point or shortly, I'm hoping you will have read them, because I think it clarifies everything about our proposal, which we've spent a year researching the code and working on with top architects and the code enforcement officer. And then, as Devin says in his response on September 9th, [39:51] in terms of the lot coverage, it does not actually technically matter where the lot line is if it's two or three feet one way or another. however, in the meantime, the Terrys have sued us in Maine for adverse possession, and we have both agreed to meet with a mediator in Portland [40:14] on [clears throat] December 11th, and if we don't come to a conclusion on the lot line, which is the only issue there, then we would go to trial. So, that's where we are, but I think if you revisit Devon's response, you'll see that it actually does not matter by the code and in our proposal where exactly that lot line is, if it's where Chip and Laura think it is or if it's where we think it is. [40:40] And they have not done a survey. They have asked a surveyor to draw a line where they'd like the line to be. That is not a survey, even if you want to label the piece of paper that way. [40:56] Anything else that has the board members seen that response from the It was in It was the letter from the lawyer first and then Devon, which was in red. Basically responded to everything. I have a [41:14] copy here. [41:16] I'm sure I've seen something. [41:18] I sent that out electronically quite some time ago. [41:22] Yeah, sometime. Yeah, that's [41:24] I mean, in terms of the lot coverage question, because the what we're proposing is less square footage than the existing. That whether, you know, I forget the lot line is one place or another, yes, it changes the starting condition of lot the lot coverage is now. [41:47] But, if it's reducing the overall footprint of what's counted in lot coverage, then it's moving towards more compliant, which seems to be the standard. [42:03] So, Devon, just to clarify on that one, your drawings actually include our wall when you did the line, so the lot coverage does change as a percentage. but you know, ignoring that for a second, I would love the board to actually review that. We also sent a deck around with a bunch of pictures. it was sent a while ago, a couple meetings ago. [42:24] hopefully it got to the planning board. I think it would be useful if the planning board had a chance to review that as well. Cuz I think it 's less legalese and more you know, visuals of what's actually happening there. [42:37] So, I would I wouldn't say that. I think you know, I don't want to get I will look at lot coverage, but I'm looking at the this boundary line issue and I think this is what Bruce was indicating the last time. So, for us in the boundary line dispute here, if it does not [42:57] it has to affect the setback requirements and it's difficult it's a it's a it's a We'll have to look at it again, but it's not necessarily whether what the boundary line is cuz it's non-conforming. [43:11] Right. [43:12] And I'm not sure it's affecting the setback requirements and then even if we went by that and skipped it, we actually technically do need under the ordinance a survey from the abutter the standard boundary line survey according to the ordinance to sort of have a consideration. [43:33] You know, and I'm not again, I'm not sure that would affect the issue of that. I will look at the lot coverage issue, but as far as the boundary line issue in this particular section of the ordinance and yeah, it's [43:47] And I think that's you know, you know, I will stipulate I think that's actually fair. and you know, I think you know, there are a lot of other issues with this. The boundary line is the one that's been you know, front and center for us. We're going to solve that outside of this planning board. I do think it covered the lot coverage issue is real, but I think there are other issues that I think this planning board needs to look at. [44:12] [44:12] Okay. Be on the lot coverage one or [44:15] Yeah. Yeah, there's a there's a whole series of issues related to this. we've spelled them out in our legal briefings, we spelled them out in the PowerPoint. I don't think the board has had a chance to actually digest those and go through those. I think that would be a really good use of either this time or some other time [44:33] Okay. [44:35] And Devon has responded to every one of those points in his letter of September 9th. in red. [44:48] I'm showing because it's non-conforming and so forth. And then it falls within the non-conforming I boundaries I didn't think was our purview as the planning board. [45:04] It's not. [45:05] Okay. [45:06] Yeah. [45:07] It's just that one [45:08] I think we're all in agreement that the boundaries going to be settled elsewhere. I think it's the other issues that we should actually look at. [45:14] I was wondering if we paused because of the boundary line dispute. [45:18] Yes. That's the decision point. [45:20] And it only matters if the boundary line dispute affects the setback requirement and it's already non-conforming, so it's kind of [45:28] Okay, I'll play devil's advocate. [45:31] Could we approve the project [45:35] with the caveat when the boundaries get fixed or when the boundaries get decided? [45:43] I think that would only the boundary line issue would only matter if it if it affected that setback requirement and it's already [45:50] Mhm. [45:50] it doesn't really matter because it's non-conforming. [45:53] Okay. [45:54] It's I think we have to look at the other issues potentially and make sure we've covered the lot coverage cuz the boundary line dispute at least as far as us making a decision what the other decision that is, no, but I don't think the boundary line dispute affects our ability to make a decision because it's the boundary line decision is irrelevant to the setback on this point because it's not changing. [46:18] Whether what structure [46:20] Yeah, I mean, we can do a lot. We just did it in the previous thing. Contingent upon what DEP wants. [46:27] Yeah. [46:27] I mean, I'm saying it's contingent upon [46:31] boundary line folks. [46:33] I think the better course then would be to defer the permit. [46:38] Well, that's you. [46:39] If there's some other issue in there that is affected by this dispute, whether that's not covered or something else, we should either defer the permit or figure something else out. [46:48] Usually in the past, as soon as it goes to the litigation, then we stop. [46:54] Yeah, it's you got a couple of decision points. One, the decision point one is whether or not the boundary line dispute affects the setback. And that's a motion in vote. Because that allows you the process to continue with regards to the local process. [47:14] [clears throat] [47:15] I think Chip said it and I think I agree that I agree that the boundary line dispute is not the town's purview. We don't get involved in boundary line disputes. That's a civil issue between the abutting property owners. [47:31] Whether or not you can continue to look at the project and rule on the project is really contingent on whether or not you think that it the boundary line dispute impacts the setbacks. [47:46] [clears throat] [47:46] But as Chris said, it's already non-conforming. [47:50] And then you get into the greatest practical extent bar. [47:55] You know. So [47:57] And Sean, just a clarifying question. If that line changes the lot coverage because they're actually including part of our built property in their lot coverage in the original Yeah, the baseline lot coverage. does that mean that they can't rule on it until that lot until that line is settled? [48:17] Well, again, I don't even know that they can discuss the project without tabling it for 120 days without figuring out that first decision point. [48:27] Yeah. I was just wondering are there two decision points? One is a setback thing, and the other is a lot coverage. There's sort of two separate questions. [48:36] But the boundary the Yeah, the [48:38] But the boundary affects both of those, I think. [48:41] But the ordinance says if there's a disputed boundary line disputes, tables it. If it impacts the setback, tables the application for 120 days. So, that to me is decision point one. And then once you get through that, then you can deal with the lot coverage and everything else, in my opinion. [49:00] Yeah, could I address the lot coverage? Because it is true that we include the part of the Terry's wall in our lot coverage calculation for the existing condition. We also include it in our proposed condition. So, if we remove it from counting it in our existing condition, [49:25] sensibly also gets removed. [49:27] No, that's Devon, that's not how the math works. If you take Yeah, if it's not in the baseline condition, you can't then include it in the you know, the new condition. [49:37] we [49:40] I've included it included it in the baseline condition because it 's there. It's on the property. [49:48] I know. You know, exactly. You have included it, and that's totally fine. [49:52] to us because you have to sue us for adverse possession to try to take it away. [49:56] I know, Stephanie. You've made it very clear that you know, it's important for us to you know, make sure that lawyers are employed for a long time. and we're doing that. But you know, really, you know, it's a simple math question. If you have a 100 ft in the baseline, that is not there in the new lane, then then the math changes for what you can build. [50:21] That's That's That's the you know, it's a numerator denominator problem. [50:26] Can I [50:26] That's That's not the math. That's not the math. If you read the Terry's lawyer's letter of September 8th, and then you read Devon's response on September 9th, it will clarify all those issues and what is the appropriate way to look at them by the code. [50:43] Yeah, I mean, I feel like we This is like if we're counting it in the existing, [50:51] we're also counting it in the proposed. So, if you're saying we shouldn't be including it in the existing, then we also shouldn't include it in the proposed. So, it cancels each other out. It just gets canceled out. [51:04] So, but that's not how you've done that. Cuz if you have less lot coverage in the you know, if you have more lot coverage because you're including our wall in your lot coverage at the baseline, and then you have a new lot coverage that doesn't change whether you include that or not, the ratio changes. [51:25] That's That's just the simple math. [51:28] Yes. [51:29] Yeah, if I have a lot that has 50% coverage and I and I build, you know, I double that size, you know, I have 100% coverage. If I have a lot that has 25% coverage and I double it, I get 50% coverage. It's just a numerator denominator problem. and yeah, it's not a big number. I will stipulate that it is not a big number, but it does change the math. [51:53] And Evan, [51:55] [laughter] [51:55] you didn't you have not shown that. [51:58] Stop. [51:59] Yeah. [52:00] Wait to be recognized by the chair. [52:03] so I will stop. Thank you. [52:08] They initially if this was taken out in the beginning would it be here discussing [52:19] if the 100 if the wall if it was taken out as part of the property right? [52:26] Yeah. [52:26] Right? If that was initially done would we be discussing it right now? [52:33] No, because the footprint of what we're showing in as the proposed which is all labeled all the pieces is less than the existing. [52:52] So [52:55] so regardless of whether the initial condition it is 49% lot coverage or 60 depending on where the boundary line is or what is included [53:08] the things that we are saying that are going to be new construction on the site is less square footage than the rest of the existing structures that we are showing in the existing conditions. And we and we documented all of that in our site I'm I apologize for being exasperated, but I feel like we went to a lot of effort to show [53:38] our show our work so to speak. So, it's it we can we don't need to have we don't need to argue about this. We have it all listed right here and we can just say is this a correct interpretation or not? So, I apologize for but I feel like we [54:00] we've addressed all of these concerns or we feel that we have and we should talk about them on their merits because we feel like we have a strong server response to whatever is being raised and if the board feels that they haven't then we can try to address it and remand it. [54:24] We're not saying that it's this way or the highway. We just want to hear from the board of what you know. [54:31] Well, that's why I'm asking you I'm asking the board of what we can make a decision on. [54:38] Yeah. [54:39] Are we comfortable with the look there? The boundary situation is going to be litigated. All right. So, is there anything else that we can do, John? [54:52] No, I think you need to My recommendation to the board would be to relook at Zachary McNally's submission. on or around September 7th or 8th. [55:08] Yeah, it was on the 9th. Devon responded on the 9th. [55:11] Devon's response back on the 9th. [55:13] Mhm. Do you mind rereading those to me, sir? [55:16] I absolutely can. I will reread them every day. [55:20] I know I saw one part of it just now. I can't lay my hands on it but I know I looked at it. [55:25] You can make copies and you can keep them. [55:26] Yeah, that's fine, too. Yeah. [55:30] Why don't you make copies of them? [55:33] Yeah, I have a copy here as well. [55:36] Yeah, I know I read it at one time. [55:52] That's the structure. [55:53] Yeah. [56:01] Let me think. [56:13] And just cuz I was glancing at the picture, when you say the wall, are you referring to the concrete wall? [56:21] it's there as well. So, what page are you looking at? [56:26] I read I think I'm looking at the [56:29] Is this photo [56:30] 15. It was a photograph, so I was just reorienting myself. [56:33] Yeah, so up if I just so I know that no, so we're referring to up along Water Street. [56:44] Oh, okay. [56:44] It's this right here where there's a stone wall. [56:48] Oh, okay. [56:49] Yeah, and stone wall. All right, now I see. So, that is the [57:02] No, that's the area I showed. This is that's essentially a stone wall. [57:18] That's essentially the thing that I'm looking at. [57:20] Yeah. [57:21] That's what exists. [57:22] Yes. [57:22] So, it's the [57:23] Yes. [57:24] So, I'm moving Does this include that? [57:28] Yes. [57:31] All right. [57:38] Yeah, so that Yeah, on page 20 you know, we're showing the proposed and that abutting deck and wall based on our calculations is 25 square feet. [57:54] Okay. [57:54] The lighter color [57:56] is Devon's response. [57:57] Yes. [57:58] to the lawyer's stone. [58:03] But, you know, we're we're counting that in both the existing and the proposed, just being consistent. Again, it's a bit of a weird situation, but we're counting whatever is considered structure that's within what our surveyor [58:21] says is the boundary. [58:22] says is the boundary line. [58:23] So, there. [58:24] Yeah. [58:24] Yeah. [58:25] Again, that will be resolved separately, but it's either it either gets counted in both or not counted is sort of how it works. [58:37] [clears throat] [58:38] What we did [58:41] Sure. Devon, just a question for you. there's a bunch of the structure that's also on the Collard Archies property according to your existing conditions report. Did you include any of that in any of your calculations? [58:55] No, because it's not on the property that [59:02] So, okay. So, if we go back cuz when I did the back of the envelope math, it didn't appear that you were. And I know in the earlier meeting you said you'd included it for some things and others not. So, I just want to make sure that we're clear what's included and what's not. [59:16] Yes, so they're two different things. So, we included it for the floor area calculation. Because we thought that even though the structure is and again this was a line a boundary line amendment. [59:37] So we counted that area of the building as it was existing because it's part of the whole building. So we counted that. and Yeah, we felt like it [59:53] So I think the board will need to rule on that as well. Of whether you know, it is fair to include in the existing conditions things that are actually not on the property. [1:00:06] Is it on the [1:00:08] Well, yeah, so I mean that this is a very odd situation, but I guess [1:00:20] And yeah, the board may have a have a feeling about that, but we included parts of structure of floor area that were you know, basically continuous [1:00:38] building structures that have area. So we included that in the area calculation for the existing. [1:00:47] Yeah. Just looking at your survey here, it appears that one of the sheds is 90% of it off the property. and the house itself appears to be partially off the property. So that would be one issue that I think the board should look at. I would like the board to also look at the shed issue. [1:01:10] we shared a video a overview document or aerial photo, sorry, from the state of Maine from 1990 shows no sheds there. there is no permitting of the sheds since 19 before you know 1989. [1:01:30] there's no permitting since 1989. I do not believe you can include either of those sheds in this thing, but that's for the board to rule on. But they weren't there in 1990, and they were never permitted. And you've had testimony from another neighbor that says that yeah, heard from Penny Doolittle that they put them in illegally. [1:01:50] so and we heard from Shawn early on that the the burden of proof is on the you know on the Shears to prove that they were put in legally. [1:02:01] No, the burden of proof is the other way, but thank you. [1:02:04] Well, we now proved it, so whatever it proved you know, but no, the regulation says that way. so let's say yeah, the So I think those two are real. I also think we should look at the the deck. you know, Devin, how did you measure the deck on the front of the house? [1:02:30] I measured it from [1:02:34] This seems like it's becoming more fair meaning than yours. [1:02:37] Yeah, I'm I'm [1:02:39] [clears throat] [1:02:39] We should We should probably end up [1:02:41] I just have I just have one question Chip, and that is that on the volume calculation is the issue that you're raising I think I understand what you mean about the 30% issue. Is that Am I correct? [1:02:56] so basically the yeah, so the yeah, they are allowed as I understand by regulations to increase the volume of the house by 30%. [1:03:04] Okay. And you're saying they're going over that by including certain things they shouldn't. [1:03:09] Exactly. There are two sheds that make up about a third of the calculated baseline that shouldn't be in there. the the deck Devon kind of measured it because it was torn off the front of the building over 2 and 1/2 years ago. But, it's included in the measurements. it shouldn't be included there as well. [1:03:32] so there you know, we've laid all of these issues out in that PowerPoint. I just re-forwarded it to Shawn. Hopefully, he can send it back around to you guys. [1:03:40] Okay. [1:03:41] Yeah. I do think these are real issues. the survey thing is one, but you can decide you know, that doesn't matter and that's fine. but there are other real issues with this. you know, you have a property that's very small. You have a lot that's very small. [1:04:02] and you know, this building sold at 614 square feet. it you know, is a lot of 30% increase? That's fine. but you know, it appears to be more than double in size. [1:04:21] well, the laundry shed and the wood shed are only 500 cubic feet. [1:04:26] So, yeah, whatever however you got to your calculations, you know, all of these things I think the board should do this. I you know, I've included a spreadsheet in my PowerPoint about how these calculations seem to have been made. I think it you know, they're real issues to look at. [1:04:47] Thank you. We'll we'll take a look at it. [1:04:50] Yeah. [1:04:52] Yeah, with the with the wood shed and the other area be taken out of those square feet. [1:04:59] If that's consistent with you know, precedent. [1:05:04] Sure. [1:05:05] Mhm. I think we want to hear I think we agree that we want to hear what the board's interpretation is because we made an interpretation based on trying to read the ordinance and see what's there and what's based, you know, what seems like has been historically [1:05:25] sort of approved. we can amend the design certainly, but we want to do it based on you know, feedback from the board. [1:05:37] Do you have any other questions at all? [1:05:40] No. [1:05:40] You're good. All right. Stephanie, any other questions at all or input? [1:05:47] [1:05:48] no, it would just be helpful if you were able to read all that information and I think it lays it out and we've done our best effort over the last year to respond appropriately to the ordinances and build an incredibly thoughtful and lovely and [clears throat] considerate plan and I hope you will read all the information you have and [1:06:12] give us approval or feedback that we can work with. [1:06:17] Chip, anything? [1:06:19] No, yeah. I appreciate you guys digging in on this. I know this is not an easy decision. yeah. I do think you know, it would be helpful to read all the documents or you know, be able to ask us questions on them cuz I you know, I think they're one of the other issues that we haven't brought up is whether this is a relocation or rebuild. [1:06:44] if this is a rebuild and more than 50% of the property was destroyed, then my understanding is that it needs to be fully conforming. If it's a relocation, then it's allowed to move up and back. and so you that's my understanding of this. [1:07:04] they call it both a relocation and a rebuild in their submission. [1:07:09] Thank you. Anything else? [1:07:17] Sean, do we have anything else? No. Do I have a motion to adjourn? [1:07:25] Second. [1:07:29] Thank you. [1:07:29] Thank you. [1:07:31] Thank you, guys.